e-CLAIMS STATUS DESCRIPTIONS (C) Claim status applies to C

1 | Pag e e-CLAIMS STATUS DESCRIPTIONS Last Updated: March 28, 2017 . KEY: (M) Claim status applies to Manville Trust Claims only (C) Claim status app...

13 downloads 718 Views 67KB Size
e-CLAIMS STATUS DESCRIPTIONS Last Updated: March 28, 2017

KEY: (M) (C) (U) (N) (AT)

Claim status applies to Manville Trust Claims only Claim status applies to C.E. Thurston & Sons Asbestos Trust Claims Only Claim status applies to United States Mineral Products Company Only Claim status applies to NARCO Asbestos Trust Only Claim status applies to Manville, C.E. Thurston & Sons, US Mineral & NARCO Asbestos Trust claims

Status Code ADDDEMOGRAPHIC

ADR ALT AWADRAPPEAL AWCDT AWCHECKDENIAL

AWDATA AWDATA_F AWDEMOGRAPHIC

AWDENIALRESP

AWDOCREVIEW

AWDOCREVIEW_F

AWEHHSREVIEW

AWEHHSREVIEW_F

Status Claim Requires Additional Demographics. (N) ADR(AT) Alternate Review (U) Awaiting Appeal (C)

Description Demographic Data Entry not yet complete.

Claimant has elected Arbitration. Alternate Review has been requested. The non-binding decision by the Arbitrator has been appealed Awaiting CDT Execution Demographic Data Entry is complete. CDT (AT) yet to be run. Awaiting Check/Denial Claim is ready to be paid in the next Generation (AT) payment group or for a deficiency notice to be sent. Awaiting Data (C) Awaiting the submission of a CET product other than to be provided for a claim. Awaiting Data (C) Awaiting the submission of a CET product other than to be provided for a filing. Awaiting Demographic Assigned to CRA or law firm for Data Entry Data Entry (AT) (DE), Demographic Data Entry not yet complete. Awaiting Denial Response Denial letter (or electronic notification via (AT) the message board) has been generated and sent to law firm or pro-se. Awaiting Document Documents required for the claim have been Review (N) received and are awaiting review by CRMC. Awaiting Document Documents required for the filing have been Review (N) received and are awaiting review by CRMC. Awaiting Exigent Claimant has elected EH or HS review on Health/Hardship Review their claim form and is undergoing that (N) review. Awaiting Exigent Claimant has elected EH or HS review on Health/Hardship Review their claim form and is undergoing that (N) review. 1|P age

AWEXPDOCREQUEST Status Code AWEXPDOCSUBMISSION AWEXPREVIEW AWEXPREVSUBMISSION AWHOLDRES

AWIRDATA AWIRDOCREVIEW AWLITIGATION AWOFFERFUNDING AWOFFERRESP AWPELREVIEW

AWPEUREVIEW

AWPEUREVIEW_F

AWPREPETREVIEW AWPROBATE AWPROBATEDOC

Awaiting Exposure Document Request (C) Status Awaiting Exposure Document Submission (C) Awaiting Exposure Review (N) Awaiting Exposure Review Submission (N) Awaiting Hold Resolution (AT)

Awaiting IR Data Entry (N) Awaiting IR Document Review (N) Awaiting Litigation (C) Awaiting Offer Funding (AT) Awaiting Offer Response (AT) Awaiting Pre-established Liquidated (PEL) Claim Review (N) Awaiting Pre-established Unliquidated (PEU) Claims Review (N) Awaiting Pre-established Unliquidated (PEU) Claim Review by Honeywell. (N) Awaiting Prepetition Paid Claims Review (U) Awaiting Probate (N)

AWRCT

Awaiting the submission of proof that probate is unresolved (N) Awaiting facility review of probate documentation. (N) Awaiting Re-cat (AT)

AWRCTEXPREVIEW

Awaiting Re-cat Exposure

AWPROBATEDOCREVIEW

Letter is queued for printing and sending requesting exposure site documentation. Description A claim has been filed but site information has not yet been provided. Claim is awaiting exposure review by CRMC. Claim is awaiting the submission of an exposure review by CRMC. A hold has been placed on a claim that must be resolved before additional processing can take place. Only CRMC users may add or remove a hold. Awaiting completion of the IR claim form. The claim is awaiting the review of a document for a claim where IR was elected. Claimant has stated they will be pursuing litigation. Claim has been submitted but the Trust does not have necessary funds to extend an offer. E-offer, check, or release has been generated and sent to law firm or pro-se. A potential PEL claim has been submitted and is awaiting review by Honeywell. A potential PEU claim has been submitted and is awaiting review by Honeywell. A potential PEU claim has been submitted and is awaiting review by Honeywell.

A match has been found on name. ARPC will contact the firm to resolve. Claim awaiting expiration of probate hold removal. Evidence is required to establish a longer offer expiration period. CRMC is in the process of reviewing documentation in support of unresolved probate. Re-categorization has been requested, awaiting a new medical review by CRMC. Re-categorization has been requested, 2|P age

Status Code AWRCTEXPREVSUBMISSION AWRCTSUBMISSION AWRELEASEOFFGEN AWRELEASERESP

AWREVALSUBMISSION AWSOLDOCREVIEW

AWSOLREVIEW

Review (N) Status Awaiting Re-cat Exposure Review (N) Awaiting Re-cat submission (AT) Awaiting Release Offer Generation (AT) Awaiting Release Response (AT) Awaiting Re-Evaluation Submission (U) Documents Under Review (N)

DEACTIVATED

Awaiting SOL Review (U)(N) Awaiting Submission (AT) Deferred by Law Firm (AT) Deactivated (M)(U)

DEFERRED

Deferred (N)(C)

DELETED

Deleted (AT)

DELETEDPEL

Pre-established claim denied by Honeywell (N)

DELETEDPPT

Prepetition paid claim. (No SIC allowed) (U) Claim Election Clarification (N) Expecting Document Submission (AT)

AWSUBMISSION CLAIMDEFERRED

ELECTIONCLARIFICATION EXPECTINGDOCS

EXPECTINGDOCSCLM

Expecting Docs (N)

Status Code FIRMRESPONSE

Status Honeywell requires information to settle the claim (N) Individual Evaluation (M)

IE

awaiting a new exposure review by CRMC. Description Re-categorization has been requested, awaiting a new exposure review by CRMC. Re-categorization (CDT or rely on MV) has been run and saved but not yet submitted. Pending release generation. Law firm generated the electronic release from e-Claims and CRMC is waiting for the signed release to be returned. Rely on Manville claim waiting to be submitted. CRMC reviewing documents in connection with Supplemental Notice of NARCO Asbestos Trust Filing Deadlines. The claim needs to be reviewed for Statute of Limitations. CDT has been run and saved but not yet submitted. The law firm has requested claim deferral. Law Firm/Claimant did not respond to offer or denial within the specified timeframe. CRMC has completed its review of the claim and is awaiting review by the Trust. Filing has been deleted. Honeywell has completed their review of the PEL claim and determined it cannot be processed. The result of the prepetition review was that a claim could not be filed. A clarification regarding the claim election is required from the filing party. Law firm has entered the demographic information and CRMC awaits the documents so the CDT can be run. Law firm has entered the demographic information and CRMC awaits the documents so the review process can continue. Description The firm has been notified that they need to contact MWE to discuss their preestablished claim. Claim awaiting IE. 3|P age

IR IREXPECTINGDOCS OFFERSUSPENSION OHDOCREVIEW

OHEXPECTINGDOCS

PENDINGPAYMENT

Individual Review (N) Awaiting IR Documentation (N) Offer Suspension (AT) Awaiting Review of Ohio Bureau of Workers Compensation Document (N) Expecting Document from Subrogation Unit at Ohio Bureau of Workers Compensation (N) Pending Payment (AT)

PENDINGPREINSTR

Pending execution of PreEstablished Unliquidated Claims Review (N)

PRERCT

Pre Re-cat (AT)

PREREVAL

Pre Re-Evaluation (U)

QCEXTESTING

QC Exposure Testing (N)

QCRCTEXTESTING

QC Exposure Testing (N)

QCTESTING

QC Testing (AT)

RCTEXPECTINGDOCS

Re-cat Expecting Document Submission (AT) Review claim for subrogation (N)

REVIEWSUBROGATION

Status Code STTLAWPAYMENT

Status Awaiting Payment (AT)

Claim awaiting IR. Claim is awaiting receipt of documentation required for Individual Review. Offer withheld due to law firm suspension. A document has been received and is in the review process.

Awaiting submission of document satisfying the Trust that the state has no lien on the claim. Law firm or pro-se has accepted e-offer or submitted a release. Claim has yet to be paid. This status applies to both PEL and PEU claims. CRMC is waiting for instructions from Honeywell as to how to process the claim. Law firm or claimant has selected recategorization System is waiting for the law firm or CRMC (for a paper or pro-se filer) to select the “to CRMC for processing” option on the claim page. H-Filer has selected rely on MV. System is waiting for the law firm to select the “to CRMC for processing” option on the claim page. Law firm has submitted the necessary documents and the claim is ready or in the process of exposure QC Testing. Law firm has submitted the necessary documents and the claim is ready or in the process of exposure QC Testing. Law firm has submitted the necessary documents and the claim is ready or in the process of QC Testing. H-Filer has changed claim data so documents are required before the CDT can be run. Claim matches to one of the names on the list received from the Rawlings Law Firm on behalf of several health insurance carriers. Description Offer has been accepted, claim is in the 4|P age

STTLDPD

Settled Paid (AT)

TRSTREV

Trust Review (N)

TRSTREV_F

Trust Review (N)

WITHDRAWN

Withdrawn (AT)

period during which law firm can ‘cancel’ the acceptance. Check or EFT has been issued (h-filers), or check cashed (paper filers, pro-se). The claim is awaiting review by the Trustees. The claim is awaiting review by the Trustees. Claim has been withdrawn.

5|P age