IEC 61439-2 & IEC 60439-1 Low Voltage Switchgear and Controlgear Assemblies Presented by Ir Aaron Leong 26 November 2014, Manila INSTITUTE OF INTEGRAT...
CHM101 TA101 MTH203 HSS-I-2 CS330 CS335 PHY101 PHY103 CHM201 TA201 CS340 CS345 PHY102 MTH102 CS220 CS201 ... B.Tech. (Electrical Engineering) S E M E S T E R
4.2. Plant Engineering is a "closed book" examination. It will consist of both mechanical and electrical questions, with a limited choice of questions. The time allowed for the examination will be 3 hours. Candidates may not use programmable calculat
S.No.EXAM CENTRE CENTRE ADDRESS/ EXAM VENUE Date :27/05/2013 Time :14:53.28 REGION : All Addresses Of Examination Centres (For Publication in Student Bulletins
3 CMA Target Success THE INSTITUTE OF COST ACCOUNTANTS OF INDIA- Academics Department (B oard of Studies) Send your Feedback to : [email protected] W ebsite : http://www
1 the institute of chartered accountants of nigeria professional examination ii public sector accounting and finance section a (attempt all questions)
THE INSTITUTE OF CHARTERED ACCOUNTANTS OF NIGERIA ( Established by Act of Parliament No. 15 of 1965 ) The Institute is a global professional accountancy organisation
SKILLS LEVEL EXAMINATION – NOVEMBER 2015 1 THE INSTITUTE OF CHARTERED ACCOUNTANTS OF NIGERIA NOVEMBER 2015 SKILLS EXAMINATION Question Papers Suggested Solutions
The American Society of Mechanical Engineers (ASME) 2015 GO.ASME.ORG /BPVC15. SETTING THE ... Seccion I – Reglas para la
THE HONG KONG INSTITUTION OF ENGINEERS 香港工程師學會 2/11/2016 M14343 Professional Qualifications for Corporate Membership
refer to the generally recognized periods of the Assyrian dialect, OB, MB, and NB to those of the Babylonian; OAkk. ..... E. Unger, Babylon, die heilige. Stadt ... xii
DIRECT DOWNLOAD! National electrical code of the philippines pdf ... national electrical code of the philippines 2012 pdf 2, ... Philippine Electrical Code,
The integrated approach of Urban Sustainable Development through the implementation of Horizon/Europe2020 Reggio Calabria, May 6-8th 2014 PROGRAM
Download Abstract. Human communication is a critical issue in personal life. It also should be the indispensable core element of general education curriculum in universities and colleges. Based on literature analysis and the author's clinical
1 . Closing the loops – Integrated application of environmental management tools throughout the project cycle: lessons learned from a regional shopping mall
Download Abstract. Human communication is a critical issue in personal life. It also should be the indispensable core element of general education curriculum in universities and colleges. Based on literature analysis and the author's clinical
everything semitic, but most of us knew little of how he spends his free time and what are his hobbies and non- linguistic interests. ...... 'show us, we pray you, the entrance into the city, and we will deal kindly with you' = “if you show us ......
King History L. W. King, A History of Babylon. King Hittite ... Ammi-Saduqa von Babylon (=. Studia et .... Petschow MB H. Petschow, Mittelbabylonische. Rechts-
Aquarius”, meaning its just about to rise in Aquarius and will keep doing so for about another 2000 years, until it moves completely through that constellation unto the
Icagh Study Text.pdf Free Download Here THE INSTITUTE OF CHARTERED ACCOUNTANTS (GHANA) http://www.icagh.com/file/Syllabus.pdf LIST OF RECOMMENDED TEXT 1
G V P College of Engineering (Autonomous) 2013 UTILIZATION OF ELECTRICAL ENERGY Course Code:13EE1135 L T P C 4003 Pre requisites: Basic knowledge in physics
4 PREFACE The curriculum of subject is described as a throbbing pulse of a nation. By viewing curriculum one can judge the stage of development and its pace of
The Fundamentals of Agile, page 1 www.sei.cmu.edu/podcasts ... applied research, product-and-training development, education-and-training delivery, and
ered an institution of social service. Some theorists venerate the State as the apotheosis of society; oth- ers regard it as an amiable, though often inefficient, organization for achieving social ends; but almost all regard it as a necessary means f
The Institute of Bankers, Bangladesh Bangladesh Bank Banking Diploma Examination : December 2015 JAIBB List of Successful Candidates 1 Roll No. Enrolment
INSTITUTE OF INTEGRATED ELECTRICAL ENGINEERS OF THE PHILIPPINES
39TH ANNUAL NATIONAL CONVENTION AND
EXPO 2014 a specialized
Electrical, Electronic and Energy Exposition
IEC 61439-2 & IEC 60439-1 Low Voltage Switchgear and Controlgear Assemblies
Presented by Ir Aaron Leong 26 November 2014, Manila
LV Switchboard It houses devices designed to; • Distribute electrical power • Protect circuits • Protect people • Control and monitor the installation
DEPENDABLE Safety
STANDARD
Reliable Availability Maintainability
Standard body • International Electrotechnical
Commission (IEC) • All the major industrialized countries are
involved • Adopted directly into national specifications and standards
Standard • Switchboard design refers to Standards
governing the entire low voltage domain, and more specifically to standards relating to assemblies. • Compliance with standards is the minimum guarantee of a level of quality and dependability.
IEC 61439-1 & IEC 60439-2 STANDARD PARTS COMPARE
How the standard parts compare • IEC 60439 • Part 1: Type Tested and Partially type tested Assemblies • Part 2: Busbar trunking systems • Part 3: Distribution boards • Part 4: Assemblies for Construction Sites • Part 5: Assemblies for power distribution
How the standard parts compare • IEC 61439 • Part 1: General Rules • Part 2: PSC – Assemblies • Part 3: Distribution boards • Part 4: Assemblies for Construction Sites • Part 5: Assemblies for power distribution • Part 6: Busbar trunking systems • Part 7: Assemblies for use in marinas and similar
locations, camping sites and similar locations, market squares and other similar external public sites
IEC 61439 – Part 1: 2011 General Rules Cross referenced by all other parts of the series. Does not need to be specified, compliance to one of the other parts of the standard automatically determines its compliance
IEC 61439 – Part 2 Power Switchgear and Controlgear Assemblies. “low – voltage switchgear and controlgear assembly used to distribute and control energy for all types of loads, intended for industrial, commercial and similar applications operated by skilled or instructed persons”
Low voltage switchgear and controlgear assemblies
IEC 61439 – Part 2 What is an Assembly? • Enclosure • Earth Bar (protective conductor) • Incoming Device • Air Circuit Breaker (ACB) • Moulded Case Circuit Breaker (MCCB) • Isolator
• Busbars • Main • Distribution
• Outgoing Devices • • • •
Moulded Case Circuit Breakers (MCCB) Fused Isolators Miniature Circuit Breakers (MCB) Additional power circuits (for motor control)
• Auxiliary circuits (controls)
ISOMETRIC VIEW – FULL ENCLOSURE
ISOMETRIC VIEW – WITHOUT DOORS
ISOMETRIC VIEW – WITHOUT COVERS
ISOMETRIC VIEW – CABLE & BUS BAR SYSTEM
How do you comply to the standard? 60439:
61439:
PTTA (partially Type Tested) or TTA (Type Tested) Assemblies (these rules have been distorted)
Design Verification & Routine Verification
IEC 61439 – Part 2 • The Standard also now recognises that there maybe more than one company responsible for the verification of the final Assembly. – Original Manufacturer – Assembly Manufacturer
IEC 61439 – Part 2
Original Manufacturer
Assembly Manufacturer
• Manufacture to Design • Routine Verification
Original & Assembly Manufacturer
• Manufacture to Design • Design Verification • Routine Verification
• Design Production • Design Verification (By Test)
How do you achieve Design Verification? • Verification by test
• Verification by Comparison with a reference design • Verification by Assessment
Not all characteristics can be verified by each of the above in all circumstances. Refer Table D. 1
IEC 60439-Part 1 • TTA or PTTA • Temperature rise limits • Dielectric properties • Short circuit withstand strength • Effectiveness of the protective circuit • Exposed Parts • Short Circuit withstand
• Clearances and creepage distances • Mechanical Operation • Degree of protection
IEC 61439-Part 2 Construction • Strength of materials and parts (clause 10.2) • Degree of protection of enclosures (clause 10.3) • Clearances and creepage distances (clause 10.4)
Design Verification characteristics
• Protection against electric shock and integrity of protective circuits (clause 10.5)
• Incorporation of switching devices and components (clause 10.6) • Internal electrical circuits and connections (clause 10.7) • Terminals for external conductors (clause 10.8)
Strength of materials and parts (10.2) All of the characteristics require verification by test. • Resistance to corrosion • Properties of insulating materials • Resistance to ultra-violet radiation • Lifting • Marking
61439 – Part 2 Strength of materials and parts (10.2) • Resistance to corrosion • Ferrous enclosures and internal components of indoor and outdoor
assemblies upon which mechanical operation may depend.
• Resistance to ultra-violet radiation • If manufactured from / coated in synthetic material and for installation
outdoors
• Lifting • Marking • Properties of insulating materials • Verification of thermal stability of enclosures
• Only relevant to enclosures or technically significant
external parts manufactured of insulating material.
61439 – Part 2
Strength of materials and parts (10.2) • Properties of insulating materials • Verification of resistance of insulating materials to normal heat • Parts that support conductors • Other parts
• Verification of resistance of insulating materials to abnormal heat
and fire due to internal electric effects • Parts that support conductors • Other parts
Note: Verification for normal heat has been removed as a test in Edition 2
Resistance to ultra-violet radiation
Degree of protection of enclosures IEC 60529 •
The IP (Ingress Protection) is broken down to 2 elements •
Degree of protection IEC 60529 • IP XX – Protection against Solid Objects
• IP 2X – 12.5 mm Probe • IP 3X – 2.5 mm Probe • IP 4X – 1mm Probe
• IP 5X – Dust (no pressure) – 8 hours • IP 6X – Dust (negative pressure) – 8 hours
Degree of protection IEC 60529 • IP XX – Protection against water ingress
• IP X1 – Vertical Drips – 10 Minutes • IP X2 – Drips at 15˚ angle • IP X3 – Spray at 0˚ & 60 ˚ angle
• IP X4 – Spray at all angles • IP X5 – Pressured Jet • IP X6 – High Pressured Jet • IP X7 – Temporary submersion • IP X8 - Continuous submersion (depth must be stated)
Degree Protection IP X3 test
Internal Separation of PSC – Assemblies •
IEC 61439 clarifies that there is a difference between Constructional Requirements and internal separation. Form of separation does not specify the construction
•
If each functional unit is to be contained in its own compartment – That is what should be stated.
61439 – Part 2 Clearances and Creepage distances (10.4) • Clearance:
•
The distance from a live conductor to another live conductor or earth through air.
• Creepage: •
The distance over the surface of insulating material from a live conductor to another live conductor or earth
Clearances and Creepage distance
61439 – Part 2 Design Verification characteristics Construction • Strength of materials and parts • Degree of protection of enclosures • Clearances and creepage distances • Protection against electric shock and integrity of protective circuits • Incorporation of switching devices and components • Internal electrical circuits and connections • Terminals for external conductors Performance • Dielectric properties • Temperature rise limits • Short circuit withstand strength • Electromagnetic compatibility • Mechanical Operation
61439 – Part 2 Protection against electric shock and integrity of protective circuits (10.5) • Protection against consequences of a fault within the
assembly • Resistance Measurement
• Protection against consequences of faults in external
circuits supplied through the assembly • Short circuit withstand verification
Verification of Effectiveness of Protective Circuit
61439 – Part 2 Incorporation of switching devices and components (10.6) • Selection • To Suit the assemblies application • Installation • To be installed in accordance with the manufacturers instructions • Not to impair their proper function • Accessibility • Adjusting & resetting shall be easily accessible • Consideration of adjacent functional units • Not too low or too high
61439 – Part 2 Internal electrical circuits and connections (10.7) • Main Circuits • Suitable for short circuit • Busbars • connections
• Neutral conductor size
• Auxiliary Circuits • Bare & Insulated conductors • Suitable for Temperature rise • Suitable for Insulation voltage
61439 – Part 2 Terminals for external conductors (10.8) • Suitability of connection of external conductor • Type of material – Copper / Aluminium / Both • Size of external conductor • Size of cable access • Enables correct cable installation
• Marking
61439 – Part 2 Design Verification characteristics Construction • Strength of materials and parts • Degree of protection of enclosures • Clearances and creepage distances • Protection against electric shock and integrity of protective circuits • Incorporation of switching devices and components • Internal electrical circuits and connections • Terminals for external conductors Performance • Dielectric properties • Temperature rise limits • Short circuit withstand strength • Electromagnetic compatibility • Mechanical Operation
61439 – Part 2 Dielectric Properties (10.9) • Power Frequency •
Assesses the insulation resistance
• Impulse • •
Assesses the ability to the assembly to cope with a voltage spike Manufacturer to define kV
Dielectric Properties
61439 – Part 2 Design Verification characteristics Construction • Strength of materials and parts • Degree of protection of enclosures • Clearances and creepage distances • Protection against electric shock and integrity of protective circuits • Incorporation of switching devices and components • Internal electrical circuits and connections • Terminals for external conductors Performance • Dielectric properties • Temperature rise limits • Short circuit withstand strength • Electromagnetic compatibility • Mechanical Operation
Temperature Rise Limits that effect the ratings are: • Built in Components • Busbars and conductors, Plug-in contacts of removable or withdrawable parts which connect to busbars • Discrete arrangements of plug and socket type connections
Temperature Rise Limits • Maximum Ambient Temperature • 40 Degrees ˚C • 50 Degrees ˚C
• Maximum Working Temperature Maximum Working Temperature – Maximum Ambient Temperature = Temperature Rise
135 ˚C - 50 ˚C = 85 K (˚C)
• The temperature measured and considered is the rise that is achieved after stabilisation (<1K in 1 Hour) level of rise is stated in K (Kelvin) 1K = 1˚C
Temperature Rise Limits Specified Limits (Based at 40 Degrees ˚C Maximum Ambient)
• Terminals for external insulated conductors: 70K • Manual Operating Means • Of Metal: 15K • Of Insulating Material: 25K • Accessible external enclosures and covers: • Metal Surfaces: 30K • Insulating Surfaces: 40K • Bare Copper busbars & Conductors: 105K • Refer Table 6 in IEC61439
61439 – Part 2 Temperature Rise Limits There has been a significant change to the way assemblies are rated for its operational current. • Rated current – Of the Assembly (InA) – Of a circuit (Inc)
• Rated diversity factor (RDF)
61439 – Part 2 Design Verification characteristics Construction • Strength of materials and parts • Degree of protection of enclosures • Clearances and creepage distances • Protection against electric shock and integrity of protective circuits • Incorporation of switching devices and components • Internal electrical circuits and connections • Terminals for external conductors Performance • Dielectric properties • Temperature rise limits • Short circuit withstand strength • Electromagnetic compatibility • Mechanical Operation
61439 – Part 2 Short Circuit Withstand Strength (10.11) Verification is not required where: • The Assembly is rated Icw or Icc below 10kA • Assemblies and circuits protected by a current limiting
device having a cut off not exceeding 17kA • Auxiliary circuits connected via a transformer which is
within specified limits.
61439 – Part 2 Short Circuit Withstand Strength (10.11)
Busbars, incoming device & outgoing devices
Short Circuit Withstand Strength • Tests conducted • 3 phase main bars • 1 phase to neutral main bars • 3 phase dropper bars • 1 phase to neutral dropper bars • 3 phase incoming circuit • 1 phase to neutral incoming circuit • 3 phase outgoing circuits • 1 phase to neutral outgoing circuits
Video
FRONT VIEW – WITHOUT COVERS
61439 – Part 2 Design Verification characteristics Construction • Strength of materials and parts • Degree of protection of enclosures • Clearances and creepage distances • Protection against electric shock and integrity of protective circuits • Incorporation of switching devices and components • Internal electrical circuits and connections • Terminals for external conductors Performance • Dielectric properties • Temperature rise limits • Short circuit withstand strength • Electromagnetic compatibility • Mechanical Operation
61439 – Part 2 Design Verification characteristics Construction • Strength of materials and parts • Degree of protection of enclosures • Clearances and creepage distances • Protection against electric shock and integrity of protective circuits • Incorporation of switching devices and components • Internal electrical circuits and connections • Terminals for external conductors Performance • Dielectric properties • Temperature rise limits • Short circuit withstand strength • Electromagnetic compatibility • Mechanical Operation
61439 – Part 2 Routine Verification
Design Verification
Routine Verification
Performed on representative samples and designs
Performed on every supplied assembly – by checking against Design Verification
61439 – Part 2 Routine Verification characteristics Construction • Degree of protection of enclosures • Clearances and creepage distances • Protection against electric shock and integrity of protective circuits • Incorporation of switching devices and components • Internal electrical circuits and connections • Terminals for external conductors • Mechanical Operation Performance • Dielectric properties • Wiring, operational performance and function
IEC 61439 – Parts 1 & 2 To Summarise PTTA & TTA replaced by design verification Original and Assembly manufacturer recognised Clarity provided in where design rules and calculation can be used
Clarification in the form of separation New tests required on enclosure
Changes in the temperature rise test procedure Routine verification improved to cross reference design verification
IEC 61641: 2008 ARCING DUE TO INTERNAL FAULT
IEC 61641 Arcing due to internal fault • Possible cause of electrical arcs • Arc due to dielectric breakdown • Introduction of foreign object • Faulty connection • Pressurised ionised gases
Video
Video
Arcing Fault Containment Test
Fail
Arcing Fault Containment Test
Pass
Arcing Fault Containment Test
Before
After
IEC 61641 Arcing due to internal fault • Load side of the outgoing functional unit
• Supply side of the outgoing functional unit • Along the distribution busbar • Along the main busbar
• Load side of the incoming functional unit • Supply side of the incoming functional unit
Arcing due to internal fault The Purpose • To verify the effectiveness of the construction of Form Separation for the Assembly • To assess the ability of the Assembly to limit the risk of personal injury resulting from an internal Arcing Fault. • Dielectric tests were performed after the Arcing Fault Test.
Arcing due to internal fault The Assessment of Test Results • All covers, doors and fastenings were intact • No components were dislodged • The cotton gauze did not ignite & damages were confined to that unit, • Proof of minimum risk of personal injury • Busbar and all other functional units remain firm for further service.
QUESTION & ANSWER
Question and answer • When short circuit occurred to the LV switchboard,
can the switchboard be operated again? Why? • When an arc occurred at the LV switchboard, can
the switchboard be operated again? Why? • Why Form 4B and arc fault containment for your