Comparison of VRF System and - Pronove Tai

VRF Systems. Chiller Systems. Economical efficiency. Initial cost (equipment + installation). ○. ○. Running cost. ◎. ○. Facility space. ◎. △. Air cond...

49 downloads 770 Views 5MB Size
Comparison of VRF system and

Chiller system

1

1. Outline VRF systems (Variable Refrigerant Flow) Outline & Feature

1. Individual room control is possible 2. Partial load operation is possible 3. No need to transport of Air or Water (refrigerant gas only) 4. Facility space is small 5. High COP & Energy saving 6. Advanced Control System Application

•  •  •  • 

Office Hotel, Condominium Hospital School (University) -for Individual room control building

2

- All inverter compressor can be back-up inverter operation continues.

- To maximize life span, starting order of compressors are switched.

Competitor D Back-up operation = ON / OFF control only

compressor failed

inverter

KX4

Fixed speed

Back-up operation = inverter control

compressor failed

inverter

3

KX4 is quiet… noise level 68

66

64

62

60

Much quieter with “Silent Mode”

58

MHI(KX4) A B

56

B' C

54 22.4

28

33.5

40

45

50.4

56

61.5

68

73.5

80

85

90

96

101

107

113

118

124

130

136

4

Indoor Units KX4 offers a wide range of indoor units (14 types/77models)

No.of No.of I/D I/D types models

MHI

14

77

Competitor D

11

65

Ceiling cassette 4-way FDTA

4-way (compact)

FDTCA

2-way

1-way

FDTWA

FDTSA

Ducted 1-way

middle static high static middle static pressure pressure pressure (compact)

FDTQA

FDUMA

FDUA

FDURA

Floor standing

compact

Wall mouted

Ceiling suspended

exposed

hidden

Fresh air heat

FDQMA

FDKA

FDEA

FDFLA

FDFUA

SAF

** A dry contact is equipped on both indoor (CNT connector) and outdoor units (CNS connector) which can be connected to the fire alarm system

5

Control Systems (with SUPERLINK) KX4 offers wide variation, provides best solution. <KX4 Control systems with SUPER LINK>

Classification

Type

Model

Connectable Electric I/D units power (Maximum) calculation

Individual controller

Wired

RC-E1R

1



Wireless

RCN-TC-W-ER etc.

1



SC-SLA1-ER

16



SC-SLA2A-ER

48



SC-SLA3-ER

144



SC-SLB3-ER

144



SC-WGW-AR

96



SC-WGW-BR

96



BACnet

SC-BGW-AR

96



LONworks

SC-LGW-AR

96



Centralised controller

Touch screen

Inter face unit

WEB(PC windows) gateway

BMS gateway

6

Chiller systems Outline & Feature

System

1. Individual room control is difficult 2. Partial load operation not possible (To use even one FC unit, central chiller operation is necessarily) 3. Need to transport of Air or Water 4. Facility space is large 5. Operation for one big room is efficient

Application

・ Factory ・ Gymnasium ・ Office, Restaurant -for large room and space

7

Comparison

better ○: sufficient △: can be improved ◎:

Evaluated item Economical efficiency

Air conditioning grade

Flexibility

Safety, maintenance

Workability and others

VRF Systems

Chiller Systems

Initial cost (equipment + installation)





Running cost





Facility space





Zoning





Temperature/humidity control





Applicability for partial load





Individual operation and control





Distress in the event of trouble





Ease of individual measurement





Safety against hazard





Maintainability





Ease of installation





Installation term reduction





8

VRF VS CHILLER COMPARISON

9

10

11

5

3. Others

Heat source equipment [291] (16.0)

-Typical Office Building Elevator etc., Sanitation & Others [373] (20.5) Energy consumption of building [1817] (100) Lighting [586](32.3)

Heat source [364] (20.0) Heat source auxiliary equipment [73] (4.0) Exhaust fan [198] (10.9) Medium transportation for air-conditioning [494] (27.2)

Air-conditioning fan [173] (9.5)

Air-conditioning [858](47.2)

Pump for air-conditioning [123] (6.8)

[ ] : Yearly energy consumption per square [MJ/m2・yr], ( ) : Percentage makeup against total energy consumption (%) 12

Functions of Required for the Air Conditioning System the Building from now on

Flexibility ・ Change of partition ・ Change of layout ・ Variation of heat generated by OA equipment Maintainability and controllability ・ Easy maintainability of equipment ・ Easy Operation method

Comfort ・ Thermal comfort differs for each individual human beings ・ Various work time bands

Requirements for air conditioning in the building from now on

of

Energy saving ・ Heat recovery ・ Reduction of transportation power ・ Start/stop control of Individual unit Safety and reliability ・ Protection against earthquake, fire and water leakage 13

The trend of Air-conditioner for sophisticated buildings

the shift is to

VRF system!! 14