TUNNEL CONSTRUCTION IN INDIA - India Infrastructure, Power

TUNNEL CONSTRUCTION IN INDIA Mission zGrowth in the Indian tunnel market is expected to accelerate in the next few years. Around 950 km of tunnel leng...

24 downloads 949 Views 110KB Size
7th Annual Conference on

TUNNEL CONSTRUCTION IN INDIA

Risks and Challenges, Technologies and Solutions May 17-118, 2016, Grand Hyatt, Mumbai

“Early Bird” discount ends on April 26, 2016 “Register Now” and save 20 per cent

Organisers:

Lead Sponsor*:

Co-sponsor*:

*Lead and Co-sponsorship slots are available

TUNNEL CONSTRUCTION IN INDIA Mission z

Growth in the Indian tunnel market is expected to accelerate in the next few years. Around 950 km of tunnel length is already under construction. Another 2,500 km is under various stages of planning.

z

The government’s focus on infrastructure development is a key driver. Metro projects have been announced in 10 new cities. Heavy investments are planned for construction of all-weather roads and new tunnels in strategic and sensitive areas. The Borders Road Organisation is targeting 20-25 new tunnels over the next few years. The railway capex target for 2016-17 is at an all-time high at Rs 1.2 trillion. Hydro power capacity is expected to increase by 7-8 GW in the next five to six years.

z

The sector has seen significant developments in 2015. Important tunnel works for the Jammu-Udhampur, Rohtang Pass, and Jaipur Metro projects have been completed. New tunnel works for the Jiribam-Tupul-Imphal, Mualkhang-Sairang and Chennai Metro projects have been awarded. Many landmark projects such as the Chennai-Nashri Tunnel, AMR Tunnel and Katra-Qazigund Tunnel are progressing.

z

Record-length tunnels are being completed and planned. The longest rail tunnel at Pir Panjal was made operational. The 85 km Godavari Lift Irrigation is under construction. The 33.5 km Mumbai Metro Line 3 is a completely underground corridor. The scope of tunnel projects is also expanding. An underwater tunnel is being planned through the Krishna river in Andhra Pradesh. Tunnelling in underground storage caverns is emerging as a new area of growth.

z

Tunnelling methods and techniques are evolving from non-mechanised to mechanised. Micro-tunnelling is an up-and-coming technology suitable for smaller diameters. TBMs are no longer limited to metro tunnels. Water supply and irrigation tunnels are frequently using TBMs, while hydro tunnels have started experimenting with them. The New Austrian Tunnelling Method (NATM) is also gaining traction across sectors.

z

Meanwhile, the biggest challenge for the sector is geological surprises. Lack of engineering skills, inadequate risk assessment, contractual disputes and safety are other areas of concern.

z

Going forward, India will remain the biggest single market in the world for underground construction projects. A strong pipeline of projects will provide a vast pool of opportunities for EPC contractors and consultants. This will also drive the market for tunnelling equipment.

z

The mission of this conference is to highlight the opportunities in tunnelling, examine the key challenges, and discuss key solutions. The conference will showcase noteworthy projects, best practices and latest technologies. It will also offer a platform to share experiences and discuss new techniques and ideas.

Target Audience The conference is targeted at: - MRTS project developers

- Communication and security equipment suppliers

- Pollution control and ventilation equipment manufacturers

- Equipment providers

- Indian Railways

- Tunnel design and construction organisations

- Hydro power generators

- Consultancy and design service providers

- Civil contractors

- Fire protection and safety system providers

- Road developers

- Technology providers

- Water and sewerage system developers

- Urban local bodies and relevant government agencies - Other service providers, etc.

Previous Participants The organisations that have participated in our previous conferences on “Tunnel Construction in India” include Aarvee Associates, Adcos, AECOM, AF Colenco, Afcons, Aker, Aldesa, Amberg, Ambuja Cements, Atkins, Atlas Copco, Bajaj Allianz, Bangalore Metro Rail Corporation, Bekaert, Border Roads Organisation, Caterpillar India, CBIP, CH2M Hill, Chicago Pneumatic Construction Equipment, CH2M Hill, Chennai Metro Rail, CMRL, COWI, Dassault, DFCCIL, Delhi Jal Board, Dextra India, Draeger Safety India, DRDO, DSI Bridgecon, Duraflex, Egis, ES Ein Shemer Rubber, Essar Power, Essel Infraprojects, Eurostar Engineering, FOGTEC Brandschutz GmbH, Gammon, Gates India, Geoconsult, Geo Constech, Geodata, Giertsen Tunnel, GMR, GMW, GR Infraprojects, GVK Group, Halfen, HCC, Herrenknecht, Hitachi Zosen, HPPCL, Hochtief, HPRIDC, IL&FS Transportation Networks, ITNL, Ircon International, Isolux Corsan, ITD Cementation, ITNL, J&K SPDC, Jal India, Jindal power, Jindal Steel, JSW Infrastructure, Kalpan Hydro, Kameng Dam Hydro Power, KECInternational, Kolkata Metro Rail Corporation, Kross Air Distribution Systems, Konkan Railway Corporation, Krishna Hydro Projects, KSK Dibbin Hydro Power, Kutch Railways, Larsen & Toubro, Lahmeyer, Lanco, Leighton, L&T, Lombardi, Louis Berger, Marti India, MBL Infrastructures, MC Bauchemie, Mekaster, Mitsui, Monnet Projects, Mumbai Rail Vikas Corporation, Muncipal Corporation of Greater Mumbai, Nagarjuna Construction Company, Newkem, NHAI, NHPC, Nina Concrete, Normet, North East Frontier Railway, Northern Railway Construction, NTPC, OBO Betterman, Outokompu, Patel Engineering, Pratibha Industries, Precision Drawell, Promat India, Punj Lloyd, PWD, Rail Vikas Nigam, Railway Board, Ramboll, RDSO, Reinforced Earth India, Renesco, RITES, Robbins, RVNL, Sammon InfracorpSandvik, Savronik Sistem, SERING Ingegneria, SEW Infrastructure, Sika India, Simplex Infrastructure, SJVN, SMC India, SMEC, SMS Infrastructure, SNC Lavalin Engineering, Spectrum, Stanley Black & Decker India, Star Drilling, Sterling Wilson, Systemair India, Systra MVA Consulting, TAM Construction Chemicals, TCE, Telcon, Telegra DOO, Terratec, THDC, Tata Power, TNEB, Totem Infra, Transstroy India, TROX India, Tvastar Engineering, Uniquest Infra, Unity Infraprojects, Vayam Technologies, Vijay Nirman Company, Vinci, Wapcos, Welspun, etc.

To register: Call +91-111-441034615, +91-99971992998, email: [email protected], or visit us at www.indiainfrastructure.com

May 17-118, 2016, Grand Hyatt, Mumbai AGENDA/STRUCTURE KEY TRENDS AND OUTLOOK

SPOTLIGHT ON EQUIPMENT

™ What is the current status of tunnelling in India?

™ What is the key equipment required for tunnel construction?

™ What are the recent trends and developments across sectors?

™ What is the cost economics of using expensive high-tech tunnelling equipment?

™ What are the key issues and challenges? What is the future outlook?

™ What are the major gaps as far as specialised tunnelling equipment are concerned?

What are the latest technology interventions?

FOCUS ON TBM ™ What is the current state of TBM deployment in India? What are the refurbishment and

FOCUS ON NATM AND DRILL & BLAST

buyback options? ™ What are the complexities in TBM designs? ™ What are the global advances in TBMs? What are the key challenges?

™ What has been the experience so far with drill and blast and NATM in tunnelling projects?

SPOTLIGHT ON MICRO-TTUNNELLING

™ What are the selection criteria for the most appropriate methods/techniques? ™ What are the key issues and challenges? How can they be addressed?

METRO TUNNELS: PROJECT AND TECHNOLOGY SHOWCASE

™ What is the current state of micro-tunnelling in India?

™ What has been the experience with metro tunnel construction? What are the key trends?

™ In which situations is it most appropriate to deploy a micro-TBM?

™ What are the most prevalent techniques and methods for tunnelling?

™ What are the global advances?

™ What are some of the noteworthy projects?

™ What are the key issues and challenges?

™ What are the key challenges? What are the key learnings?

GEOTECHNICAL INVESTIGATIONS ™ What are the geotechnical investigation requirements for tunnel projects? How do they

impact the choice of tunnelling technique/method?

HYDRO TUNNELS: PROJECT AND TECHNOLOGY SHOWCASE ™ What has been the experience with hydro tunnel construction? What are the key trends? ™ What are the most prevalent techniques and methods for tunnelling?

™ What are the instrumentation and monitoring tools?

™ What are some of the noteworthy projects?

™ What are the key challenges? How can they be addressed?

™ What are the key challenges? What are the key learnings?

TUNNEL DESIGN AND ENGINEERING

RAIL TUNNELS: PROJECT AND TECHNOLOGY SHOWCASE

™ What are the best practices followed for tunnel design in India?

™ What has been the experience with rail tunnel construction? What are the key trends?

™ What are the key design elements – civil, structural, geotechnical, mechanical and

™ What are the most prevalent techniques and methods for tunnelling?

electrical? ™ What are the emerging global trends? Which designs are the most relevant in the Indian scenario?

™ What are some of the noteworthy projects? ™ What are the key challenges? What are the key learnings?

ROAD TUNNELS: PROJECT AND TECHNOLOGY SHOWCASE CONSTRUCTION RISKS AND CHALLENGES

™ What has been the experience with road tunnel construction? What are the key trends?

™ What are the key risks and challenges for tunnel construction?

™ What are the most prevalent techniques and methods for tunnelling?

™ What are the methods and techniques used to address them?

™ What are some of the noteworthy projects?

™ What are the global best practices?

™ What are the key challenges? What are the key learnings?

™ What are the key learnings for Indian companies?

WATER AND SEWAGE TUNNELS: PROJECT AND TECHNOLOGY SHOWCASE TECHNOLOGY SHOWCASE: SAFETY AND SECURITY ™ What are the best practices for safety and security in tunnel operations?

™ What has been the experience with water and sewage tunnel construction? What are the

key trends?

™ What has been the experience so far in India?

™ What are the most prevalent techniques and methods for tunnelling?

™ What are the technology advances in safety and security systems?

™ What are some of the noteworthy tunnel projects? ™ What are the key challenges? What are the key learnings?

COMPLEXITIES IN HIMALAYAN REGION ™ What has been the tunnelling experience in the Himalayan region?

FOCUS ON UNDERGROUND STORAGE CAVERNS

™ What are the various risks and complexities?

™ What has been the tunnelling experience with underground storage caverns?

™ How can modern tunnel construction technologies help in managing such complexities?

™ What are the methods and techniques deployed? ™ What are the key issues and challenges? How can they be addressed?

Delegate Fee z The delegate fee is Rs 22,500 for one participant, Rs 37,500 for two, Rs 52,500 for three and Rs 67,500 for four. There is also a 20 per cent "early bird"

discount for those registering before April 26, 2016. z There is a special low fee of Rs 5,000 per participant for state-owned hydro power producers, PWDs, ULBs, Indian Railways, metro rail corporations, research organisations and academic institutions. z A service tax of 14.5 per cent is applicable on the registration fee.

To register: Call +91-111-441034615, +91-99971992998, email: [email protected], or visit us at www.indiainfrastructure.com

7th Annual Conference on

TUNNEL CONSTRUCTION IN INDIA Risks and Challenges, Technologies and Solutions May 17-18, 2016, Grand Hyatt, Mumbai Registration Form I would like to register for the conference. I am enclosing Rs_______________________________vide cheque/demand draft no.___________________ drawn on __________________________dated ___________________ in favour of India Infrastructure Publishing Pvt. Ltd. payable at New Delhi. Please send wire transfer payments to: Beneficiary

India Infrastructure Publishing Private Limited

Bank Account No.

094179587002

Bank Name

The Hongkong and Shanghai Banking Corporation Ltd

Swift Code

HSBCINBB

IFSC Code

HSBC0110006

Bank Address R-47, Greater Kailash-1, New Delhi-110048, India

Sponsorship opportunities are available

Name(s)/Designation (IN BLOCK LETTERS) Company Mailing Address

Phone

Mobile

Fax Email

Registration Fee One delegate

Organisers

“Early Bird” discount price before April 26 Rs 20,610 or $375

Price after April 26 Rs 25,763 or $470

Two delegates

Rs 34,350 or $625

Rs 42,938 or $780

Three delegates

Rs 48,090 or $875

Rs 60,113 or $1,095

Four delegates

Rs 61,830 or $1,125

Rs 77,288 or $1,405

Note: All prices are inclusive of 14.5 per cent service tax. z z

z z z

There is a 20 per cent “early bird” discount for those registering before April 26, 2016. There is a special low fee of Rs 5,000 per participant for state-owned hydro power producers, PWDs, ULBs, Indian Railways, metro rail corporations, research organisations and academic institutions. A service tax of 14.5% is applicable on the registration fee. To register online, please log on to http://indiainfrastructure.com/conf.html Registration will be confirmed on receipt of the payment.

The conference is being organised by India Infrastructure Publishing, the leading provider of information on the infrastructure sectors through magazines, newsletters, reports and conferences. The company publishes Power Line and Indian Infrastructure magazines and a series of reports including Tunneling in India, Urban Rail, Road Development in India, Railways in India, Municipal Water Sector and Hydro Power Projects in India.

Payment Policy: z z z

Full payment must be received prior to the conference. Payments for “early bird” registrations should come in before the last date of discount. Conference fees cannot be substituted for any other product or service being extended by India Infrastructure Publishing Pvt. Ltd. Conference fee includes lunch, tea/coffee and conference material.

For delegate registrations, contact: Richa Jhamnani Tel: +91-111-441034615, +91-99971992998

For sponsorship opportunities, contact: Varun T. Boyle Tel: +91-111-441034610, 41034615, +91-99999430521

Conference Cell, India Infrastructure Publishing Pvt. Ltd., B-117, Qutab Institutional Area, New Delhi 110016. Fax: +91-111-226531196, 46038149. E-m mail: [email protected]

Cover pic courtesy: shutterstock images

Delegates