A Civil Engineering, Program Management and Construction

•Program Management • Construction Management • Water & Wastewater Engineering • Stormwater Engineering • Water Resources Engineering • Environmental...

20 downloads 766 Views 3MB Size
CIVIL ENGINEERING CAS Consulting

Program Management • Construction Management • Water • Wastewater Stormwater • Transportation • Environmental

CAS Consulting

A Civil Engineering, Program Management and Construction Management Firm CONTACTS CERTIFICATIONS

Channy Soeur, PE CEO [email protected] (512) 825-8989

City, State & Federal

Gary Stegeman, PE Vice President, Water & Wastewater Engineering [email protected] (512) 825-1581 Lino Rivera, PE Vice President, Transportation & Program Management [email protected] (512) 826-3551 Henry Leighton, PE Vice President, Environmental & Construction Management [email protected] (512) 964-8823 Gary Smith, PE, BCEE Vice President of South Central Texas [email protected] (210) 248-8435 Joanna Butera Director of Marketing [email protected] (512) 222-1262

City of Austin - MBE & DBE City of Houston - MBE City of San Antonio - SBE South Central Texas Regional Certification Agency (SCTRCA) MBE, SBE, ABE, & ESBE North Central Texas Regional Certification Agency (NCTRCA) MBE State of Texas Historically Underutilized Business (HUB) Small Business Administration (SBA) 8(a) firm

TxDOT Pre-Certifications 2.4.1 2.4.2 2.4.3 4.1.1 4.2.1 8.1.1 8.5.1 9.1.1 10.1.1 10.2.1 10.3.1 10.4.1 10.5.1 11.1.1 14.1.1 14.2.1 14.3.1

Nationwide Permit Individual Permits U.S. Coast Guard USACE Permits Minor Roadway Design Major Roadway Design Signing, Pavement Marking and Channelization Highway-Rail Grade Crossings Bicycle & Pedestrian Facility Development Hydrologic Studies Basic Hydraulic Design Complex Hydraulic Design Pump Stations-Hydraulics - pending Bridge Scour Evaluations & Analysis Roadway Construction Management & Inspection Soil Exploration Geotechnical Testing Transportation Foundation Studies

NAICS Codes 541330 541620 236210 237110 237310 237990 238910

Locations Austin 7908 Cameron Road Austin, TX 78754 (512) 836-2388 (512) 836-4515 fax Corpus Christi 555 Carancahua Street Corpus Christi, TX 78478 (512) 836-2388 Dallas 1820 Regal Row, Suite 200 Dallas, TX 75235 (214) 208-2945

Engineering Services Environmental Consulting Services Industrial Building Construction Water & Sewer Line & Related Structures Construction Highway, Street & Bridge Construction Other Heavy & Civil Engineering Construction Site Preparation Contractors

Houston 6588 Corporate Drive, Ste. 168 Houston, TX 77036 (713) 588-0198

We exceed expectations.

San Antonio 14100 San Pedro Avenue, Suite 405 San Antonio, TX 78232 (210) 248-9083 (210) 248-9155 fax

www.casengineers.com

Visit www.casengineers.com State of Texas Registered No. F-3572

• Program Management • Construction Management • Water & Wastewater Engineering • Stormwater Engineering • Water Resources Engineering • Environmental Engineering and Field Support • Transportation Engineering

About CAS CAS Consulting & Services, Inc. started in 1999 in Austin, Texas, providing civil engineering consulting. Currently, we serve the Austin,

Northwest C Pump Station

CAS Corporate Headquarters, Austin, Texas

Corpus Christi, Dallas, Houston, and

San Antonio markets. Today, our services encompass Program Management, Construction Management, Water and Wastewater Engineering, Stormwater Engineering, Water Resources Engineering, Environmental

Waller Creek Tunnel Program

Trainer Hale Road at Woman Hollering Creek

Water Resources / Stormwater Engineering

Engineering / Field Support and Transportation Engineering. • Groundwater Management Program

• Drainage Design

• Water Treatment Plant Evaluation and Design

• Erosion Control

commitment to quality service, responsiveness and technical excellence for every project. We offer customized

• Pumping Station and Storage Tank Design

• Water Quality Master Plans

client services to solve project challenges efficiently and within allocated resources.

• Water Modeling / Watershed Modeling

• Water Quality Pond Design

• Reservoir Analysis and Design

• Detention / Retention Pond Design

• Groundwater Studies

• Floodplain Analysis and Management

• Water Rights and Water Conservation Programs

• NPDES Municipal and Industrial Stormwater Permits

CAS is an MBE, DBE, SBE and SBA 8(a) certified firm. Our basic philosophy is “to provide professional technical services in a manner which exceeds our customers’ expectations.” The CAS team emphasizes

• Water Demand Projections

Channy Soeur, PE Chief Executive Officer

and Management Plans

• Facility Siting Studies

• Bridge / Culvert Hydraulic Design

• Hydrology and Hydraulics

• Bridge Scour

• Water Quality Studies Water Quality Modeling for Urban

• Bid Phase Services

Runoff and Receiving Water

• Construction Management

• Flood Control

• Claims Management

Project Experience Onion Creek – Williamson Tributary Box Culvert Upgrade at Covered Bridge Drive. Due to the lack of flow capacity and to meet the ultimate Gary Stegeman, PE

Henry Leighton, PE

Lino Rivera, PE

Engineering

Construction Management & Environmental

Program Management & Transportation

Vice President

Vice President

Vice President

Laura Soeur

Gary Smith, PE, BCEE

San Antonio

South Central Texas San Antonio

Chief Operating Officer

Vice President

development condition, the City of Austin commissioned CAS to improve the existing drainage structure for this Williamson Creek tributary. Services Provided. Services included HEC-RAS modeling, preliminary and final design, cost estimating and construction phase services for additional box culverts and raising the road approximately 1.5 feet. We also relocated a 16-inch water main and 12-inch sewer line; mitigated erosion problems upstream and downstream, and increased conveyance through the crossing by the design of a gabion wall. Additionally, we provided traffic control plans, erosion and sedimentation control plans, tree protection, and stormwater pollution prevention planning and design.

Joanna Butera

Director of Marketing

Paul Shattuck

Engineer in Training San Antonio

Doug Nichols, PE Drainage

Brandy Faith CAD

Ashely Hanson, PE Civil

Mike Carpenter Inspector

Chelsea Solomon, PE

Virginia Chhay

Ellen Bargainer

Terrance Lang

Water/Wastewater

Adminstrative Assistant & Marketing San Antonio

Financial Manager

CAD

San Antonio

Covered Bridge Project

Walnut Creek Stabilization

Ground Storage Tanks

Jollyville Transmission Main

McDonald Observatory Water & Wastewater Improvements

South IH-35 Water & Wastewater Program

Water and Wastewater Engineering

Austin Clean Water Program

Cap Metro Commuter Rail

Clients

• Wastewater Re-use Studies

• Sewer Collection Systems Design and Sewer System Rehabilitation

• AECOM

• Freese and Nichols, Inc.

• NPDES Permitting Applications

• Trenchless Technology Design (Tunneling, Pipe Bursting, CIPP

• Air Force Civil Engineering

• Guadalupe-Blanco River

• Infiltration / Inflow Analysis

Airport & Chesterfield Wastewater Improvements

Lining, Jack and Bore)

Center • Austin Independent School

Authority

• San Antonio Water System (SAWS) • RPS

• HDR, Inc.

• Tan International

• Jacobs Engineering Group,

• Tarrant Regional Water District

• CMOM

• Force Main Design

• Sanitary Sewer Evaluation Study (SSES)

• Grinder Station Design

• Water and Re-use Water System Design

• Lift Station Hydraulic Design

• Bexar County

• Water Distribution System Evaluation and Design

• TCEQ CCN Reports / Applications

• Black & Veatch

• KBR

• Water and Wastewater System Master Planning

• Wastewater Master Plan

• Bury

• Klotz & Associates

• Texas Turnpike Authority

• Construction Phase Services

• Water and Wastewater Treatment

• Capital Metropolitan

• Lackland Air Force Base

• Texas Water Development

District (AISD)

Transportation Authority

• Water and Wastewater Hydraulic Modeling

• Carollo Engineers

Inc.

• Lower Colorado River Authority (LCRA)

• Texas Department of Transportation (TxDOT)

• Travis County

Project Experience

• Cintra-Zachry

• MWH Constructors, Inc.

• TRC Companies, Inc.

SAWS Western Extension B Sanitary Sewer Improvements. The purpose of this project is to decommission two existing lift stations and replace the force

• City of Austin

• S & B Engineers and

• University of Texas at Austin

mains with gravity sewers. This project is located in the Upper Leon Watershed within the Edwards Aquifer Contributing Zone and the 100-year

• City of Corpus Christi

Constructors, Ltd.

• University of Texas System

floodplain in northwest Bexar County along IH-10. The rock formation inside this area is generally made up of “karst” limestone.

• City of San Antonio

• SAM, Inc.

• URS Corporation

Services Provided. CAS prepared decommissioning plans for the Falcon Center Lift Station and Woodland Hills Lift Station and designed

• CP&Y

• San Antonio River Authority

• U.S. General Services

approximately 18,700 linear feet of 33- to 42-inch gravity wastewater interceptor with approximately 2,900 linear feet of tunneling. The design

• Dallas Water Utilities

(SARA)

South IH-35 Water & Wastewater Program

Board

Administration (GSA)

also included abandoning 16,600 linear feet of 12-, 10-, and 8-inch force mains. CAS conducted sewer modeling to size gravity sewer mains (42-inch) on three piping alignments, successfully coordindating spatial conflicts with modeling used to ensure that design peak flows in the proposed pipes would not exceed 95% of full pipe flows, as required by SAWS. Within the vicinity of the project site, there also exists a

Awards

cemetery, school, county park, and a neighboring military base.

• Henry Leighton named ASCE (Austin Chapter) Civil Engineer of the Year 2013

Along with the wastewater improvements, the project also includes the following civil engineering related services:

• 2011 Small Business of the Year (Greater Dallas Asian American Chamber of Commerce)

• Concrete Abutment Expansion

• 2010 Small Business of the Year (City of Austin Department of Small and Minority Business Resources)

• Street and Driveway Replacement

Green Water Treatment Plant Decommissioning

• 2009 Spirit of Texas Award Nominee from the State of Texas Governor Rick Perry

• Boring under IH-10

• Austin Clean Water Program was recognized by the International Right-of-Way Association (IRWA) as

• Erosion and Sediment Control

one of the Top 10 North American infrastructure projects of the past 75 years

• Traffic Control • Concrete Driveway Repair

• 2008 Outstanding Small Business Excellence Award from the Network of Asian American Organizations

• Creek Stabilization

• Mabel Davis Park Landfill Remediation project received the Texas Council of Engineering Companies

• Waterline Relocation

2007 Engineering Excellence Awards Silver Medal for outstanding contribution in the environmental category Jollyville Transmission Main Airport & Chesterfield Wastewater Improvements

Water Treatment Plant No. 4

Austin Clean Water Program

Waller Creek Tunnel Project

Jollyville Transmission Main

Program Management • Planning and Schedule Development, Establishment of Key Milestones and Parameters

Cap Metro Commuter Rail

ABIA East Runway Perimeter Road

SH 130 Toll Road Segments 1-6

Enviromental Engineering and Field Support • QA / QC Plan Development • Regulatory Agency Coordination

• Integrated Management Information System Development

• Health and Safety

• Budget and Cost Management

• Constructability Reviews

• Project Delivery Analysis

• Risk Analysis, Management, and Avoidance

• Communications Planning

• Specification and Plan Review

• Site Closure Planning, Design, and Execution

• PPE and Equipment Inventory, Housekeeping, SWPPP

• Operation and Maintenance of Remediation Systems

Inspections / Maintenance

• Waste Collection and Handling

• Pollution Control Program Development

• Spill Prevention Control and Countermeasures

• Closure Support (Equipment Operation, Small

• Environmental Survey and Baseline Studies

Excavations, and Decon Pad O&M)

• Environmental Impact Analysis

Project Experience

Project Experience

Austin Clean Water Program. Faced with addressing an EPA-issued Administrative Order to eliminate sanitary sewer overflows from its wastewater

Hornsby Bend Biosolids Management Plant Master Plan. The project involves the development of a Master Plan for AWU’s Hornsby Bend Biosolids

collection system, the City of Austin formed a collaborative Program Management Team with AECOM (formerly Earth Tech). The program

Management Plant. Services included an overall evaluation of the Plant’s assets, processes, systems, and infrastructure to determine and

consisted of the planning, design and construction management of new and rehabilitated wastewater collection facilities throughout the City.

recommend the least life-cycle cost-based, most environmentally sound, and neighborhood-friendly approach to meet the short- and long-term

Over 100 separate projects were completed at a final construction value of $287 million. These projects included installation of 78 miles of new

utility biosolids processing needs from the Plant.

sewers (including 5 miles of large diameter tunnels) and 2,375 new manholes, plus rehabilitation of an added 119 miles of pipelines. As a result

Services Provided. CAS provided environmental engineering as a subconsultant to CDM including field sampling, equipment inventory and

of the Program, a 98% reduction in overflows was experienced between 2002 and 2009 with the remaining 2% being outside the Program area.

assesment, and asset management.

Services Provided. CAS, as a subconsultant to Earth Tech, provided highly-trained professional staff to fill critical roles in overall program management including Construction Manager, Project Manager, Program Scheduler, and Office Engineer. CAS staff provided program management consulting services in areas of fast-track permitting; easement acquisition management; project management including program schedule, cash flow planning, and reporting; and construction management.

Holly Power Plant Decommissioning. The Plant, originally constructed in 1960 and shutdown in September 2007, was determined to be removed by Austin Energy due to its close proximity to a residential neighborhood that has increased in density over the 47-year life of the facility. The $25 million project consists of decontamination and decommissioning the facility including: construction of temporary road and scale; decontamination, demolition and / or removal of equipment, tanks, boilers, structural steel and associated buildings; removal of contaminated soil; and closure of

Construction Management • Site Engineering / Resident Project Representative

• Project Delivery Analysis

• Construction Inspection

• Bid / Solicitation Support

• Change Order / Claims Analysis, Negotiation, and Management

• Work Flow Development and Management (Submittals, RFIs,

• Value Engineering

Project Experience - Field Support

Correspondence, etc.)

• Budget Management and Control, Cash Flow Analysis

• Stormwater Pollution Prevention Plans (SWPPP)

• Cost Estimating

• Emergency Response Planning

cooling water intake and discharge structures submerged in Lady Bird Lake. Services Provided. CAS performs installation of piping and pumping systems for disposition of fluids collected on-site; collection and disposition of water; equipment operation (forklift, water truck, backhoe); decontamination of all trucks and equipment; and other general labor tasks as directed. In addition, CAS staff operates the on-site water treatment package system including: interpretation of instrumentation, operating system equipment, operating valves to route and control flow, making process control adjustments; diagnosis of operating problems and performing necessary corrective actions; performing routine maintenance; and coordination of batching operations with site waste disposal engineer.

Project Experience

Transportation Engineering

Project Experience

Water Treatment Plant No. 4 Construction Manager at Risk. As a replacement for undersized and aged water treatment infrastructure, the new 300

• Collection of Traffic Data

Capital Metro Commuter Rail. As their inaugural venture into commuter rail service, Capital Metro’s

million gallon per day plant consists of water treatment facilities, a raw water intake and tunnel reaching under Lake Travis, pump stations, and

• Roadway Geometric Design

first project included the design and construction of 32 miles of commuter railroad and nine rail

pipelines, taking water from Lake Travis through the plant and connecting to the water system 7 miles away at the Jollyville Reservoir.

• Traffic Control Plans

stations, connecting the City of Leander to downtown Austin. The scope of work included the

Services Provided. Under subcontract to MWH Constructors, CAS provides highly-trained professional staff to fill critical roles on the MWH

• Signage and Pavement Marking Design

CMAR Management Team including Procurement Manager and Tunnel Superintendant. As Procurement Manager, CAS is responsible for all

• Culvert / Bridge Hydraulic Design

construction procurement including preparation of solicitation documents, scope definition for construction packages, subcontractor evaluations,

• Bridge Scour Studies

Services Provided. As a sub-consultant to URS Corporation, CAS provided design of detours,

and finalization of subcontracts for specific solicitation packages. As Tunnel Superintendant, CAS serves as a tunnel and shaft inspector for the

• Commuter Rail Design

temporary traffic controls, and final signage and striping plans for construction of at-grade

• Pedestrian and Cycling Amenities Design

crossings. This design was prepared using both TxDOT and City of Austin standards with details

Raw Water Intake System, acting as first line of monitoring, inspection, and quality control for the two raw water tunnels, subsurface pumping gallery, and marine work for the Lake Travis inlet structure.

referenced mainline tracks and stations, turnouts, sidings, at-grade crossings, and a rail-car maintenance facility (including a railcar shelter, maintenance pit, and fueling area).

driven by the TxDOT Manual on Uniform Traffic Control Devices.