Mar 10, 2017 ... BUILDING CODE OF THE PHILIPPINES. 3. COORDINATE THE DRAWING WITH OTHER RELATED DRAWINGS AND. SPECIFICATION. THE ARCHITECT SHALL BE NO...

255 downloads 730 Views 1MB Size
GENERAL NOTES AND SPECIFICATIONS:

5.

6. 7. 8.

9. 10. 11.

12. 13.

14.

ALL FIXTURES SHALL BE INDIVIDUALLY VENTED. THE INVERT OF THE INLET PIPE OF A SEPTIC TANK SHALL BE AT A LEVEL NOT LESS THAN 50.8mm (2") ABOVE THE INVERT OF THE OUTLET PIPE. TO PREVENT CONTAMINATION OF UNDERGROUND WATER SOURCE NO SEPTIC TANK SHALL BE CONSTRUCTED LESS THAN 1.20m ABOVE THE WATER TABLE LEVEL. ALL PIPE SIZE ARE IN MILLIMETERS AND ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE SPECIFIED. MINIMUM SEWAGE PIPE SIZE SHALL BE AS FOLLOWS: SOIL PIPE WASTE PIPE VENT PIPES DOWNSPOUT ALL PLUMBING INSTALLATION INCLUDED HEREIN SHALL BE UNDER THE DIRECT SUPERVISION OF A DULY REGISTERED AND LICENSED MASTER PLUMBER.

PLUMBING LEGEND: GATE VALVE

STORM DRAIN PIPE

CHECK VALVE

M

SHALL BE POLYPROPYLENE RANDOM (PPR) TYPE 3 PIPE, "WAVIN EKOPLLASTIK" BRAND OR APPROVED EQUAL.

VENT PIPES

SHALL BE POLYVINYL CHLORIDE (PVC) PIPE SERIES 1000, "NELTEX", "ATLANTA" BRAND OR APPROVED EQUAL..

FITTING

SHALL BE SOLVENT CEMENT JOINT TO ASTM D2564.

SEWER LINES

SHALL BE POLYVINYL CHLORIDE (PVC) PIPE SERIES 1000, "NELTEX", "ATLANTA" BRAND OR APPROVED EQUAL. FITTINGS SHALL BE SOLVENT CEMENT JOINT TO ASTM D2564.

STORM DRAINAGE LINES/ DOWNSPOUT

MATERIAL SHALL BE CONCRETE DRAIN PIPE (CDP) TONGUE @ GROOVE, MORTAR JOINTS, REINFORCED

AHU/FCU LINES

SHALL BE POLYVINYL CHLORIDE (PVC) PIPE SERIES 600 II, "NELTEX", "ATLANTA" BRAND OR APPROVED EQUAL.

FITTINGS

SHALL BE SOLVENT CEMENT JOINT TO ASTM D2564. "GREAT VOLUME"," CRANE", "KITS", OR APPROVED EQUAL.

GATE VALVES

"GREAT VOLUME","CRANE", "KITS", OR APPROVED EQUAL.

WATER METER

"ARAD", "ASAHI" BRAND OR APPROVED EQUAL.

1:50 MTS

4400 200

SV

SHOWER VALVE

CWR

COLD WATER RISER

KS LT F

KITCHEN SINK LAUNDRY TRAY FAUCET

FD

FLOOR DRAIN

HB WC

HOSE BIBB WATER CLOSET

VSTR CO SD VP WP SP MV

VENT STACK THRU ROOF CLEAN OUT SHOWER DRAIN VENT PIPE WASTE PIPE SOIL PIPE MAIN VENT

LAV

LAVATORY

VAC

VENT ABOVE CEILING

BT FB

BATH TUB FOOT BATH

FCO

FLOOR CLEANOUT

UFV

UNDER FLOOR VENT

HRP

HORIZONTAL RAINWATER PIPING CONDENSATE PIPE DOWNSPOUT ROOF DRAIN

CATCH BASIN

CP DS RD

COLD WATERLINE DS

WATERLINE LAYOUT SCALE

WATER METER

CWL

ISOMETRIC

CHECK VALVES

VENT PIPE

CB

SHALL BE POLYVINYL CHLORIDE (PVC) SERIES 1000, "ATLANTA" BRAND OR APPROVED EQUAL. FITTING SHALL BE

1800

200

900

200

900

200

200

4.

COORDINATE THE DRAWING WITH OTHER RELATED DRAWINGS AND SPECIFICATION. THE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY OF ANY DESCREPANCY FOUND THEREIN. ALL PIPES SHALL BE INSTALLED AS INDICATED ON PLANS, ANY RELOCATIONS REQUIRED FOR PROPER EXECUTION OF OTHER TRADE SHALL BE WITH PRIOR APPROVAL OF THE ARCHITECT OR ENGINEER. PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION, DEPTH AND INVERT ELEVATION OF ALL EXISTING PIPES AND STRUCTURES AS VERIFIED BY THE CONTRACTOR. ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL MAINTAIN 1% UNLESS OTHERWISE SPECIFIED. SIZE OF WATER SUPPLY PIPES TO FIXTURES SHALL BE IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT THE SITE, COORDINATE THE WORKS WITH THE SEWER LINE EFFLUENT DISPOSAL POINT AND WATER LINE SERVICE CONNECTING POINT, UNLESS OTHERWISE SPECIFIED.

COLD WATER LINE

DOWNSPOUT

WASTE PIPE

1200

3.

MATERIAL SPECIFICATIONS:

ISOMETRIC

SANITARY SEWAGE LAYOUT SCALE

200

2.

IT IS NOT INTENDED THAT THE DRAWINGS SHALL SHOW EVERY PIPE FITTING, VALVE AND APPURTENANCE. ALL SUCH ITEMS WHETHER SPECIFICALLY MENTIONED OR NOT, OR INDICATED ON THE DRAWINGS SHALL BE FURNISHED AND INSTALLED IF NECESSARY TO COMPLETE THE SYSTEM TO THE SATISFACTION OF THE OWNER. ALL PLUMBING WORKS SHALL BE INSTALLED IN ACCORDANCE WITH THE PROVISION OF THE NATIONAL PLUMBING CODE OF THE PHILIPPINES, THE REQUIREMENTS OF THE LOCAL PLUMBING INSPECTION OFFICE, PERTINENT PROVISIONS OF THE UNIFORM BUILDING CODE AND THE NATIONAL BUILDING CODE OF THE PHILIPPINES.

1600

1.

1:50 MTS

SOIL PIPE

D

E

F

A

B

C

PLAN

F

5000

5000

5000

5000

5000

5000

1

300

1

5000

7000

WATER LEVEL

AIR SPACE

AIR SPACE WATER LEVEL

WATER LEVEL

7000

1000

1550

2

14000

2

AIR SPACE

51

5000

10025

5000

E

25000

25000 5000

D

51

C

51

B

300

A

INLET COMPARTMENT 3

TERTIARY COMPARTMENT

150

3

SECONDARY COMPARTMENT

SECTION

SANITARY SEWAGE LAYOUT SCALE

1 : 200

Prepared by:

SEPTIC TANK DETAILS

WATERLINE LAYOUT

M

SCALE

Checked by:

Approved by:

1 : 200

SCALE

M

PROJECT NAME :

1:20 MTS

Sheet Content:

Revisions:

Sheet No.:

DRAWN BY:

JMG

CHECKED BY:

CFQ/JCC

DATE DRAWN:

2016

DATE PRINTED:

2016

Total Sheet No.:

DATE APPROVED:

2016

09 / 10

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS PROJECT DEVELOPMENT SERVICE

MATI AIRPORT DEVELOPMENT PROJECT (C.Y. 2015) JULIUS C. CARLOS Engineer IV, Project Development Service

PROJECT SCOPE: REHABILITATION OF EXISTING TERMINAL BUILDING

UNIT 83, THE COLUMBIA TOWER, BRGY. WACK WACK, ORTIGAS AVENUE, MANDALUYONG CITY 1555

LOCATION

The copyright of this drawing remains the property of the Department of Transportation and Communications whose permission must be obtained before any use of it can be made.

:

MATI, DAVAO ORIENTAL

SCALE

:

AS SHOWN

P-1 1

1

A

B

C

D

E

A

F

B

C

5000

E

F

25000

25000 5000

D

5000

5000

5000

5000

5000

5000

5000

5000

5000 4300 4400

1

2

7000

2

14000

7000

1

3

3

PROPOSED

PROPOSED

FOUNDATION PLAN SCALE

N

SCALE

1 : 150

M

BEAM 1 DETAIL

FOUNDATION PLAN

FOUNDATION SECTION

SCALE

SCALE

SCALE

SCALE

1 : 10

M

1 : 10

M

Checked / Submitted by:

1 : 20

M

1 : 20

M

Approved by:

N N

A

O

A

SP

ROOF BEAM PLAN

M

COLUMN 1 DETAIL

Prepared by: RTAT I O

1 : 150

IC

AT

TM

EN

CO M M U N

T O F TR

D

Republic of the Philippines

DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS

JULIUS C. CARLOS

DEO LEO N. MANALO

Office of the Director Project Development Service

Engineer IV, Project Development Service

Director, Project Development Service

IO

N S DE PA

R

The Columbia Tower, Ortigas Ave., Mandaluyong City, Metro Manila

The copyright of this drawing remains the property of the Department of Transportation and Communications whose permission must be obtained before any use of it can be made

S- 1

DAHICAN AIRPORT DEVELOPMENT PROJECT (C.Y. 2015) * AS SHOWN *

01 03

REHABILITATION OF EXISTING TERMINAL BUILDING

06 / 10

TRUSS 2 DETAIL SCALE

TRUSS 1 DETAIL SCALE

1 : 50

1 : 50

TRUSS 4 DETAIL

M

SCALE

Prepared by: N

Checked / Submitted by:

1 : 50

M

TRUSS 5 DETAIL SCALE

1 : 50

M

TRUSS 6 DETAIL SCALE

1 : 50

M

Approved by:

N N

A

O

A

SP

RTAT I O

M

M

TRUSS 3 DETAIL SCALE

1 : 50

IC

AT

TM

EN

CO M M U N

T O F TR

D

Republic of the Philippines

DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS

JULIUS C. CARLOS

DEO LEO N. MANALO

Office of the Director Project Development Service

Engineer IV, Project Development Service

Director, Project Development Service

IO

N S DE PA

R

The Columbia Tower, Ortigas Ave., Mandaluyong City, Metro Manila

The copyright of this drawing remains the property of the Department of Transportation and Communications whose permission must be obtained before any use of it can be made

S- 2

DAHICAN AIRPORT DEVELOPMENT PROJECT (C.Y. 2015) * AS SHOWN *

02 03

REHABILITATION OF EXISTING TERMINAL BUILDING

07 / 10

NOTE: REINFORCING BAR FOR SLAB OPENING OPENING SIZE

VERTICAL & HORIZONTAL

UNDER 600 UNDER 800

Prepared by: N

Checked / Submitted by:

Approved by:

N N

A

O

A

SP

RTAT I O

IC

AT

TM

EN

CO M M U N

T O F TR

D

Republic of the Philippines

DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS

JULIUS C. CARLOS

DEO LEO N. MANALO

Office of the Director Project Development Service

Engineer IV, Project Development Service

Director, Project Development Service

IO

N S DE PA

R

The Columbia Tower, Ortigas Ave., Mandaluyong City, Metro Manila

The copyright of this drawing remains the property of the Department of Transportation and Communications whose permission must be obtained before any use of it can be made

S-3

DAHICAN AIRPORT DEVELOPMENT PROJECT (C.Y. 2015) * AS SHOWN *

03 03

REHABILITATION OF EXISTING TERMINAL BUILDING

09 / 10