An Integrated Approach to Cement Evaluation

Gunnar DeBruijn Sugar Land, Texas, USA

Cement sheath evaluation is enhanced when engineers consider cement evaluation

Anouar Elhancha Polina Khalilova Pavel Shaposhnikov Gioconda Tovar Houston, Texas

slurry placement. Such an integrated approach helps engineers confirm the presence

Paul Sheperd Denver, Colorado, USA Oilfield Review 28, no. 1 (January 2016). Copyright © 2016 Schlumberger. For help in preparation of this article, thanks to Eve Le Bastard, Grabels, France; and Chew Yeong Leong, Houston, Texas. CemSTRESS, Invizion Evaluation, Isolation Scanner, Techlog and USI are marks of Schlumberger. 1. Nelson EB: “Well Cementing Fundamentals,” Oilfield Review 24, no. 2 (Summer 2012): 59–60. 2. Standoff is defined by the API as: w in which r hole is the hole diameter, standoffAPI = r – r hole pipe r pipe is the casing diameter and w is the smallest annular gap. Guidelines concerning recommended standoff values are also published by the API. American Petroleum Institute: API Specification 10D: Specification for Bow-String Casing Centralizers, Washington, DC: API (March 2002). American Petroleum Institute: API Standard 65—Part 2: Isolating Potential Flow Zones During Well Construction, Washington, DC: API (December 2010). 3. Smith RC: “Successful Primary Cementing Can Be a Reality,” Journal of Petroleum Technology 36, no. 11 (November 1984): 1851–1858. Crook RJ, Benge G, Faul R and Jones RR: “Eight Steps Ensure Successful Cement Jobs,” Oil & Gas Journal 99, no. 27 (July 2, 2001). Bittleston S and Guillot D: “Mud Removal: Research Improves Traditional Cementing Guidelines,” Oilfield Review 3, no. 2 (April 1991): 44–54. 4. Free fluid is the volume of the particle-free liquid that separates from a stationary cement slurry. Free fluid is measured by pouring a cement slurry into a graduated cylinder and allowing the cylinder to remain undisturbed for 30 minutes. A technician measures the particle-free liquid volume, which is expressed as a percentage of the total slurry volume. Free fluid is minimized during cement slurry design. For more on free fluid measurement: American Petroleum Institute: API RP 10B–2: Recommended Practice for Testing Well Cements, Washington, DC: API (July 2005). 5. For more on cement sheath evaluation: Allouche M, Guillot D, Hayman AJ, Butsch RJ and Morris CW: “Cement Job Evaluation,” in Nelson EB and Guillot D (eds): Well Cementing–2nd ed. Houston: Schlumberger (2006): 549–612.

10

logs in the context of events that took place during drilling and subsequent cement of zonal isolation or determine why isolation has not been achieved. In the latter case, a complete well history analysis offers operators valuable guidance for improving future cementing operations.

Primary cementing operations rank among the more important events that occur during a well’s lifetime. The cement sheath plays a critical role in establishing and maintaining zonal isolation in the well, supporting the casing and preventing external casing corrosion. Well cementing involves a myriad of geologic, chemical and mechanical parameters. The operation may be divided into several principal activities—drilling the wellbore, casing the wellbore, placing the cement slurry in the casing to wellbore annulus, allowing the cement to set and then evaluating the quality of the resulting cement sheath.1 Secondary considerations may include remedial treatments to correct cementing problems and the long-term effects of production on cement sheath integrity. Primary cementing requires the wellbore to be in a condition that is conducive to successful cement slurry placement. For example, the borehole should be free of washed-out, out-of-gauge zones. Caused either by soft or unconsolidated formations or as a result of drilling practices, washouts create irregular and enlarged boreholes that are difficult to clean up and tend to hold gelled or dehydrated drilling fluid that can contaminate the cement slurry. Because they also create voids in the borehole wall that must be filled with cement, washouts must be factored into cement volume calculations. To determine the location and volume of washouts, engineers usually perform openhole caliper measurements

prior to running casing. In the absence of a caliper measurement, the cement volume must be estimated. When designing the cement job, engineers may also be guided by other formation considerations, including pore pressures, fracture gradients and the locations of potential lost circulation zones. As the casing is run in the hole, centralizers installed on the outside of the pipe establish a standoff between the casing and the wellbore that provides open flow paths in an annulus. The general guideline for centralization is to maintain a casing standoff sufficient for effective mud removal and cement sheath coverage.2 When the casing is poorly centralized, annular constrictions can trap drilling fluid between the casing and the wellbore, preventing complete cement coverage. This problem is exacerbated as a well’s deviation angle increases. For many years, the industry has employed strategies to promote optimal cement placement results. These strategies, collectively known in the industry as good cementing practices, dictate that drilling fluid be conditioned prior to a cement job.3 Conditioning is a process of homogenization, cuttings removal, gelled mud dispersal and adjustment of rheological properties to facilitate cementing. Many cement placement simulators provide recommendations that address drilling fluid conditioning. In the absence of cement placement simulators, cementing personnel commonly circulate at least one annular

Oilfield Review

volume of drilling fluid before pumping the cement slurry. This precaution is carried out after casing is run to remove entrained gas and cuttings, break the fluid’s gel strength and lower the fluid’s yield stress and plastic viscosity. However, such broad measures may be questionable in light of the highly diverse and increasingly complex wells being drilled today. Chemical washes and spacer fluids are pumped ahead of the cement slurry to facilitate removal of drilling fluid and prevent commingling of the drilling fluid and the cement slurry. The types and volumes of washes and spacers are selected on the basis of the drilling fluid properties and hole geometry as well as the physical and chemical environment downhole. When feasible, casing movement—in the form of reciprocation, rotation or both—is performed while circulating drilling fluid and while pumping preflushes and cement slurries. Casing movement helps reduce drilling fluid viscosity and dislodge gelled drilling fluid from annular constrictions, thereby providing an improved environment for cement placement. The cement slurry is designed to perform within the parameters of the anticipated wellbore environment. Accurate temperature and pressure data are essential inputs to the design process. Cement parameters that must be optimized include rheological properties, thickening time, strength development, permeability, free fluid and long-term durability.4 During job execution, care must be taken to prepare the preflushes and cement slurries according to the design and to pump these fluids at the planned rates to ensure successful cement placement. The wellhead pressure must also be examined throughout the operation to verify that the fluids are being placed properly and that the well is under control. Modern cement mixing and pumping equipment is fitted with sensors that allow engineers to closely monitor and record these parameters. After the cement sheath has set and hardened, logging helps engineers ascertain the quality of zonal isolation.5 Log interpretation can be improved if logging personnel are informed of previous drilling and cementing activities as well as the physical properties of the cement. Information about hole geometry, potential lost circulation zones, mud type, spacer fluid and cement properties, pressure testing and unusual events that occurred during drilling and cementing may help logging engineers properly calibrate tools and ensure that sufficient logging data are obtained for cement sheath evaluation. Building on established cementing practices, a system for

January 2016

Drilling

Cement Placement

Cement Sheath Evaluation

Drilling fluid compositions

Preflush, spacer and cement slurry compositions

Cement bond log

Drilling fluid rheological properties Rate of penetration Weight on bit Torque, shock and vibration data Lost circulation zone locations Washout locations Wellbore geometry Mechanical earth model (wellbore stability) Lithology Resistivity Casing plan

Preflush, spacer and cement slurry rheological properties Circulating temperatures Static temperatures Cement slurry thickening times

Variable density log Acoustic impedance Flexural attenuation Third interface echo Solids presence map

Cement strength development Centralizer program Casing movement during displacement Cement displacement simulation Cement acoustic impedance simulation

Pressure and temperature

Figure 1. Well properties and measurements for the Invizion Evaluation service. Well integrity engineers analyze many types of data to generate an Invizion Evaluation presentation that shows drilling measurements, cement placement data and cement sheath evaluation logs.

rendering all relevant information into a compatible format allows a more efficient and thorough analysis of the principal parameters influencing primary cementing and zonal isolation. Schlumberger engineers have developed a technique by which logging personnel and operators may easily view and analyze previous well events, thereby improving log interpretation. This article presents case histories from Alaska, Colorado and Texas, USA, and from the Gulf of Mexico. These cases illustrate how performing a comprehensive examination of the entire well construction process can help engineers verify primary cementing success or diagnose why cementing objectives have not been met. In the latter case, the lessons learned can provide guidance for remediation and improving results in future wells with similar parameters. Integrated Cement Evaluation In the context of well cementing, the concept of following a cementing operation from the design stage through the execution stage and to the evaluation stage has existed for some time. Accordingly, Schlumberger has organized dedicated teams of drilling, geomechanical, logging and cementing engineers that perform multidisciplinary analyses of virtually all parameters relevant to the lifetime of a well. A community of these engineers is located at Schlumberger PetroTechnical Engineering Centers (PTECs) around the world. Their principal objective is to provide operators with information to safely and efficiently construct wells and maximize well

productivity. The engineers gather the data and arrange the information in a workflow that allows offset well histories to be used during well planning. Within the PTECs, multidisciplinary teams of well integrity engineers (WIEs) collaboratively analyze many well parameters and arrange the information in a workflow that allows straightforward visualization of the history and current status of a well. At key junctures, the WIE teams are also able to remotely monitor and analyze the current status of a well. Because the datasets frequently come from various sources in a variety of formats, they must be normalized to allow a coherent examination. Engineers accomplish this task by entering the data into the Techlog wellbore software platform. The platform consists of a comprehensive set of modules that accommodates the myriad types of data acquired during a well’s lifetime. An interactive graphical user interface allows engineers to evaluate details throughout the entire well construction process. The WIEs use the software platform to collaboratively examine formation geology and petrophysics, well geometry, drilling events, drilling and cementing fluids, cement placement events and cement sheath evaluation logs (Figure 1). The information is arranged into a chronological account of well events that is used in the newly developed Invizion Evaluation well integrity service. Ancillary data such as laboratory test results and modeling predictions may be displayed in separate windows on the presentation.

11

Cementing Depleted Sands in Alaska An operator in Alaska is producing from a reservoir characterized by depleted sands, potential lost circulation zones and a narrow fracture pressure window. The wells have deviation angles up to 60° and the producing interval lies between 9,800 and 10,060 ft [2,990 and 3,070 m]. The bottomhole static temperature (BHST) is approximately 150°F [66°C]; the temperature at the anticipated top of cement (TOC)—about 4,000 ft 1

2

3

4

[1,200 m]—is 75°F [24°C]. A retarder was added to the cement slurry to prevent premature setting at the TD; however, the retarder also presented risk of slurry overretardation at the TOC depth. Because of the narrow fracture pressure window, a low fluid density contrast was necessary to avoid well failure.6 The densities of the drilling fluid, spacer fluid and cement slurry were 10.4, 11, and 11.5 lbm/galUS [1,250, 1,320 and 1,380 kg/m3], respectively. State regulations require that, before continuing operations, engineers must confirm the location of the top of cement and verify the presence of competent cement around the circumference of the casing. Because of the small density contrast between the wellbore fluids, the operator typically had to wait several days after the cement job for the set cement to develop an acoustic signature that 5

6

7

Wellbore Quality Well Schematic

Gamma Ray

Deviation

8

9

would be discernable by most wireline logging tools. The delay was expensive in terms of rig time. To determine whether cementing and logging could proceed more efficiently while reducing the waiting-on-cement (WOC) time, the operator elected to use the Invizion Evaluation service. The engineers were provided with data gathered during drilling and cementing along with the compositions and rheological properties of the wellbore fluids. The well deviation created a narrow side of the annulus, where cement contamination by mud would be more likely. Knowing the rheological properties of the drilling fluid, spacer fluid and cement slurry, the engineers performed cement placement simulations to obtain guidance for preventing such cement slurry contami10

11

12

Resistivity

Porosity

Cement Annular Density

Casing Standoff

Cement Simulated Coverage

13

14

Flexural Attenuation

Solids, Liquids and Gas Map

Cement Evaluation

Cement Design and Placement Simulation Acoustic Impedance Map

Mud Displacement Simulation

Acoustic Impedance

Flexural Attenuation Map

Maximum 0

Bulk Density

Depth, ft

Well Schematic

Gamma Ray 0

gAPI

Deviation 150 0

degree

A16H 90 0.2

ohm.m 2,000 45

g/cm3

Thermal Neutron Porosity %

Between Centralizers

2.95

–15 1

Cement Annular Density g/cm

3

0 2 0

%

100

At Centralizers

CEM_PERC_CEM_COV

%

%

1,000

100 0

100

Mud Tail slurry Lead slurry Spacer

Mrayl

10

0

Minimum –1

Mrayl

9 0

Image Orientation, ° 0

90 180 270 360 0

Mrayl Average Mrayl

dB/m

200

Minimum 10 50

dB/m

155 0

Image Orientation, ° 10 0

90 180 270 360 0

dB/m

200

Average dB/m

200

Gas Solid Liquid

Mud

1.95

Maximum

Cement Evaluation Zones

The system’s capability to visualize and evaluate all of the available well data allows the WIEs to perform improved interpretations and determine why zonal isolation has or has not been achieved. Using the Invizion Evaluation service, holistic assessments have been performed on more than 100 casing strings worldwide.

3,000

Spacer

2,000

4,000

5,000

Lead

6,000

7,000

8,000

Tail

9,000

10,000

Figure 2. Alaska well presentation. Tracks 1 through 5 display well information and measurements obtained before cement placement. Tracks 6 through 9 present cementing execution information. Track 9 predicted that some mud contamination (red) could be expected in the lead cement slurry to a depth of 9,200 ft. However, no contamination was predicted across the

12

tail slurry below 9,150 ft (Track 9, dark gray). Tracks 10 through 14 show cement evaluation results. Acoustic and ultrasonic logs that were run 27 hrs after cement placement confirmed adequate cement coverage and zonal isolation across both the lead and tail portions of the cement sheath below 4,000 ft (Track 14, predominantly brown).

Oilfield Review

1

2

3

4

1

2

3

4

1

2

3

4

Casing Standoff

Cement Displacement Simulation

Acoustic Impedance Map

Acoustic Impedance

Casing Standoff

Cement Displacement Simulation

Acoustic Impedance Map

Acoustic Impedance

Casing Standoff

Cement Displacement Simulation

Acoustic Impedance Map

Acoustic Impedance

Minimum –1 At Centralizers 58

%

100

Depth, Between Centralizers ft 0 % 100

Mud Lead slurry Tail slurry Spacer

Mrayl

Minimum 9

–1

Average –1

Mrayl

9 –1

Image Orientation, ° 0

90

180 270 360 –1

Mrayl

At Centralizers 9

Maximum Mrayl

9

58

%

100

Depth, Between Centralizers ft 0 % 100

Mud Lead slurry Tail slurry Spacer

Mrayl

Minimum 9

–1

Average –1

Mrayl

9 –1

Image Orientation, ° 0

90

180 270 360 –1

Mrayl

At Centralizers 9

Maximum Mrayl

9

58

500

500

1,000

1,000

1,000

1,500

1,500

1,500

2,000

2,000

2,000

2,500

2,500

2,500

3,000

3,000

3,000

3,500

3,500

3,500

4,000

4,000

4,000

4,500

4,500

4,500

5,000

5,000

5,000

5,500

5,500

5,500

6,000

6,000

6,000

6,500

6,500

6,500

nation and for estimating whether the cement would cover the entire interval of interest (Figure 2).7 The results of the simulation indicated a risk of incomplete mud removal and also provided an estimate of the volume of cement contaminated by mud. In the laboratory, Schlumberger engineers prepared cement slurries whose compositions corresponded to the mud contamination estimate and cured the samples in an ultrasonic cement analyzer (UCA) at the well’s BHST. The tests indicated 6. A narrow fracture pressure window describes a condition in which the mud weight required to drill an interval without fluid influx is close to that which would cause the formation to fracture or fail. 7. For more on cement placement simulations: Piot B: “Primary Cement Job Design,” in Nelson EB and Guillot D (eds): Well Cementing 2nd ed. Houston: Schlumberger (2006): 435–458. Abbas R, Cunningham E, Munk T, Bjelland B, Chukwueke V, Ferri A, Garrison G, Hollies D, Labat C and Moussa O: “Solutions for Long-Term Zonal Isolation,” Oilfield Review 14, no. 3 (Autumn 2002): 16–29. 8. The unit of acoustic impedance is the rayl, normally given in Mrayl. One rayl = 1 kg/s/m2. 9. For a description of the Isolation Scanner tool operation: Bellabarba M, Bulte-Loyer H, Froelich B, Le Roy-Delage S, van Kuijk R, Zeroug S, Guillot D, Moroni N, Pastor S and Zanchi A: “Ensuring Zonal Isolation Beyond the Life of the Well,” Oilfield Review 20, no. 1 (Spring 2008): 18–31.

January 2016

100

Depth, Between Centralizers ft 0 % 100

500

Figure 3. Colorado well presentation. The first presentation (left) indicates numerous areas of poor casing standoff (Track 1, red). The cement displacement simulation predicted areas of poor mud displacement (Track 2, red). The acoustic impedance map also showed regions of poor cement coverage (Track 3, blue) up to the surface—which explained the presence of sustained casing pressure at the surface after cementing. The second presentation (center) shows the results obtained by improving the casing centralization. The simulator indicated good mud removal and cement

%

Mud Lead slurry Tail slurry Spacer

Mrayl

9

Average –1

Mrayl

9 –1

Image Orientation, ° 0

90

180 270 360 –1

Mrayl

9

Maximum Mrayl

9

displacement up to a depth of about 2,000 ft (Track 2, green). Although cement did not reach the surface, no gas or pressure was observed. The third presentation (right ) shows the results of improved rheological properties of the cement slurry in addition to improved centralization. The cement reached the surface and the acoustic impedance map shows competent bonding with no contiguous channels (Track 3). Sustained casing pressure was not observed using this design.

that, despite the contamination, the cement slurry would set within 10 hours; however, the acoustic impedance differential was only 0.3 Mrayl—too small to be detected by conventional logging tools.8 Three days of curing would be necessary for the cement to develop a sufficiently high acoustic impedance contrast to permit evaluation by conventional logging methods—confirming the operator’s previous experience. The WIEs recommended the use of the Isolation Scanner cement evaluation service because of its ability to acquire more sensitive acoustic impedance measurements.9 The tool combines the classic pulse-echo techniques of ultrasonic bond logging tools with a flexural imaging technique that provides more effective imaging of the annular fill, including reflection echoes at the cement-formation interface—the third interface echo (TIE). The TIE also allows engineers to determine whether material behind the casing is solid, liquid or gas. Correlating data from the UCA to the capabilities of the Isolation Scanner technology, the WIEs determined that logging could commence as early as 27 hours after cement placement. The cement execution data and laboratory data, combined

with the log information, illustrated the presence of good cement across all sections of the cement sheath. The operator has continued to employ this evaluation technique, lowering the WOC time and reducing completion costs. Solving Sustained Casing Pressure in Colorado The Niobrara play in the Denver-Julesburg basin is located in a highly populated region along the Front Range in Colorado, USA. This field produces approximately 250,000 bbl/d [39,700 m3/d] of oil from the Niobrara formation. One of the principal operators has more than 8,400 active wells in the region. Effective zonal isolation is of particular importance because some wells are located immediately adjacent to residential areas. Sustained casing pressure caused by gas migration through inadequate tail cement is a cause for concern and has been confirmed by cement bond log (CBL) and USI ultrasonic imager logs in certain cases. To mitigate gas migration, the operator elected to try the Invizion Evaluation service. The operator provided the WIEs with pertinent well data, which were loaded into the Techlog platform to produce a comprehensive presentation (Figure 3).

13

The analysis indicated that previous wells had poor casing centralization, resulting in poor mud removal that allowed channels to form in the cement sheath and serve as conduits for annular gas migration to the surface. Based on these findings, the operator increased the centralizer density by 50%, which led to better cement slurry displacement and mud removal. Sustained casing pressure was no longer observed. The investigation also included using the CemSTRESS cement sheath stress analysis software to estimate the radial and tangential stresses imposed on casing strings, cement sheaths and formations during the life of a well.10 The input parameters included Young’s modulus, Poisson’s

1

2

3

4

5

6

Wellbore Quality Lithology

Porosity

Resistivity

to improve cement sheath flexibility. In addition, the cement slurry contained an additive to cause slight cement sheath expansion after setting, thereby improving the bond. The operator has successfully applied the revised cementing strategy in wells in the region.

ratio and cement compressive strength. The software evaluates cement sheath performance in compression, tension or both; it can also identify both inner and outer microannuli and predict their size and development over time.11 In wells that experienced gas leakage, CemSTRESS analysis showed that the Young’s modulus of the formation surrounding the tail section of the cement sheath was too low to support the mechanical properties of the cement compositions that had been pumped. As a result, the cement sheath simulation indicated failure under traction, a possible explanation for the poor casing-cement bonding across that interval. Engineers altered the cement slurry composition

7

8

Mitigating Gas Migration in South Texas An operator producing from the Eagle Ford Shale in South Texas, encountered difficulties while cementing surface casing.12 The 10 3/4-in. surface casing was set inside 80 ft [24 m] of 16-in. conductor pipe. The casing string extended vertically from the surface through the conductor pipe and inside a 131/2-in. open hole to 4,525 ft [1,379 m].

9

10

Cement Design and Placement Caliper

3D Borehole

Well Geometry

Mud Contamination Risk

11

12

13

Flexural Attenuation Map

Solids, Liquids and Gas Map

Cement Evaluation

Cement Simulation Displacement

Cement Bond Log

Variable Density Log

Acoustic Impedance Map

90-in. Array 0.2

ohm.m

2,000

60-in. Array ohm.m

2,000

30-in. Array 0.2 Spontaneous Potential –240 Depth,

Zonation

60 60

Gamma Ray 0

gAPI

%

0 0.2

Bulk Density 150 60

%

2,000

Washout Undergauge

Standoff Between Centralizers

20-in. Array

Neutron Porosity

ohm.m

2,000 20

in.

0

0

2,000 0

in.

20

0

10-in. Array 0 0.2

ohm.m

%

100

Standoff at Centralizers %.

100

High Medium Low None

Mud Tail slurry Lead slurry Spacer

Mrayl Image Orientation, ° 0

mV

100

50

dB/m

155

Image Orientation, °

Gas Solid Liquid Image Orientation, °

45 135 225 315 45 45 135 225 315 45 45 135 225 315 45

Zone 3

1,000

Zone 4

Zone 5

ft

mV

ohm.m

–490.00 2.06 2.56 3.05 3.54 4.03 4.52 5.02 5.51 51.00

0.2

3,000

Zone 2

2,000

Zone 1

4,000

Figure 4. Overview of an Invizion Evaluation service for an Eagle Ford well. Engineers divided the Invizion Evaluation presentation into five zones (left). Key observations included that, although cement slurry had reached the

14

surface during displacement, losses occurred thereafter and the top-of-solids depth was 240 ft (Track 13). Liquid channels existed between 240 and 550 ft. Washouts occurred between 500 and 1,200 ft (Track 4).

Oilfield Review

1

2

3

4

5

6

Wellbore Quality Lithology

Porosity

Resistivity

7

8

9

10

Cement Design and Placement Caliper

3D Borehole

Well Geometry

Mud Contamination Risk

11

12

13

Flexural Attenuation Map

Solids, Liquids and Gas Map

Cement Evaluation

Cement Simulation Displacement

Cement Bond Log

Variable Density Log

Acoustic Impedance Map

90-in. Array 0.2

ohm.m

2,000

60-in. Array ohm.m

2,000

30-in. Array 0.2 Spontaneous Potential –240 Depth,

Zonation

mV Gamma Ray

0

ft

60 60

gAPI

0 0.2

Bulk Density 150 60

%

2,000

Washout Undergauge

Standoff Between Centralizers

20-in. Array

Neutron Porosity %

ohm.m ohm.m

2,000 20

in.

0

0

2,000 0

in.

20

0

10-in. Array 0 0.2

ohm.m

%

100

Standoff at Centralizers %.

100

–490.00 2.06 2.56 3.05 3.54 4.03 4.52 5.02 5.51 51.00

0.2

High Medium Low None

Mud Tail slurry Lead slurry Spacer

Mrayl Image Orientation, ° 0

mV

100

50

dB/m

155

Image Orientation, °

Gas Solid Liquid Image Orientation, °

45 135 225 315 45 45 135 225 315 45 45 135 225 315 45

600

700

900

Zone 4

800

1,000

1,100

1,200

Figure 5. Invizion Evaluation service interpretation of Zone 4 of an Eagle Ford well. Zone 4 extends from 560 to 1,250 ft. The interpretation results indicate well-bonded casing (Track 3, brown) and some apparent liquid patches (blue), which are also predicted by the cement placement simulation (Track 8). The gamma ray curve (Track 1) shows an average value of less

The operator faced three principal cementing risks: lost circulation, hole washouts and gas migration from shallow flow zones between 250 and 600 ft [76 and 183 m] measured depth. An offset well on the same pad developed gas migration outside the casing and required remedial cement squeezes and a casing patch to fix the problem. The casing patch reduced the inner diameter of the casing to an extent that interfered with further well development plans. The operator sought advice from Schlumberger to propose measures to improve cementing results in future wells. Updated cementing practices were employed to prevent gas migration along the surface casing string. Both the lead and tail cement slurry incorporated a gas migration control additive. The tail slurry was also designed to set quickly to further minimize the likelihood of gas migration. The centralizer program was designed to provide maximum standoff across the shallow gas zones—engineers installed one centralizer per

January 2016

than 70 gAPI. The resistivity data (Track 3) do not indicate mud invasion except at approximately 650 to 750 ft. Caliper values (Track 4) averaged 16.5 in. [42 cm], indicating washout sections. Casing standoff (Track 6) averaged about 60%. The interpretation results indicate bonded solids around the casing and some liquid patches (Track 13).

casing joint to 1,000 ft [305 m]. Then, at lower depths, where the well was still vertical, every fourth casing joint was fitted with a centralizer. To further minimize the risk of gas migration, the operator elected to install an external casing packer (ECP) within the casing-conductor pipe annulus. The cementing operation successfully stopped gas migration; however, after the cement slurry reached the surface, lost circulation difficulties were encountered, and the TOC fell back into the well before the top plug reached the bottom of the casing string. The WIEs performed the Invizion Evaluation service to investigate these problems as well as verify annular zonal isolation. The overall presentation indicated that the TOC was at 240 ft [73 m]. Washouts and liquid channels in the cement slurry were also observed. To more thoroughly examine the data, the WIEs divided the well into five analysis zones (Figure 4). In Zone 1, extending from TD to 4,060 ft [1,237 m], good cement bonding was present

despite about 10% mud contamination. In Zone 2, between 4,060 and 2,006 ft [611 m], evidence of mud invasion and lost circulation was apparent; nevertheless, the interpretation indicated good bonding within the interval. A discrepancy between the predicted and measured location of the interface between the tail slurry and lead slurry provided evidence that the lead and tail slurries were mixed during displacement. In Zone 3, between 2,006 and 1,250 ft [611 and 381 m], mud pockets were observed. Log interpretation indicated bonded solids around the casing and the development of liquid channels. Similar results were seen in Zone 4 between 1,250 and 560 ft [381 and 171 m] (Figure 5). Zone 5 extended from 560 ft to the 10. Bellabarba et al, reference 9. 11. A microannulus is a small gap that can form between the casing and the cement sheath or between the cement sheath and the formation. 12. Surface casing usually consists of a large-diameter pipe string to protect freshwater aquifers and provide structural strength for additional casing strings, including the final production casing string.

15

1

2

3

4

5

6

Wellbore Quality Lithology

Porosity

7

8

9

10

Cement Design and Placement

Resistivity

Caliper

3D Borehole

Well Geometry

Mud Contamination Risk

11

12

13

Flexural Attenuation Map

Solids, Liquids and Gas Map

Cement Evaluation

Cement Simulation Displacement

Cement Bond Log

Variable Density Log

Acoustic Impedance Map

90-in. Array 0.2

ohm.m

2,000

60-in. Array ohm.m

2,000

30-in. Array 0.2

Spontaneous Potential –240 Depth,

Zonation

60 60

gAPI

%

0 0.2

Bulk Density 150 60

%

2,000

Washout Undergauge

Standoff Between Centralizers

20-in. Array

Neutron Porosity

Gamma Ray 0

ft

mV

ohm.m ohm.m

2,000 20

in.

0

0

2,000 0

in.

20

0

10-in. Array 0 0.2

ohm.m

%

100

Standoff at Centralizers %.

100

–490.00 2.06 2.56 3.05 3.54 4.03 4.52 5.02 5.51 51.00

0.2 Crossover

High Medium Low None

Mud Tail slurry Lead slurry Spacer

Mrayl Image Orientation, ° 0

mV

100

50

dB/m

155

Image Orientation, °

Gas Solid Liquid Image Orientation, °

45 135 225 315 45 45 135 225 315 45 45 135 225 315 45

100

300

Zone 5

200

400

500

Depth, ft

average standoff. Dynamic cementing pressures remained below the formation fracture pressure. The cement evaluation log shows the cement top at 240 ft. In the processed solids, liquids and gas (SLG) map (Track 13), liquid channels occur from the top of solids to 560 ft in the wide side of the annulus. The tortuosity of the liquid channels suggests that the channels were formed after the cement was placed. An external casing packer is also evident at 75 ft. An offset well required remedial cement squeezes between 500 and 800 ft. No gas was observed in this region of the well.

Mrayl

7.500

6.500

5.500

4.500

3 Variable Density Log

3.500

2 Bond Index

2.500

1 Acoustic Impedance Map 1.500

0.500

0.000

Figure 6. Invizion Evaluation service interpretation of an Eagle Ford well, Zone 5. Zone 5 extends from the surface to 560 ft. The interpretation results indicate the top of solids were at 240 ft (Tracks 11 through 13) and the presence of a postcementing liquid channel (Track 13, blue). The gamma ray values vary from 33 to 70 gAPI between 250 and 275 ft (Track 1). Some mud invasion occurred at approximately 500 ft, where the washout area was located. The average neutron porosity is 45%, and the density porosity is 30%. Most of the zone contained washout areas based on the caliper log (Track 4). One centralizer was installed per joint, resulting in a 65%

Bond Index Level for Zonal Isolation 100 % 0 Minimum Bond Index from Discriminated Attenuation 100

%

Amplitude

Maximum

0

18,700

19,100

Figure 7. Deepwater Gulf of Mexico exploration well log. Engineers relied mainly on the bond index (BI) data (Track 2) to estimate the TOC. The BI falls significantly at 18,640 ft (red line), and engineers chose that depth as the TOC. This finding is not as evident in the acoustic impedance map (Track 1) or the variable density log (Track 3).

16

surface, and liquid channels were observed in the cement sheath (Figure 6). The presence of the inflated ECP was evident at 75 ft [23 m]. The tortuosity of the channels and their position on the wide side of the annulus suggested fluid flow into the annulus after cement slurry placement. The overall analysis indicated that, despite the operational problems, the cementing operation achieved adequate zonal isolation. A possible explanation for the losses and lowered TOC is that during displacement, the pumping pressure may have initiated ECP inflation, thereby reducing the effective annular size inside the conductor pipe. The resulting pumping pressure increase at shallow depths may have caused formation breakdown. Furthermore, the formation of channels was a possible result of inadequate casing centralization below 1,000 ft [305 m]. Therefore, the recommendation for future offset wells is to eliminate the ECP from the well design and to install a centralizer on each casing joint. 13. Bellabarba et al, reference 9.

Oilfield Review

1

2

3

4

5

Deep Resistivity

Lithology

Well Geometry

Wellbore Quality Gamma Ray

Drilling Parameters

Inclination 0 Average Rate of Penetration 0 Depth, ft

Gamma Ray 0

gAPI

ft/hr

50

Inclusions

Mud Weight In 50 0

ppg

degree

20

Azimuth 0

50 0.2

ohm.m

20,000

Salt

degree

360

Dogleg Severity

Inclusions 0

degree/100 ft

5

16,000

17,000

18,000

19,000

Figure 8. Openhole LWD measurements from a Gulf of Mexico exploration well. Spikes on the gamma ray log (Track 1) indicate three zones in which the salt contains inclusions of other minerals. The contamination is further confirmed by the resistivity (Track 3) and lithology (Track 4) data. The resistivity increases across the contaminated zones, and the lithology

Well Planning in the Deepwater Gulf of Mexico An operator developing a deepwater prospect in the Mississippi Canyon in the Gulf of Mexico encountered difficulties while completing an exploration well drilled in about 4,059 ft [1,237 m] of water. Previously, the operator drilled to a depth exceeding 20,000 ft [6,100 m] and cemented a 14-in. casing string inside a 16-in. liner. The length of the overlap between the casing string and the liner was 8,940 ft [2,725 m], and the annular clearance within the liner lap was 0.425 in. [1.08 cm]. The casing string was designed to isolate a zone composed entirely of salt. Fluid losses during drilling and cementing indicated the presence of lost circulation zones.

January 2016

presentation shows inclusions of foreign material (blue and tan) within the salt (magenta). The three zones were identified as potential lost circulation sites. Drilling dynamics (Track 2) and well geometry data (Track 5) are also presented.

After the cementing operation, a logging run was performed to locate the TOC (Figure 7). Relying mainly on CBL attenuation data and a computed bond index (BI), the logging engineers estimated the TOC was located at 18,640 ft [5,680 m]—3,960 ft [1,210 m] lower than expected—which meant that the upper portion of the salt zone was uncemented. The operator, who plans to drill a similar offset well in the future, approached Schlumberger to provide an Invizion Evaluation service on the exploratory well and help formulate strategies to prevent difficulties that might impede successful zonal isolation in the offset well. The operator provided archival data from the earlier well. This

information—including openhole logging-whiledrilling (LWD) data; compositions and physical properties of the drilling fluid, spacer fluid and cement slurries; and analyses of well fluids that returned to the surface—was integrated into the Invizion Evaluation presentation. Engineers also discovered that, during the previous logging run, significantly more data were actually acquired but never examined. The additional data included flexural attenuation (FA), TIE and a solids, liquids and gas (SLG) map.13 The openhole data revealed the presence of three intervals along the salt zone that were contaminated by other minerals (Figure 8). Engineers had previously assumed that the salt

17

Casing Standoff

Displacement Simulation

Mud Contamination Risk

At Centralizers 0 Depth, ft

%

100

Between Centralizers 0

%

100

Mud Tail Slurry Lead Slurry Spacer

High Medium Low None

16,000

17,000

18,000

19,000

Figure 9. Cement placement simulations for an exploratory well in the Gulf of Mexico. Centralizers were installed only in the lower part of the casing string. Above about 19,300 ft [5,880 m], the casing standoff was poor (Track 1). The displacement simulations (Track 2) predicted that full cement coverage (gray) rose to a depth of about 18,700 ft [5,700 m]. Above, the annulus contained drilling fluid (brown). The mud contamination risk simulation concurred. Mud contamination (Track 3, red) began as the casing standoff decreased. Full cement coverage (Track 3, green) was predicted in the centralized region.

18

zone was continuous. The contaminated intervals were identified as possible sites where lost circulation took place, and their presence helped explain why the TOC was below the intended depth. Equipped with the mud, spacer and cement slurry property data as well as pressure charts acquired during the cementing operation, the WIEs performed fluid placement simulations. The first simulations confirmed that the pressure charts were consistent with the occurrence of lost circulation when the float valves were converted on the casing prior to cement job execution.14 In addition, engineers noted that the fluid displacement pressure exceeded the fracture pressure in the interval. The elevated pressure likely resulted from the constricted annular clearance between the liner and the casing string. The second set of simulations examined the capability of the spacer fluid and cement slurry to displace the drilling fluid (Figure 9). Engineers noted that centralizers had been installed only at the bottom of the casing string. Above the centralizers, the casing standoff was poor, and the simulations indicated poor mud removal and a sizeable channel above about 18,700 ft [5,700 m]—a depth consistent with what had been concluded to be the top of cement in the earlier interpretation. Integration of the additional logging data with the previous findings was revelatory (Figure 10). The acoustic impedance map, coupled with the FA and SLG maps, showed the TOC to be much higher than previously thought—at about 16,000 ft [4,880 m]. Unfortunately, this depth was still below that required to cover the entire salt interval. Furthermore, WIEs confirmed that the cement sheath quality was good in the centralized portions of the annulus around the casing shoe, and the cement slurry that rose to 16,000 ft had a clear placement channel consistent with computer simulations performed after the job execution. The new information resulting from the Invizion Evaluation service allowed the operator to adjust the completion plan for the future. The operator’s engineers formulated a plan to improve centralization of tubulars in regions 14. Float equipment, installed near the bottom of a casing string, comprises valves that allow drilling fluid to enter the casing interior as the string is lowered into the well. As a result, the casing is filled with drilling fluid before the cement slurry is pumped. Before the cement job commences, a ball or other activation device is pumped into the casing. When the ball reaches the float equipment, the valves are converted such that they permit only one-way flow out of the casing and into the annulus, thereby preventing reverse circulation, or U-tubing, of the cement slurry.

Oilfield Review

Depth, ft

1

2

3

4

5

Cement Bond Log

Variable Density Log

Acoustic Impedance

Acoustic Impedance Map

Flexural Attenuation

Values Greater than Free Pipe

Attenuation 0

dB/ft

5

0

Mrayl

0

Mrayl

7

Values Greater than Baseline

Impedance 10

6

Flexural Attenuation Map Solids, Liquids and Gas Map

8

20

dB/m

70

20

dB/m

100

Gas Solid Liquid

16,000

17,000

18,000

19,000

Figure 10. Complete log information retrieved from an exploratory well in the Gulf of Mexico. Examination of the acoustic impedance map (Track 4), the flexural attenuation map (Track 5) and the solids, liquids and gas map

above the casing shoe. To reduce friction pressure during pumping and minimize lost circulation, the operator decided to eliminate the 14-in. casing string and extend the 16-in. liner through the salt zone. Care will also be taken to ensure that fluid placement pressures remain below formation fracture pressures, further reducing the probability of lost circulation while allowing the cement slurry to reach the intended depth. Expanding the Scope of Holistic Cement Sheath Evaluations Engineers and wellsite personnel have only one chance to achieve a successful primary cement job for each casing string. Remedial cementing to solve problems associated with a faulty

January 2016

(Track 7) reveals a sharp interface between a contaminated cement sheath below about 16,000 ft and spacer fluid at shallower depths.

cement sheath has a less than stellar success rate and may even reduce a well’s productivity. Improved understanding of primary cementing operations can be gained by examining well histories while performing comprehensive interpretations of log data. Indeed, the added insight provided by the Invizion Evaluation service can further enhance the value of integrating all available information and allowing operators to make better informed decisions concerning drilling and cementing practices. To date, the Invizion Evaluation service has been aimed at examining current cementing practices and the objective is to improve them and troubleshoot less than optimal outcomes. The longer-term value of the service will be enhanced

as engineers and operators become more proactive during the well cementing process, making real-time cementing decisions that make use of all borehole measurements and data obtained during drilling. For example, the information may be entered into the Techlog platform as it is acquired, facilitating close collaboration among personnel involved in the drilling and cementing process. Ultimately, engineers may apply the Invizion Evaluation service at the planning stage, allowing geologists and geophysicists to collaborate with the drilling and cementing engineers to further ensure primary cementing success. —EBN