MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construct...

2 downloads 692 Views 532KB Size
MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construction. * Must be tested unless provided by an Approved Manufacturer. ** When the Basis of Acceptance is not “Test”, the sampling criteria below may be used when there are concerns with material quality.

Basis of Acceptance

Sample Frequency If Required by the Engineer**

Sample Size

Maximum VI Quantity

VI

-

-

-

See Standard Plans for Sizes.

Gen Cert

-

-

-

24” or less. For larger than 24” construct per Section 706 of Standard Specifications.

404.02C Underdrain Outlet Endings

VI

-

-

-

501.02 Asphalt, Release Agents

VI

-

-

-

Spec. No. and Material Name 401.03E End Section Grate for Culverts 401.03E Precast Concrete Headwalls

Remarks (QPL Reference)

See Standard Plans.

NOTE: Must be approved by the project engineer. No fuel or oil based agents. 502.02B Overband Crackfill, Asphalt Rubber (Alt. 2) 603.03B2 Adhesive Systems for Grouting Dowel Bars and Tie Bars for Full-Depth Concrete Pavement Repairs

Gen Cert

-

-

-

Must be a Qualified Product (502.02B).

Gen Cert

-

-

-

Must be a Qualified Product (603.03B2).

NOTE: Use for grouting to existing concrete in the same direction of traffic in the same lane as the repair. For grouting lane ties (deformed bars positioned transverse to the direction of traffic located between traffic lanes) select from Adhesive Anchor Systems for Structural Anchors and Lane Ties (712.03J). 603.03B11 Bond Breaker Tape

VI

-

-

-

702.02A Standard Mortars and Grouts

VI

-

-

-

Gen Cert

-

-

-

Test Data Cert

-

-

-

702.02B Non-Shrinking Mortar and Grout, Type H-1(Non-Metallic) Pre-Mixed 702.02C Admixture for Expansive Grout, Type E-1

Must be a Qualified Product (702.02B).

NOTE: Certification to include manufacturers recommended dosage per sack of cement. Include all General Certification documentation and sample of the cement with which it is being used with CV samples. 703 Prepackaged Hydraulic Fast Set Mortar 706.03K4 Expansion Joint Devices for Bridges 706.03S Penetrating Water Repellent (Protective Coating for Concrete)

Gen Cert

-

-

-

Must be a Qualified Product (703).

See Remark

-

-

-

See project plans for list of approved devices and details.

Gen Cert

-

-

-

Must be a Qualified Product (706.03S).

MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construction. * Must be tested unless provided by an Approved Manufacturer. ** When the Basis of Acceptance is not “Test”, the sampling criteria below may be used when there are concerns with material quality.

Spec. No. and Material Name 707.02 Bushings for Pins and Link Plates 708.03A Prestressed Concrete 710.03D Waterproofing Shotcrete 712.03A1c Abrasive, Low Dusting 712.03D Epoxy Mastic 712.03J Adhesive Anchor Systems for Structural Anchors and Lane Ties 712.03K Structure Expansion Anchors (Mechanical Expansion Anchors)

712.03L Mechanical Reinforcement Splicing

712.03X Grout Under Masonry Plates 712.03Y Embedded Galvanic Anodes 713.02B Sealant for Perimeter of Beam Repairs 715.02 Coating Systems for New Hanger Assemblies 715.02 Abrasive, Low Dusting 715.02 Abrasive, Steel Grit 716.02 Abrasive, Low Dusting

Basis of Acceptance

Sample Frequency If Required by the Engineer**

Sample Size

Maximum VI Quantity

Gen Cert

-

-

-

Must be a Qualified Product (707.02).

Fabrication Inspection

-

-

-

MQAP Manual Section 4.04.

VI

-

-

-

Gen Cert

-

-

-

VI

-

-

-

Gen Cert

-

-

-

Must be a Qualified Product (712.03J).

Gen Cert See Remark

-

-

-

Must be a Qualified Product (712.03K). Pull-out testing is required see MQAP Manual Section 4.03.

Gen Cert See Note

1 per project

2 splices

-

See Special Instructions. Must be a Qualified Product (712.03L).

VI

-

-

-

Gen Cert See Remark

-

-

-

Must be a Qualified Product (712.03Y).

Gen Cert

-

-

-

Must be a Qualified Product (713.02B).

Gen Cert See Remark

-

-

-

Must be a Qualified Product (915).

Gen Cert

-

-

-

Must be a Qualified Product (715.02).

VI

-

-

-

-

-

-

Gen Cert

Remarks (QPL Reference)

See Section 715.02.

Verify uniform profile after blasting of 1 to 2.8 mils per SSPC. See Section 715.02.

MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construction. * Must be tested unless provided by an Approved Manufacturer. ** When the Basis of Acceptance is not “Test”, the sampling criteria below may be used when there are concerns with material quality.

Basis of Acceptance

Sample Frequency If Required by the Engineer**

Sample Size

Maximum VI Quantity

Gen Cert

-

-

-

Must be a Qualified Product (803.02B).

804.01 Glare Screen

VI

-

-

-

Included in Concrete Spec.

808.03C Temporary Fence Materials

VI

-

-

-

Fabrication Inspection

-

-

-

MQAP Manual Section 4.06

811.03D1 Waterborne, Liquid Pavement Marking Materials

Gen Cert

-

-

-

Must be a Qualified Product. MQAP Manual Section 6.15. Must be a Qualified Product (811.03D1).

811.03D2 Low Temperature Waterborne, Liquid Pavement Marking Materials

Gen Cert

-

-

-

Must be a Qualified Product. MQAP Manual Section 6.15. Must be a Qualified Product (811.03D2).

811.03D3 Regular Dry Paint, Liquid Pavement Marking Materials

Gen Cert

-

-

-

Must be a Qualified Product. MQAP Manual Section 6.15. Must be a Qualified Product (811.03D3).

811.03D4 Cold Plastic Tape, Liquid Pavement Marking Materials

Gen Cert

-

-

-

Must be a Qualified Product. MQAP Manual Section 6.16. Must be a Qualified Product (811.03D4).

811.03D5 Thermoplastic Liquid Pavement Marking Materials

Gen Cert

-

-

-

Must be a Qualified Product. MQAP Manual Section 6.15. Must be a Qualified Product (811.03D5).

811.03D5 Thermoplastic, Blocks Rumble Strips and Snowmobile Crossings

Gen Cert

-

-

-

Must be a Qualified Product. MQAP Manual Section 6.15. Must be a Qualified Product (811.03D5).

811.03D6 Thermoplastic, Sprayable, Liquid Pavement Marking Materials

Gen Cert

-

-

-

Must be a Qualified Product. MQAP Manual Section 6.15. Must be a Qualified Product (811.03D6).

811.03D7 Polyurea, Liquid Pavement Marking Materials

Gen Cert

-

-

-

Must be a Qualified Product. MQAP Manual Section 6.15. Must be a Qualified Product (811.03D7).

811.03D8 Modified Urethane, Liquid Pavement Marking Materials

Gen Cert

-

-

-

Must be a Qualified Product. MQAP Manual Section 6.15. Must be a Qualified Product (811.03D8).

811.03D9 Preformed Thermoplastic, Preformed Pavement Marking Material

Gen Cert

Spec. No. and Material Name 803.02B Detectable Warning Surfaces

810.03O Bridge Sign Connections

Remarks (QPL Reference)

Must be a Qualified Product. MQAP Manual Section 6.15. Must be a Qualified Product (811.03D9).

901 Cement

Appr Mfr

See Remark

10 lb

45 ton

901.06 Slag Cement

Appr Mfr

-

10 lb

-

See Special Instructions, see MQAP Manual Section 3.06. See Special Instructions for Cement.

MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construction. * Must be tested unless provided by an Approved Manufacturer. ** When the Basis of Acceptance is not “Test”, the sampling criteria below may be used when there are concerns with material quality.

Basis of Acceptance

Sample Frequency If Required by the Engineer**

Sample Size

Maximum VI Quantity

Appr Mfr

-

10 lb

-

902 Coarse Aggregates

Test

See Remark

50 lb

100 ton

902 Dense-Graded Aggregates

Test

See Remark

50 lb

500 ton

902 Open-Graded Aggregates

Test

See Remark

50 lb

100 ton

902 Granular Material Class I

Test

See Remark

50 lb

100 ton

902 Granular Material Class II (Subbase) and Class IIA

Test

See Remark

50 lb

500 cyd

902 Class II (Abutment B. F.)

Test

See Remark

50 lb

100 cyd

902 Granular Material Class III

Test

See Remark

50 lb

500 cyd

902 Granular Material Class IIIA

Test

See Remark

25 lb

100 cyd

902 Fine Aggregate

Test

See Remark

25 lb

100 ton

Test See Remark

1 per project

1 qt

10 ton

Gen Cert

-

-

-

Must be a Qualified Product (903.01).

Gen Cert

-

-

-

Must be a Qualified Product (903.02).

903.03 Latex Admixture for Concrete

Appr Mfr

1 per lot

1 qt

-

903.04 Concrete Accelerators 1. Calcium Chloride 2. All Others

VI Gen Cert

-

-

-

Spec. No. and Material Name 901.07 Fly Ash, Pozzolanic Admixtures for Concrete

902 Mineral Filler for HMA Mixtures 903.01 Air Entraining Admixtures

903.02 Water Reducing and Water Reducing Retarding Admixtures for Concrete

Remarks (QPL Reference) See Special Instructions for Cement.

Refer to Chapter 3 of the Procedures for Aggregate Inspection Manual for sampling information. See Current List of all Prequalified Aggregate Sources at Construction Field Services Web Page. Actual Current List of Prequalified Aggregate Sources web page address: http://www.michigan.gov/document s/mdot/MDOT_PrequalifiedAggreg ateSourceList_387538_7.pdf

Refer to Section 902.11 of the 2012 Standard Specifications.

For calcium chloride note the chemical composition. Other accelerators must be Qualified Products (903.04).

MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construction. * Must be tested unless provided by an Approved Manufacturer. ** When the Basis of Acceptance is not “Test”, the sampling criteria below may be used when there are concerns with material quality.

Spec. No. and Material Name 903.06 Membrane Curing Compound

Basis of Acceptance

Test Data Cert

Sample Frequency If Required by the Engineer** 1 per lot or batch

Sample Size

Maximum VI Quantity

1 qt

200 gal

Remarks (QPL Reference)

NOTE: Curing compounds must not be used after ONE year from manufacture. Date of manufacture must be clearly printed on the outside of containers. 903.07A Interim Curing (Linseed Oil Based)

Test Data Cert

1 per lot or batch

1 qt

50 gal

Test Data Cert

-

-

10 sheets

Test Data Cert

-

-

-

See Remark

1 per batch

(2) 1 qt containers

-

See Special Instructions.

904.03B Liquid Asphalt (MC)

Gen Cert

1 per batch

See Remark

-

1 gal from the top and 1 gal from the bottom of tank.

904.03B Liquid Asphalt (RC-250)

Gen Cert

1 per batch

2 qt

5 gal

Appr Mfr * See Remark

See Remark

See Remark

-

See Special Instructions.

905.03 Bar Reinforcement (Uncoated)

Appr Mfr *

1 per project per mfr per size

See Remark

500 lb

See Special Instructions.

905.03 Bar Reinforcement (Epoxy Coated) 1. Bar 2. Epoxy Coating Companies 3. Epoxy Coating Material (905.03C)

Appr Mfr * Appr Mfr * Gen Cert

1 per project per mfr per size

See Note

500 lb

See Special Instructions. Epoxy coating must be a Qualified Product (905.03C).

VI

-

-

-

Appr Mfr *

1 per project per mfr

See Remark

500 syd

See Special Instructions.

Appr Mfr *

1 per heat

2 pcs each 60 in long

-

See Special Instructions.

903.07C Insulating Blanket 903.07D Polystyrene Insulation 904.03A Asphalt Binder for HMA Mixtures

904.03C Emulsified Asphalt

905.03D Bar Chairs and Wire Ties for Epoxy Coated Steel Reinforcement 905.06 Welded Steel Wire Reinforcement (Mesh) 905.07 Strand for Prestressed Concrete

See Note for 903.06 above.

MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construction. * Must be tested unless provided by an Approved Manufacturer. ** When the Basis of Acceptance is not “Test”, the sampling criteria below may be used when there are concerns with material quality.

Spec. No. and Material Name 905.08 Tendons for Post Tensioning of Box Beams (Prestressing Strand) 905.08 Tendons for Post Tensioning of Box Beams (Post Tensioning Bar) 906.04 Structural Steel 906.05 Foundation Piles (Steel H Piling and Special Sections, Steel Shells for Castin- Place Concrete Piles and Pile Points) 906.05 Pile Cutoffs 906.06 Steel Piles (Temporary and Permanent Steel Sheet Piling) 906.07 High Strength Steel Bolts, Nuts, and Washers for Structural Joints 906.08 Pins and Link Plates for Steel Bridge Construction 906.09 Shear Developers (Studs) 907.03A - C Woven Wire Fence (Woven Wire Fabric, Barbed Wire, Smooth Line Wire)

Basis of Acceptance

Sample Frequency If Required by the Engineer**

Sample Size

Maximum VI Quantity

Remarks (QPL Reference)

Appr Mfr * See Remark

1 per heat

2 pcs each 60 in long

-

See Special Instructions.

Test

1 per heat per project

2 pcs each 30 in long

-

Fabrication Inspection

-

-

-

Test Data Cert

-

-

-

Gen Cert

-

-

-

Gen Cert

-

-

-

Test

1 assembly per dia per length per heat per project

3 assemblies

-

See Special Instructions.

Fabrication Inspection

-

-

-

MQAP Manual Section 4.05

Gen Cert

-

-

-

Must be a Qualified Product (906.09).

Test Data Cert

1 per project per mfr

Full width of roll 5 ft

400 ft

MQAP Manual Section 4.05.

6 ft 4 ft 907.03D Woven Wire Fence (Steel Posts) 907.03E Woven Wire Fence (Treated Wood Posts) 907.03F Woven Wire Fence (Gates)

Test Data Cert

1 per project per mfr

1 post

25 posts

See Remark

-

-

-

VI

-

-

-

See Section 912.07B.

MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construction. * Must be tested unless provided by an Approved Manufacturer. ** When the Basis of Acceptance is not “Test”, the sampling criteria below may be used when there are concerns with material quality.

Spec. No. and Material Name 907.04A Steel Chain Link Fence (Fabric)

Basis of Acceptance

Sample Frequency If Required by the Engineer**

Sample Size

Maximum VI Quantity

Test Data Cert

See Remark

5 ft full width of roll

250 ft

907.04B Steel Chain Link Fence (Tension Wire)

Gen Cert

1 per project per mfr

3 ft

500 ft

907.04C Steel Chain Link Fence (Post for Fence and Gates), (Pedestrian Fence and Structure Fencing (Steel))

Test Data Cert

1 per project per mfr

1 post

25 posts

Remarks (QPL Reference)

1 per height and/or mesh size, per project and 1 per mfr per project.

See Special Instructions.

NOTE: An alternative zinc/clear coat system will be allowed for pipe sections only. This alternative coating system shall comply with subsection 907.03D of the Standard Specifications for Construction. 907.04C Steel Chain Link Fence (Top Rail), ((Horz. Rail) (Pedestrian Fence))

Test Data Cert

1 per project per mfr See Remark

5 ft

250 ft

VI

-

-

-

Test

1 per project per mfr

3 ft

250 ft

907.05B High Tensile Wire Fence (Treated Wood See Remark Posts)

-

-

-

907.05C High Tensile Wire Fence (Hardware)

VI

-

-

-

VI

-

-

-

VI

-

-

-

908.07 Sheet Lead

Gen Cert

-

-

25 sft

908.08 Sheet Copper

Gen Cert

1 per consignment

13 in square or equivalent area

25 sft

907.04D & E Steel Chain Link Fence (Gates, Fence Fittings and Hardware) 907.05A High Tensile Wire Fence (Wire)

907.06 Protective Fence 908 Castings, Manhole 908.03 Malleable Iron 908.04 Steel 908.05 Gray Iron

See Special Instructions.

See Section 912.07B.

May be accepted in field if weight requirements can be documented.

MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construction. * Must be tested unless provided by an Approved Manufacturer. ** When the Basis of Acceptance is not “Test”, the sampling criteria below may be used when there are concerns with material quality.

Basis of Acceptance

Sample Frequency If Required by the Engineer**

908.09A Tubing, Steel Railings (Base Plate, Angle, and Non-Tubular Post Elements)

Fabrication Inspection

1 per heat per project

1 base plate, 1 post 9 in length

-

908.09B Tubing, Steel Railings (Rail Elements and Tubular Post Elements)

Fabrication Inspection

1 per heat per project

36 in long, galv

-

1 assembly

-

Spec. No. and Material Name

908.09C Tubing, Steel Railings (Hardware)

908.10 Hardware for Timber Construction

Test

1 assembly per heat per diameter per project

Sample Size

Maximum VI Quantity

Remarks (QPL Reference) MQAP Manual Section 4.05. See Special Instructions. MQAP Manual Section 4.05. See Special Instructions.

See Special Instructions.

VI

-

-

-

Appr Mfr *

1 per project per mfr

1 piece at least 1 ft length

125 ft

Appr Mfr *

-

-

-

VI

-

-

-

908.11B Wire Rope

Gen Cert

-

-

-

908.12 Steel Posts for Beam Guardrail

Appr Mfr *

1 per 1000 posts or fraction thereof

1 post

25 posts

VI See Remark

-

-

-

Inspect galvanizing, dimensions and type of sheeting.

Test

1 assembly per heat per diameter per project

1 assembly

-

See Special Instructions.

908.14D Anchor Bolts and Nuts for Other Purposes

Gen Cert

1 assembly per heat per diameter per project

1 assembly

-

See Special Instructions.

909.01 Recycled Rubber Adjusting Rings for Manholes and Drainage Castings

Gen Cert

-

-

-

Must be a Qualified Product (909.01).

908.11A Guardrail, Steel Beam Elements, End Sections 908.11A Guardrail Approach Terminals 908.11B & C B. Hardware

Including Anchorage, Bridge, Shoes, Departing End Terminals.

Item supplied by guardrail supplier.

C. Steel Sleeves, Soil Plates, Bearing Plates, Backup Plates

908.13 Reflective Washers 908.14 Anchor Bolts, Nuts, and Washers

MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construction. * Must be tested unless provided by an Approved Manufacturer. ** When the Basis of Acceptance is not “Test”, the sampling criteria below may be used when there are concerns with material quality.

Basis of Acceptance

Sample Frequency If Required by the Engineer**

Sample Size

Maximum VI Quantity

Gen Cert

-

-

-

Must be a Qualified Product (909.03).

VI

-

-

-

Part of Watertight Joint System.

VI

1 per lot or shipment

18 in length full width of gasket

-

Part of Watertight Joint System.

909.04A Reinforced Concrete Pipe

Appr Mfr *

1 percent of number of pcs of each size

See Remark

5 pieces of See Special Instructions. 42 in or smaller

909.04B Reinforced Concrete Elliptical Pipe

Appr Mfr *

1 percent of number of pcs of each size

See Remark

5 pieces of See Special Instructions. 42 in or smaller

909.04C Non-Reinforced Concrete Pipe

Appr Mfr *

See Remark

See Remark

10 pcs

Appr Mfr * See Remark

-

-

-

Spans 20 ft. and greater require QA inspection. QA inspection may be required for spans from 10-20 ft Box = 4 sided. See MQAP Manual section 4.11.

Appr Mfr *

1 percent of number of pcs

Full size units

10 pcs

Strength test by coring or cylinders, VI dimensions and conditions. Test for air content. .

Appr Mfr See Remark

-

-

-

909.05A Corrugated Steel Pipe

Appr Mfr *

See Remark

See Remark

-

See Special Instructions. General Cert to Construction Field Services.

909.05A1 Corrugated Steel Sheets (Galvanized)

Gen Cert

See Remark

See Remark

-

See Special Instructions.

Gen Cert

-

-

-

Coating must be from Qualified Products List (909.05A1).

Gen Cert

-

-

5 pcs

Spec. No. and Material Name 909.03 Watertight Joint Systems 909.03 Gasket, Compression (O-Rings) 909.03 Gasket, External Rubber Type

909.04D Precast Concrete Box Sections

909.04E Precast Concrete End Section for Culverts and Sewers 909.04G Precast Concrete Three-Sided or Arch Culverts

909.05A1 Polymer Coating, Galvanized Corrugated Steel Pipe 909.05A4 Coupling Bands

Remarks (QPL Reference)

See Special Instructions.

Spans 20 ft. and greater require QA inspection. QA inspection may be required for spans from 10-20 ft, See MQAP Manual section 4.11.

MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construction. * Must be tested unless provided by an Approved Manufacturer. ** When the Basis of Acceptance is not “Test”, the sampling criteria below may be used when there are concerns with material quality.

Basis of Acceptance

Sample Frequency If Required by the Engineer**

Sample Size

Maximum VI Quantity

909.05B Corrugated Aluminum Alloy Sheet

Gen Cert

See Remark

See Remark

25 sheets

909.05B Corrugated Aluminum Alloy Pipe

Gen Cert

1 per 1000 ft

See Remark

250 ft

909.05C Steel End Section

Gen Cert

-

-

4 pcs

909.05D 1. Steel Pipe (Jacked-in-Place)

Gen Cert

-

-

-

VI

-

-

-

Test or Tested Stock if ≥12 in. dia

≥12 in. dia 1 per 1000 ft straight lengths

See Remark

12 in. dia and over, 100 ft

Over 12 in. dia- one 10 ft length and one 6 ft length plus coupling. See Special Instructions.

Test

1 per 1000 ft straight lengths

See Remark

12 in. dia and over, 100 ft

Over 12 in. dia- one 10 ft and one 6 ft. length plus coupling.

Gen Cert See Note

-

-

-

Spec. No. and Material Name

909.05D 2. Casing, Steel Pipe 909.06 1. Corrugated Polyethylene Pipe (CPE/HDPE), (Smooth Lined Type S) 909.06 2. Corrugated Polyvinyl Chloride (CPV) Pipe 909.06 3. Class B (CPE/HDPE & CPV)

Remarks (QPL Reference)

See Special Instructions. Sample Size: A 6 in by 3 in (minimum) section cut from the end of the pipe avoiding the seams. Do not damage coating.

Must be a Qualified Product (909.06).

NOTE: Watertight Joint Systems (909.03) and Pipe (401 & 402; Class B Bury) must be listed on QPL. Pipe (909.06) must be accepted by “Test” or “Tested Stock” for use on project. 909.06 4. Smooth Polyvinyl Chloride (PVC) Pipe and Fittings for Sanitary Sewer

VI

1 per 6000 ft

1 piece, 5 ft in length

-

909.07A Pipe for Underdrains Smooth Perforated Plastic Pipe (PVC)

Test

1 per 2500 ft or fraction thereof

5 ft length

250 ft

909.07B Pipe for Underdrains Corrugated Plastic Tubing (Perforated and Non-Perforated) (Wrapped and Non-Wrapped)

Appr Mfr * 4-, 6-, or 8in dia

1 per 5000 ft sample from coils

See Remark

250 ft

Sample Size, one 10 ft length plus coupling. For perforated tubing wrapped in fabric, tie fabric securely in place before cutting sample.

Test

1 per 2500 ft or fraction thereof

5 ft length

250 ft

See 404.02C for Underdrain Outlet Endings.

909.07C Outlet Pipe for Underdrains 1. Polyvinyl Chloride (PVC) Pipe

If bell and spigot joint, sample from spigot end.

MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construction. * Must be tested unless provided by an Approved Manufacturer. ** When the Basis of Acceptance is not “Test”, the sampling criteria below may be used when there are concerns with material quality.

Basis of Acceptance

Sample Frequency If Required by the Engineer**

Sample Size

Maximum VI Quantity

909.07C Outlet Pipe for Underdrains 2. Corrugated Steel Pipe

Appr Mfr *

See Remark

See Remark

-

909.07C Outlet Pipe for Underdrains 3. Corrugated Aluminum Alloy Pipe

Gen Cert

1 for 1000 ft

6 in x 3 in

250 ft

VI

-

-

-

909.08B Culvert, Downspouts 1. Corrugated Steel Pipe

Appr Mfr *

See Remark

See Remark

-

909.08B Culvert, Downspouts 2. Corrugated Aluminum Alloy Pipe

Gen Cert

1 per 1000 ft

6 in x 3 in

250 ft

Test

See Remark

See Remark

Gen Cert

-

-

-

Test

1 per shipment from a single container

1 qt

10 gal

See Delineator Posts

-

-

-

Test

See Remark

See Remark

See Remark

-

-

910.03B Liner for Rip-Rap

Test

See Remark

See Remark

910.03B Liner for Heavy Rip-Rap

Test

See Remark

See Remark

Spec. No. and Material Name

909.08A Bridge Deck Downspouts

909.08B Culvert, Downspouts 3. Corrugated Polyethylene Pipe (Corrugated Lined Type C) (CPE/HDPE) 909.08C Bridge Deck Drain Extensions (Polyethylene) 909.09 Cold Applied Pipe Joint Sealer (Mastic)

909.10 Drainage Marker Post

910.03A Geotextiles 1. Blankets 2. Filter Bags 910.03A Knitted Sock Pipe Wrap

Remarks (QPL Reference) See Special Instructions for 909.05A,. See 404.02C for Underdrain Outlet Endings.

See 404.02C for Underdrain Outlet Endings. See 909.05B.

See 909.05A Corrugated Steel Pipe.

See 909.05B.

<12 in. dia See 909.06 (1) up to 250 ft >12 in. dia up to 100 ft

See Special Instruction 910.03. See Remark Anticipate up to 28 calendar days for the testing of geotextile samples. -

See 909.07B Certified with Corrugated Plastic Tubing.

See Special Instruction 910.03. See Remark Anticipate up to 28 calendar days for the testing of geotextile samples. See Special Instruction 910.03. See Remark Anticipate up to 28 calendar days for the testing of geotextile samples.

MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construction. * Must be tested unless provided by an Approved Manufacturer. ** When the Basis of Acceptance is not “Test”, the sampling criteria below may be used when there are concerns with material quality.

Basis of Acceptance

Sample Frequency If Required by the Engineer**

Sample Size

910.03C Separator/Stabilization Geotextile

Test

See Remark

See Remark

910.03D Geogrids

Test

1 per type per project

1 pc 6 ft long full roll width

-

910.04 Silt Fence; (Geotextile Fabric only)

Gen Cert

-

-

-

Must be a Qualified Product (910.04).

910.05A Prefabricated Drainage System

Appr Mfr *

1 per 10,000 ft or less

1 pc 6 ft long plus 3 syd filter-wrap

-

Test Data Cert must be attached to sample ID Form.

Test

1 per 1000 ft or less

1 pc 6 ft long plus 3 syd filter-wrap

100 sft

Test See Remark

1 per source

1 qt

-

Water approved for drinking by the Michigan Dept of Public Health may be used without sampling and testing.

Appr Mfr *

Each Charge

22 cores See Remark

-

48 cores if treatment is creosote.

VI

-

-

-

912.07B Treated Wood; Fence Posts, Guide Posts, Guard Posts and Mail Box Posts

VI

-

-

-

912.08 Wood Posts and Blocks for Guardrail and Highway Signs (Dimension Sawed)

Appr Mfr *

Each Charge

22 cores

-

Spec. No. and Material Name

910.05B Wall Drain

911 Water

912.05 Structural Timber and Lumber 912.06 Timber Piles

Maximum VI Quantity

Remarks (QPL Reference)

See Special Instruction 910.03. See Remark Anticipate up to 28 calendar days for the testing of geotextile samples. Sample must be rolled not folded. Anticipate up to 28 calendar days for the testing of geotextile samples.

Cedar post need not be treated.

NOTE: All post must be treated except Northern White Cedar. General Certification document required for Northern White Cedar in lieu of approved manufacturer. 912.08Q Recycled Plastic or Rubber Guardrail Offset Blocks

Gen Cert

-

-

-

912.09 Timber for Rustic Construction

Gen Cert

-

-

-

Must be a Qualified Product. May only be used on Steel Posts (912.08Q).

MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construction. * Must be tested unless provided by an Approved Manufacturer. ** When the Basis of Acceptance is not “Test”, the sampling criteria below may be used when there are concerns with material quality.

Spec. No. and Material Name 913.03 Clay and Sand Lime Brick and Block 913.03C Concrete Brick

913.05 Concrete Block 913.06 Precast Reinforced Concrete Units for Drainage Structures (Tops, Risers, Sump Bases and Adj. Rings) 913.07 Precast Concrete Bases, for Drainage Structures 913.08 Structural Tile 913.09 Slope Pavement Blocks 914.03 Bituminized Fiber Joint Filler 914.03B Recycled Rubber Joint Filler 914.04A Hot-Poured Joint Sealant

914.04B Backer Rod for Use with Hot-Poured Joint Sealant 914.05 Epoxy Binder, For Joint Spall Repair 914.06 Epoxy Resin Adhesive and Temporary Seal (Crack Injection)

Basis of Acceptance

Sample Frequency If Required by the Engineer**

Sample Size

Maximum VI Quantity

Test

1 per 250,000 or fraction thereof

6 pcs

1000 pcs

Test Data Cert

See Remark

6 pcs

1000 pcs

Test Data Cert

See Remark

4 pcs

1000 pcs

Appr Mfr *

1 percent per size

See Remark

Appr Mfr *

5 percent of total

-

10 pcs total

Test

1 per proj.

6 tiles

1000 tiles

Appr Mfr *

1 per 25,000

6 blocks

1000 pcs

Test Data Cert

1 per 1000 sft or fraction thereof

2 ft See Remark

150 sft

Gen Cert

-

-

-

Test or Tested Stock

1 per batch from a single container

5 lb.

100 lb

VI

-

-

-

See Remark

5 gal

-

-

Test or 1 per lot or batch Tested Stock number Gen Cert

-

Remarks (QPL Reference)

1 from each 10,000 bricks or fraction thereof; 2 from lots more than 10,000 to 100,000; 3 from each lot over 100,000. One from lot of 10,000 or fraction thereof; 2 from lots more than 10,000.

Submit QA cylinder test results and 10 pcs total core samples. Submit sample 1-3 sq.in. from wall of unit if absorption is required.

Sample for structure to be at least 5 in. wide. ¼ in. filler need not be sampled. Must be a Qualified Product (914.03B). Do not submit melted samples.

See Special Instructions.

Must be a Qualified Product (914.06).

MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construction. * Must be tested unless provided by an Approved Manufacturer. ** When the Basis of Acceptance is not “Test”, the sampling criteria below may be used when there are concerns with material quality.

Spec. No. and Material Name 914.07 Transverse Pavement Joints 1. Dowel Bars

2. Dowel Baskets (Load Transfer Assemblies)

Basis of Acceptance

Sample Frequency If Required by the Engineer**

Sample Size

Maximum VI Quantity

Appr Mfr

-

1 bar

1200 bars

Appr Mfr

-

Full size unit

Appr Mfr *

1 per project per mfr

1 bar

240 bars

2. Epoxy Coating Material

Gen Cert

-

-

-

3. Bond Release a. Bituminous Material b. Alternate Bond Release Agents

Gen Cert Gen Cert

-

-

914.07C Dowel Bar Expansion Caps

VI

-

-

-

914.08 End-of-Pour Joint Devices

VI

-

-

-

914.08 Deformed Bars 1. Bars 2. Epoxy Coating

Appr Mfr * Gen Cert

1 per project per mfr

-

500 lb

914.09 Straight and Bent Tie Bars for Longitudinal Pavement Joints (Lane Ties) 1. Bars 2. Epoxy Coating

Appr Mfr * Gen Cert

1 per project per mfr

2 bar

500 lb

Test

1 per 5000 pcs or fraction thereof

1 bolt

250 units

Gen Cert See Remark

-

-

-

Test Data Cert

-

-

-

914.11 Preformed Waterproofing Membrane and Joint Waterproofing Membrane 914.12 Elastomeric Bearings

Bond Release Agent must be a Qualified Product (914.07A). See Special Instructions 914.07.

100 Fabrication Inspection required, assemblies MQAP Manual Section 4.07.

914.07A Coatings for Dowel Bars 1. Epoxy Coating Companies

914.10 Bolts for Structure Expansion Anchors

Remarks (QPL Reference)

Coating must be a Qualified Product (905.03C).

20 gal max Must be a Qualified Product (914.07A) or meet Standard Spec 914.07A. Caps must conform to Standard Plan R-40 Series.

Epoxy Coating must be Qualified Product (905.03C).

Coating must be a Qualified Product (905.03C). See Note.

Must be a Qualified Product (914.11). Do not use on Treated Wood Materials.

MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construction. * Must be tested unless provided by an Approved Manufacturer. ** When the Basis of Acceptance is not “Test”, the sampling criteria below may be used when there are concerns with material quality.

Basis of Acceptance

Sample Frequency If Required by the Engineer**

Sample Size

Maximum VI Quantity

Gen Cert

-

-

-

916.01A Cobblestone

VI

-

-

-

916.01C Riprap

VI

-

-

-

Spec. No. and Material Name 915 Bridge Coating Systems

916.02 Silt Fence 1. Fabricated Fence 2. Fabric (see 910.04)

Appr Mfr * Gen Cert

See Remark

See Remark

500 ft

NOTE: Sample to include identifying markings of fabricator. Indicate on sample ID description of markings. Note where markings were found. 916.07 Turbidity Curtain

VI

917.03 Nursery Stock

VI

-

-

-

917.04 Tree Wrapping Material

VI

-

-

-

917.05 Balling Material

VI

-

-

-

917.06A Wire for Bracing and Guying

VI

-

-

-

917.06B Hose for Bracing and Guying

VI

-

-

-

917.06C Stakes for Bracing and Guying

VI

-

-

-

917.08 Compost

VI

-

-

-

VI See Remark

-

-

-

VI See Remarks

1 per lot per shipment

1/2 lb

1100 lbs

-

-

-

917.10 Chemical Fertilizer for Grass Seed 917.12 Grass Seeding Mixtures Grass Seed Varieties 917.13 Sod

Gen Cert VI

Remarks (QPL Reference)

Must be a Qualified Product (915).

1 sample for the first 3000 ft or fraction thereof; 1 sample for each additional 10,000 ft or fraction thereof; 1 piece 8 ft long by full fence height include 2 attached posts and lath. As per 910.04 of Standard Specifications, fabric must be from the Qualified Product List (910.04).

Provide the bag label, showing the guaranteed analysis. For projects that include more than 5 acres of seeding, see Grass Seed Testing Special Provision in contract. Varieties of seed must be Qualified Product (917.12).

MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construction. * Must be tested unless provided by an Approved Manufacturer. ** When the Basis of Acceptance is not “Test”, the sampling criteria below may be used when there are concerns with material quality.

Basis of Acceptance

Sample Frequency If Required by the Engineer**

Sample Size

Maximum VI Quantity

917.13A Pegs for Sodding

VI

-

-

-

917.14 Mulching Materials for Nursery Stock

VI

-

-

-

Only shredded bark, wood chips not allowed.

Gen Cert

-

-

-

Must be a Qualified Product (917.15B 1 & 2). High velocity netting 2 sides. Standard - netting 1 side.

Gen Cert

-

-

-

Must be a Qualified Product (917.15C).

Test Data Cert

-

-

-

VI

-

-

-

Gen Cert

See Remark

6 ft, include coupling, if applicable

400 ft

1 sample for 2500 ft or fraction thereof; 2 samples over 2500 to 10,000 ft; 1 sample for each additional 10,000 ft.

Gen Cert

See Remark

6 ft sample w/ bell end incl coupling

400 ft

1 sample for 2500 ft or fraction thereof; 2 samples over 2500 to 10,000 ft; 1 sample for each additional 10,000 ft.

Gen Cert

See Remark

See Remark

400 ft

1 sample for 2500 ft or fraction thereof; 2 samples over 2500 to 10,000 ft; 1 sample for each additional 10,000 ft; 6 ft plus a separate section consisting of 2- 18 in. long pcs. connected by the joint.

Gen Cert

See Remark

6 ft sample w/ bell end incl. coupling

400 ft

1 sample for 2500 ft or fraction thereof; 2 samples over 2500 to 10,000 ft; 1 sample for each additional 10,000 ft.

918.02 Grounding System

VI

-

-

-

918.02C Grounding Rods

VI

-

-

-

Spec. No. and Material Name

917.15B1 & 2 High Velocity Mulch Blankets and Standard Mulch Blanket

917.15C Mulch Anchoring - Latex, Recycled Newsprint, Wood Fiber, Guar Gum, Other Tackifiers 917.16 Weed Control (Herbicides) 918.01 Flexible Metal Conduit 918.01A Electrical Conduit, Rigid (Galvanized Steel)

918.01B & C Electrical Conduit (Polyvinyl Chloride) Schedule 40 and 80 918.01D & E Electrical Conduit (Polyethylene/HDPE) Schedule 40 and 80

918.01F Electrical Conduit (Rigid Fiberglass)

Remarks (QPL Reference)

MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construction. * Must be tested unless provided by an Approved Manufacturer. ** When the Basis of Acceptance is not “Test”, the sampling criteria below may be used when there are concerns with material quality.

Spec. No. and Material Name 918.03 Electrical Cable

Basis of Acceptance

Sample Frequency If Required by the Engineer**

Sample Size

Maximum VI Quantity

See Note

-

-

-

Remarks (QPL Reference)

NOTE: Suitability and compliance with specifications will be determined by the agency responsible for maintaining the system. This agency shall provide the project engineer with a memo or other appropriate form indicating that the inspection (including review of Test Data Cert) has been made and that the material is acceptable. 918.06 Precast Concrete Handholes and Manholes for Electrical and Telephone Connections

Appr Mfr *

1 percent per size

-

10 pcs

918.06D Light Weight Composite Handholes

Gen Cert

-

-

-

918.08 Light Standards (Steel and Aluminum Light Standards)

Gen Cert

-

-

-

918.08C Light Standards, Frangible Transformer Bases

Gen Cert

-

-

-

Gen Cert

-

-

-

Fabrication Inspection

-

-

-

Test

1 per size

3 ft

-

Gen Cert

-

-

-

See Remark

-

-

-

General Cert must be attached and inspected at project site.

-

Test Data Cert must be attached to the Sample ID form.

Grade mark on materials serves as certification.

918.09 Luminaries 918.10A Tower Lighting Units 918.11A Guy Wire 919 Steel Sleeves for Wood Posts 919.02 Signs (Permanent) 919.02A1 Metal Sections (Extruded Aluminum)

919.02A2 Plywood 919.02A3 Aluminum Sheet

Tested Stock 1 from each 12 in. long and See Remark width in shipment full width of section Gen Cert See Remark

Tested Stock See Remark

-

-

-

See Note

Min. of 12 in. square

100 sft

Must be a Qualified Product (918.06D).

Must be a Qualified Product (918.08C).

MQAP Manual Section 4.06.

Test Data Cert must be attached to the Sample ID form.

NOTE: 2 samples per heat per Tested Stock Supplier up to 10,000 sft; 4 samples per heat per Tested Stock Supplier over 10,000 sft.

MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construction. * Must be tested unless provided by an Approved Manufacturer. ** When the Basis of Acceptance is not “Test”, the sampling criteria below may be used when there are concerns with material quality.

Sample Frequency If Required by the Engineer**

Sample Size

Gen Cert See Remark

1 per run or lot

See Remark

Gen Cert See Remark

-

-

-

919.03A Delineators 1. Plastic Reflectors

Gen Cert

1 per shipment per color

21 pcs

25 pcs each color

919.03B Delineators 2. Reflective Sheeting Reflectors

Gen Cert

1 per shipment per color

2 pcs each color

25 pcs each color

919.03D Delineator Posts 1. Steel

Gen Cert

1 per project per mfr

1 post

80 post

919.03D Delineator Posts 2. Plastic

Gen Cert

-

-

-

Test Data Cert

1 per project per mfr

See Remark

20 posts

Sample 30 in. length min. length. Posts for temporary signs may be painted.

Appr Mfr *

Each charge

22 cores

20 posts

General Cert to Construction Field Services. See 912.08.

Fabrication Inspection

-

-

-

MQAP Manual Section 4.06.

Fabrication Inspection

-

-

-

MQAP Manual Section 4.06.

Fabrication Inspection

-

-

-

MQAP Manual Section 4.06.

920.02 Glass Beads

Gen Cert

1 from each lot

2 lb

500 lbs

921.02 Span Wire

Gen Cert

1 per size

3 ft

-

See Note

-

-

-

Spec. No. and Material Name 919.02B1 Reflective Sheeting

919.02C Sign Hardware

919.04 Steel, Galvanized Sign Posts

919.05 Wood Sign Posts 919.06 Breakaway Column Sign Supports 919.07 Cantilever Sign Supports 919.08 Truss Sign Supports

921.03 Traffic Signals and Mounting Assemblies

Basis of Acceptance

Maximum VI Quantity

Remarks (QPL Reference)

1 roll, for Must be a Qualified Product less than 3 (919.02B1) 4 pcs each 12 in. in. in width square. For rolls less than 12 in. width, at least 7.5 ft. Identifying marks on items may serve as certification.

Must be a Qualified Product (919.03D).

NOTE: Compliance with specifications will be determined by the agency responsible for maintaining the system. Agency must provide the project engineer with a memo or other appropriate form indicating that the inspection has been made and the material is acceptable.

MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construction. * Must be tested unless provided by an Approved Manufacturer. ** When the Basis of Acceptance is not “Test”, the sampling criteria below may be used when there are concerns with material quality.

Basis of Acceptance

Sample Frequency If Required by the Engineer**

Sample Size

Maximum VI Quantity

Gen Cert

-

-

-

Gen Cert

-

-

-

Gen Cert

2 from each lot

Tubes

-

922.02 Temporary Traffic Control Temporary Signs

See Remark

-

-

-

922.02B Temporary Traffic Control Reflective Sheeting (Signs)

See Remark

-

-

-

922.02D Temporary Traffic Control Sign Covers

See Remark

-

-

-

922.03 Temporary Traffic Control A. Cones

See Remark

-

-

-

See MQAP Manual Section 4.10.

See Remark

-

-

-

See MQAP Manual Section 4.10.

Test Data Cert See Remark

Each project

-

-

Contractor must provide certifications and documentation confirming the TCB provided meets the requirements of subsection 922.04.A of the Standard Specifications for Construction.

See Remark

-

-

-

See MQAP Manual Section 4.10.

Gen Cert

-

-

-

Must be a Qualified Product (922.06A).

922.06A2 Temporary Traffic Control Temporary Pavement Markings; Paint

Gen Cert

-

-

-

Must be a Qualified Product (811.03D).

922.06B Temporary Traffic Control Temporary Raised Pavement Markers

Gen Cert

-

-

-

Must be a Qualified Product (922.06B).

Spec. No. and Material Name 921.05 Traffic Signal Strain Pole 921.05A Strain Pole Band Clamps 921.08B Traffic Loop Sealant

Remarks (QPL Reference)

Must be a Qualified Product (921.05A).

See MQAP Manual Section 4.10.

See MQAP Manual Section 4.10.

See MQAP Manual Section 4.10.

B. Drums 922.03E Temporary Traffic Control Type III Barricade, Reflective Sheeting 922.04 Temporary Traffic Control Temporary Concrete Barriers (TCB)

922.04A Barrier Reflector Markers Temporary and Permanent 922.06A Temporary Traffic Control Temporary Pavement Markings; Type R and NR Tape

MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construction. * Must be tested unless provided by an Approved Manufacturer. ** When the Basis of Acceptance is not “Test”, the sampling criteria below may be used when there are concerns with material quality.

Basis of Acceptance

Sample Frequency If Required by the Engineer**

Sample Size

Maximum VI Quantity

Gen Cert

-

-

-

Must be a Qualified Product (922.06C).

See Remark

-

-

-

See MQAP Manual Section 4.10.

See Remark

Each project

3 each type

-

See MQAP Manual Section 4.10.

922.07C Temporary Traffic Control Portable Changeable Message Signs

See Remark

-

-

-

See MQAP Manual Section 4.10.

922.11 Temporary Traffic Control Sign Paddles and Vests

See Remark

-

-

-

See MQAP Manual Section 4.10.

922.12A Temporary Traffic Control Dust Palliative 1. Calcium Chloride Solids

Test Data Cert

1 per project

5 lb

5000 lb

922.12A Temporary Traffic Control Dust Palliative 2. Calcium Chloride Solutions

Test Data Cert

1 per project

1 qt

1000 gal

Gen Cert

-

-

250 ft of pipe

Gen Cert

-

-

250 ft

Gen Cert

See Remark

See Remark

10 pieces

VI See Remark

-

-

-

Test

1 per 6000 ft

1 piece, 6 ft in length

600 ft

Spec. No. and Material Name 922.06C Temporary Traffic Control Pavement Marking Cover 922.07A Temporary Traffic Control Lighted Arrows; Type B and C (Solar Assist) 922.07B Temporary Traffic Control Warning Flashers and Lights; Type A, B, C

923 Watermain Materials Misc. #2 Culvert, Cast and Ductile Iron Misc. #3 Clay Pipe Misc. #5 Galvanized Slotted Drain Pipe

Misc. #7 ABS Pipe Misc. #8 Corrugated Galvanized Steel Structural Plated Misc. #9 Aluminum Alloy Structural Plates

Gen Cert

Gen Cert

1 per 100 plates 1 piece at least or fraction thereof 3 in. by 3 in. -

-

10 plates

-

Remarks (QPL Reference)

See contract documents as applicable.

See Special Instructions. MDOT approval of Design is required. Coating thickness checked at project site. If bell and spigot joint, sample from bell end.

MATERIALS ACCEPTANCE REQUIREMENTS See Miscellaneous area at the end of table for materials deleted from the 2012 Standard Specifications for Construction. * Must be tested unless provided by an Approved Manufacturer. ** When the Basis of Acceptance is not “Test”, the sampling criteria below may be used when there are concerns with material quality.

Spec. No. and Material Name Misc. #13 Pavement Warning Strips Misc. #14 Bituminized Cotton Fabric and Fiberglass Fabric

Basis of Acceptance

Sample Frequency If Required by the Engineer**

Sample Size

Maximum VI Quantity

VI

-

-

-

Gen Cert

See Remark

1 piece full width of roll, min of 3 ft

5 rolls

Remarks (QPL Reference)

1 per 100 rolls (50 sft per roll) or fraction thereof; for lots of more than 100 rolls - 1 sample plus 1 for each 500 rolls or fraction thereof. Do not sample from first 3-4 ft of roll.

********** See following pages for SPECIAL INSTRUCTIONS ***********

SPECIAL INSTRUCTIONS 712.03L Mechanical Reinfocement Splicing The contractor must make test splices, witnessed by the Engineer, on the largest bar sizes that are to be spliced. See Bridge Field Services Advisory (BFSA) 2012-03. Test splice consists of 2 pieces of reinforcing bar joined by the coupler with 12 inches of bar exposed on each end of the coupler. 901

Cement Samples of fly ash and slag cement must be accompanied by a sample of the Portland cement with which it is being used. The plastic lined cement sample bags furnished by the laboratory will hold 10 pounds when full.

904.03A Asphalt Binder for HMA Mixtures If the Asphalt Binder is supplied from a source currently on the Approved Asphalt Binder Certifier List, a certification meeting the requirements of Section 3.04.05 of the Materials Quality Assurance Procedures Manual is required. See the contract documents for sampling, acceptance, and daily monitoring requirements. If the binder is supplied from a source that is not currently shown in the Approved Asphalt Binder Certifier List, the asphalt binder must be sampled, tested, and approved for use prior to incorporation into the project. See contract documents for sampling, acceptance, and monitoring requirements. See Current List of Asphalt Binder Certifiers at Construction Field Services Web Page. Instructions to Construction Field Services web page: From MDOT home page (michigan.gov/mdot), click on about MDOT (left side), then click on Highway Field Services, and then click Construction Field Services. The Approved Asphalt Binder Certifier List is under Resources & Publications. Actual Current List of Approved Asphalt Binder Certifier web page address: http://michigan.gov/documents/AppBinderCertlist_49824_7.pdf 904.03C Emulsified Asphalt Size of Sample – For CV Sampling see Section 3.05.06 of the Materials Quality Assurance Procedures Manual. For all other sampling see contract documents for criteria. Submit the samples in plastic containers only. 905.03

Bar Reinforcement (Uncoated) Sample size must be 2 pieces, one 24 in. and one 36 in. Sample ID must include the name of the bar manufacturer, lot number, and heat number. Test Data Cert must be sent to Construction Field Services.

905.03C Bar Reinforcement (Epoxy Coated) Sample size must be 2 pieces, one 24 in. and one 36 in. Sample ID must include the name of the epoxy coating company, epoxy resin trade name, name of bar manufacturer, lot number, and heat number. Test Data Cert must be sent to Construction Field Services. Epoxy coating must be a Qualified Product (905.03C).

905.06

Welded Steel Wire Reinforcement Sample size must be one piece, full width of fabric with two transverse wires. Longitudinal wires must extend 6 in. to 8 in. either side of transverse wires. Sampling not required when larger wire is less than 0.13 in. (w1.5) in dia. Include on sample ID the size that the wires are supposed to be. Sample may be folded or cut into approx. 3 ft. sections. If cut, pieces should be wired together and identified. Test Data Cert must be sent to Construction Field Services.

905.07

Strand for Prestressed Concrete Do not obtain sample from within 5 feet of the end of the reel. Test Data Cert must be sent to Construction Field Services.

905.08

Tendons for Post Tensioning of Box Beams – Prestressing Strand Do not obtain sample from within 5 feet of the end of the reel. Test Data Cert must be sent to Construction Field Services.

906.07

High Strength Steel Bolts An assembly is typically a combination of a bolt, nut, and washer but may be any combination of a bolt, nut, washer, lock washer, etc. depending on the project specifications. Test Data Certs must identify the manufacturer of each component of the assemblies and must be attached to the sample ID.

907.04C Steel Chain Link Fence-Posts for Fence and Gates An alternative zinc/clear coat system will be allowed for pipe sections only. This alternative coating system shall comply with subsection 907.03D of the Standard Specifications for Construction. 907.04C Steel Chain Link Fence-Top Rail, Horizontal Rail An alternative zinc/clear coat system will be allowed for pipe sections only. This alternative coating system shall comply with subsection 907.03D of the Standard Specifications for Construction. 908.09A Tubing, Steel Railings (Base Plate, Angle, and Non-Tubular Post Elements) Provide a Test Data Certification document along with Sample ID. 908.09B Tubing, Steel Railings (Rail Elements and Tubular Post Elements) Provide a Test Data Certification document along with Sample ID. 908.09C Tubing, Steel Railings (Hardware) An assembly is typically a combination of a bolt, nut, and washer but may be any combination of a bolt, nut, washer, lock washer, etc. depending on the project specifications.

908.14

Anchor Bolts, Nuts, and Washers An assembly is typically a combination of a bolt, nut, and washer but may be any combination of a bolt, nut, washer, lock washer, etc. depending on the project specifications. For Type C, D, E and J cantilevers, the sampling frequency is 1 assembly per heat, per diameter, per foundation, for a max of 3 per project. Full length bolts are required for testing but if the total length is less than 20”, a second sample must be submitted for testing. Non MDOT standard plan bolts require shop drawings along with a test data cert. Stainless steel anchors bolts are not required to be tested.

908.14D Anchor Bolts and Nuts for Other Purposes A General Cert is acceptable for stainless steel anchor bolts, pedestal foundations for pedestrian signals, push buttons, controller cabinets, and Hawks signals and repeaters. Anchor bolts for all other purposes require testing. An assembly is typically a combination of a bolt, nut, and washer but may be any combination of a bolt, nut, washer, lock washer, etc. depending on the project specifications. 909.04A Reinforced Concrete Pipe 909.04B Size of Sample - Full size units for strength test. For absorption tests, 26-inch square to 81-inch square in area from the wall of each piece of pipe tested. Number of Samples - One percent of the number of pieces of each size. Reinforced concrete pipe 42-inch diameter and larger may be tested by coring. Size of core will be 4-inch nominal diameter (but not less than 3 ¼ inches actual). Up to 1 percent of the number of pieces of pipe for each size, but not less than 3 pieces, will be selected for coring. One core will be drilled and tested from each of these test pieces. Reinforcement will be inspected prior to incorporation in the pipe. Maximum for VI – 5 pieces of 42” diameter and smaller. 909.04C Nonreinforced Concrete Pipe Size of Sample - Same as reinforced concrete pipe. Number of Samples - One percent of the number of pieces, but not less than 2 pieces of each size except that at the option of the department the following sampling schedule will apply for 4 inches through 24 inches in diameter sewer pipe for quantities of 500 or more: Sampling Schedule - Per the following: Concrete Pipe 500 to 1,000 pieces 1,001 to 2,000 pieces 2,001 to 5,000 pieces Over 5,000 pieces

Number of Samples 6 8 11 2 samples per 1,000 or fraction thereof

Maximum for VI – 10 pieces. 909.05A Corrugated Steel Pipe Size of Sample - A 6-inch by 3-inch (minimum) section cut from the pipe. The sample should be taken from the end of the pipe avoiding the seams. Care should be taken to assure the coating is not damaged during sampling.

Number of Samples - Per the following: Diameter of Pipe 12 inches or less 15 inches through 54 inches 60 inches and over

Quantity Represented (maximum) 2500 ft 1000 ft 500 ft

Less than 5 percent of the quantity in the above table may be visually inspected. 909.05A1 Corrugated Galvanized Steel Sheets Size of Sample - One strip the full width of the sheet and 3 ½ inches in the direction of the length of the sheet. The strip may be cut from the end of the sheet for material coated in coils. If the sheets were individually coated after being cut to length, as indicated by heavy accumulations of zinc at one end, the sample strip shall be cut from the end opposite the heavy accumulation and after cutting 4 inches from the end of the sheet. Number of Samples - Per the following: Diameter of Pipe (max) 12 inches or less 15 through 54 inches 60 inches and over

Length of Sheet

Quantity Represented

44 inches or less 50 to 175 inches, approx* 190 inches and over*

2500 ft 1000 ft 500 ft

*Larger pipe may be made from combination of shorter sheets. Less than 5 percent of the quantity in the table above may be visually inspected. NOTE: Normally each heat and thickness is to be sampled. Exception may be made where quantities are limited and/or mixtures of heat numbers are excessive. 909.05B Corrugated Aluminum Alloy Sheets Size of Sample - A transverse strip full width of the sheet and at least 3 inches in length cut from the end of the sheet. Number of Samples - A sample shall be taken from each of 3 different sheets for lots weighing 5 tons or less, from 4 sheets for lots weighing more than 5 tons and less than 10 tons, and from 5 sheets for lots weighing 10 tons or more. 909.06

Maximum for VI – 25 sheets. Corrugated Polyethylene Pipe (Smooth Lined Type S or Corrugated Type C) Sampling Frequency - Straight Lengths, 12-inch diameter and over - 1 per 1000 ft If the manufacturer has developed a history of five consecutive passing tests over the past two years for a given diameter of pipe (12 to 24-inch), at the discretion of the MDOT testing laboratory the sampling frequency may become 1 per 2500 ft for that diameter of pipe provided the stockpile consists of pipe manufactured with a single “Plant” and “Date” code. The Tested Stockpile sampling frequency of one sample per 1000 ft of pipe (12 to 36-inch) may be re-instituted if the manufacturer experiences three failing test results for a given diameter of pipe over a one year period. Up to date information on sampling frequency may be acquired from MDOT’s Construction Field Services Division. Size of Sample - Over 12-inch diameter - one 10-ft length and one 6-ft length plus coupling

Maximum for VI - 12-inch diameter and over - 100 ft For perforated pipe wrapped in geotextile fabric, tie fabric securely in place on sample before cutting pipe sample. Do not disturb fabric after cutting. Suppliers shall provide MDOT inspector with list of date codes on pipe in stockpile to be tested prior to sampling. Each size pipe is a different material. Stockpile each pipe size separately. Preparation of 30 & 36 Inch Diameter Corrugated Polyethylene Pipe The manufacturer will be responsible for preparing the sample specimens and delivering them to the laboratory for testing. Preparation by manufacturer of each 20 foot length of pipe sample include: 1.

Cut three specimens from each length of pipe sampled, at least once the diameter in length. (For 30 in. pipe this would mean three specimens just over 30 inches in length, cuts may be made in the valley of the first corrugation beyond 30 inches, etc.)

2.

Cut 1 specimen from each length of pipe sampled at least 60 inches in length.

3.

Assemble a joint from each length of pipe sampled with approximately 6 inches of pipe protruding from each end of the joint.

4.

Mark all specimens cut from the sample length of pipe so they can be identified at the laboratory as having come from the same length of pipe.

Call the CFS- Materials Testing Laboratory in Lansing with any questions regarding the above instructions. (517-322-1217) Perforated Pipe Twelve inches in diameter and above shall be tested for acceptance on a project-byproject basis when specified by Special Provision (No Tested Stock). Soil tight sleeves shall be submitted with a pipe section 12 inches minimum length and gasket fully inserted into one end of the sleeve. A second gasket shall be supplied already installed on either the 10-ft specimen or on a separate specimen at least 12 inches in length, from the same stockpile. Single Gasket Bell and Spigot Fused Coupling System - Couplers shall be submitted as attached part of 10-ft specimen and a second piece of the specimen, minimum of 12 inches in length, with gasket installed shall be included with the sample. Each size pipe is a different material. Stockpile each pipe size separately. For perforated pipe and tubing wrapped in geotextile fabric, tie fabric securely in place on sample before cutting pipe sample. Do not disturb fabric after cutting.

910.03

Geotextiles Sampling Frequency - Obtain samples to represent the required quantity of geotextile according to the following schedule: Geotextile Blanket Liner for Riprap Separator/Stabilization Liner for Heavy Riprap

First Sample 500 to 1500 syd 500 to 1500 syd 500 to 1500 syd 500 to 1500 syd

Additional Samples 7,500 syd or less 5,000 syd or less 25,000 syd or less 4,000 syd or less

Maximum for VI - 500 syd (4500 sq ft) Size of Sample - Sample must be a minimum of 75 sft, taken across the full roll width. For rolls over 15 ft wide, sample must be a minimum of 5 ft long, taken across the full roll width. Geotextile samples submitted for testing must be identified with the lot number and/or roll number, the name of the manufacturer, and the product or style number. NOTES: Geotextiles must be unwrapped one full roll circumference prior to sampling. Geotextiles must be rolled, not folded, and shipped in a manner to prevent creases in the fabric. 914.05

Epoxy Binder, For Joint Spall Repair Normal Sampling Frequency - 1 per lot or batch number Size of Sample - For material mixed at 1:1 ratio - 2 quart, 1 quart of each component: For material mixed at 2:1 ratio - 1/2 gallon of resin and 1 quart of curing agent. Material limited to shelf life of one year from date of manufacture. Material must be labeled with date of manufacture. MAY BE “TESTED STOCK” ITEM. Maximum for VI - 5 gallons

914.07

Load Transfer Assemblies; Dowel Baskets Fabrication Inspection required per Chapter 4.07 of the Materials Quality Assurance Procedures Manual. Assemblies must meet the requirements of Standard Plan, R-40-H. All shipments of load transfer assemblies will be accompanied by proper certification documentation. -

Certification from steel (dowel bar) manufacturer. Certification from epoxy coating company. Documentation on epoxy coating. Certification from assembly manufacturer. Documentation on bond release.

When shipment is made to a project, each bundle will bear a legible tag with the following information: - Assembly manufacturer name and plant location. - Control section/project number. - Lot number or other identification that will also be shown on the accompanying certification. - Supplier and/or contractor’s name. Misc. #3 Clay Pipe Normal Sampling Frequency - One percent of the number of pieces, but not less than 2 pieces of each size except that at the option of the department the following sampling schedule will apply for 4-inch through 24-inch diameter sewer pipe for quantities of 500 or more: Sampling Schedule - Per the following: Clay Pipe 500 to 1,000 pieces 1,001 to 2,000 pieces 2,001 to 5,000 pieces Over 5,000 pieces

Number of Samples 6 8 11 2 samples per 1,000 or fraction thereof

Size of Sample - Full size units for strength test. For absorption tests, 26 inches square to 82 inches square in area from the wall of each piece of pipe tested. Maximum for VI - 10 pieces