Chapter 8 ANTI-TERMITE TREATMENT

Jan 23, 2017 ... S.No. Sch. Item No. Description of item. P.W.D.. Unit. Labour. Over All. PWD. NBO . Spec. No. Rate. Rate. 1. Providing and injecting ...

22 downloads 577 Views 48KB Size
Chapter 8 ANTI-TERMITE TREATMENT S.No. Sch. Item No. PWD NBO 1

Description of item

P.W.D. Spec. No.

Unit

Labour Rate

Over All Rate

Providing and injecting chemical emulsion for Preconstructional antitermite treatment and creating a chemical barrier under and alround the column pitswall trenches basement excavation top surface if plinth filling junction of wall and floor along the external perimer of binding expansion joints,surroundings of pipes and conduit etc. complete(Plinth area of the building at ground floor only shall be measuredas per I.S. 6313 (Part II 1981) Aldrine emulsifiable concentrate or any other approved material such as Hepthachlor or chlordance will be used. The rateof applications of chemical emulsion shall be as Follows :(1) Treatment for Masonary & foundatiion 5 Liters per Sq.m. (2) Back fill in immediate contract with foundation 7.5 Litres per Sq.M. (3) Treatment of Top surface of plinth filling 5 Litres per Sq.M. (4) Treatment of soil along External Perimerter of Building 7.50 Litres per Sq.M.

2

(5) Treatment of soil under Apron Along extrnal Perimeter 5 litres per sq.M Providing and injecting for Post constructional antitermite treatment.

D:\Office Work\Website\upload\SOR\Azamgarh Circle SOR.xlsChapter8 Anti Termite

Sq.M Sq.M

132.00 111.00

D:\Office Work\Website\upload\SOR\Azamgarh Circle SOR.xlsChapter8 Anti Termite