Annexure-I Land Ownership Documents - Environment Clearance

OISD-STD-114. Safe Handling of Hazardous Chemicals Oct-10. 7. OISD-GDN- 115. Guidelines on Fire Fighting Equipment and Appliances in Petroleum Industr...

31 downloads 635 Views 10MB Size
Annexure-I Land Ownership Documents

Annexure-II Revenue Department- Khasara No.

Annexure-III NOC for CRZ

Annexure-IV EC Letter

Annexure-V ToR Letter

Annexure-VI Compliance of EC

Annexure-VII Fire Hydrant Layout

Annexure-VIII Drain Layout

KEY PLAN

D

D

GENERAL NOTES:-

GROUND WATER RECHARGE WELL

SECTION D-D

TYP. DETAILS OF DRAIN

CIVIL WORKS REQUIREMENTS

TYP. DETAILS OF VAPOUR TRAP

LEGEND:-

INDIAN OIL CORPORATION LIMITED EPCM SERVICES FOR LPG IMPORT TERMINAL, PARADIP, ODISHA LPG IMPORT TERMINAL ROAD AND DRAIN LAYOUT WITH RAIN WATER HARVESTING SYSTEM

Annexure-IX Animated Computer Model

Animated Computer Model

Annexure-X OISD Standard

OISD STANDARDS FOR MOUNDED AND BULLET STORAGE FACILITY

Sr.

OISD Standard/GDN/RP

No.

No

EDITION

STANDARD NAME

ON April 2016

1

OISD-STD-105

Work Permit System

Sep-04

2

OISD-STD-106

Pressure Relief & Disposal System

Oct-10

3

OISD-RP-110

4

OISD-STD-112

Recommended

Handling

OISD-STD-113

on

Static

of

Air

Hydrocarbon

Mixtures & Pyrophoric Substances Classification

5

Practices

Electricity Safe

of

Area

for

Aug-99

Oct-02

Electrical

Installations at Hydrocarbon Processing Oct-13 & Handling Facilities

6

OISD-STD-114

7

OISD-GDN-115

8

OISD-STD-116

9

OISD-STD-118

10

OISD-STD-119

11

OISD-STD-120

Safe Handling of Hazardous Chemicals Guidelines on Fire Fighting Equipment and Appliances in Petroleum Industry Fire Protection Facilities for Petroleum Refineries and Oil/Gas Processing Plants Layouts for Oil and Gas Installations Selection, Operation and Maintenance of Pumps Selection, Operation and Maintenance of Compressors

Oct-10 Jul-00

Jul-12 Jul-08 Jul-08

Jul-08

Selection, Operation and Maintenance of 12

OISD-RP-122

Fans, Blowers, Gear Boxes, Agitators & Jul-08 Mixers

13

OISD-RP-123

AS

Selection, Operation and Maintenance of Rotary Equipment Components

Jul-08

14

OISD-RP-124

Predictive Maintenance Practices

Aug-07

15

OISD-STD-125

16

OISD-RP-126

17

OISD-STD-127

18

OISD-STD-128

Inspection of Unfired Pressure Vessels

Oct-10

19

OISD-STD-129

Inspection of Storage Tanks

Nov-06

20

OISD-STD-130

Inspection of Piping Systems

Jul-08

21

OISD-STD-131

Inspection of Boilers

Aug-99

22

OISD-STD-132

Inspection of Pressure Relieving devices

Jul-12

23

OISD-STD-135

24

OISD-STD-137

25

OISD-STD-142

26

OISD-STD-144

27

OISD-GDN-145

28

OISD-RP-146

29

OISD-RP-147

30

OISD-RP-148

31

OISD-RP-149

Inspection & Maintenance of Mechanical Seals Specific practices for installations and maintenance of Rotating Equipment Selection,

Operation,

Inspection

&

Maintenance of Diesel Engines

Inspection of Loading & Unloading hoses for Petroleum Products Inspection of Electrical Equipment

systems Petroleum

Gas

(LPG)

Installations Guidelines on Internal Safety Audits (Procedures and Checklist) Preservation of idle electrical equipment Inspection

&

safe

practices

during

practices

during

electrical installations Inspection

&

safe

overhauling electrical equipment Design aspects for safety in electrical systems

Aug-07

Oct-10

Sep-01 April-16

Inspection of fire fighting equipments and

Liquefied

Aug-07

Feb-96

Jul-08

Sep-01 Aug-00 Oct-02

Aug-00

Oct-13

Design and Safety Requirements For 32

OISD-STD-150

Liquefied

Petroleum

Gas

Mounded Jul-08

Storage Facility Safety in Design, Fabrication and Fittings

33

OISD-STD-151

34

OISD-STD-152

35

OISD-STD-153

36

OISD-STD-154

Safety aspects in Functional Training

Sep-01

37

OISD-STD-155 (Part I)

(Part-I Non Respiratory Equipment)

Oct-10

38

OISD-STD-155 (Part II)

(Part II Respiratory Equipment)

Jul-95

39

OISD-STD-156

: Propane Tank Trucks Safety

Instrumentation

OISD-RP-157

Process

System in Hydrocarbon Industry Maintenance

&

inspection

of

safety

instrumentation in hydrocarbon industry

Fire

Protection

Facilities

for

Ports

Handling Hydrocarbons Recommended

40

for

Transportation

Practice of

Bulk

Jul-99

Oct-10

Jan -15

Oct-05

for Petroleum Sep-96

Products Recommended Practices on Storage and 41

OISD-RP-158

Handling of Bulk Liquefied Petroleum Aug-00 Gas

42

OISD-STD-159

43

OISD-STD-160

44

OISD-GDN-161

45

OISD-STD-162

46

OISD-STD-163

LPG Tank Trucks - Requirements of Safety on Design/Fabrication & Fittings Protection to fittings mounted on existing LPG tank trucks LPG Tank Truck Incidents : Rescue & Relief Operations Safety in installation and maintenance of LPG Cylinders Manifold Process Control Room Safety

Oct-02

Aug-93

Mar-03

Jul-95 Sep-04

47

OISD-STD-164

48

OISD-GDN-165

49

OISD-GDN-166

50

OISD-RP-167

51

OISD-GDN-168

Fire

Proofing

of

Steel

Supporting

Structures in Oil & Gas Industry Guidelines

for

Rescue

&

Relief

Operations for POL Tank Truck Accident Guidelines

for

Occupational

Health

Monitoring in Oil and Gas Industry POL Tank lorry Design & Safety Emergency

Preparedness

Plan

Jul-12

Jul-99

Jul-12 Jul-97

for

Marketing Locations of Oil Industry

Jul-97

OISD Guidelines on Small LPG Bottling 52

OISD-GDN-169

Plants

(Design

and

Fire

Protection Jul-08

facilities) Inspection, 53

OISD-STD-170

Maintenance,

Rehabilitation

of

Repairs

Foundations

& & Jul-97

Structures Preservation of Idle Static & Rotary

54

OISD-STD-171

55

OISD-STD-173

56

OISD-STD-177

57

OISD-GDN-178

Guidelines on Management Of Change

Jul-99

58

OISD-GDN-180

Lightning Protection

Jul-99

Mechanical Equipment Fire Prevention and Protection System for Electrical Installations Inspection & Maintenance of Thermal Insulation

Jul-98

Sep-03

Jun-98

Standard on Replacement of Personal 59

OISD-STD-184

Protective Equipment & Life Saving Aug-00 Appliances

60

OISD-STD-185

Wire Line Operations

Oct-02

61

OISD-GDN-186

Simultaneous Operations in E&P Industry 2008

62

OISD-STD-188

Corrosion Monitoring Of Offshore & Aug-00

Onshore Pipelines 63

OISD-GDN-192

Safety Practices during Construction

April-16

Safety in Design, Operation, Inspection 64

OISD-STD-195

and Maintenance of Hydrocarbon Gas Sep-01 Compressor Stations and Terminals Guidelines for Seeking Environmental

65

OISD-GDN-196

Clearance of Development Projects in Sep-01 Petroleum Industry

66

OISD-GDN-197

67

OISD-GDN-203

68

OISD-GDN-206

69

OISD-GDN-207

70

OISD-STD-210

71

OISD-GDN-211

72

OISD-GDN-212

73

OISD-GDN-224

74

OISD-GDN-227

Guidelines

for

Environmental

Impact

Assessment Operation, Maintenance & Inspection Of Hoisting Equipment Guidelines

on

Safety

Management

System in Petroleum Industry Contractor Safety

Sep-01

Sep-03

Sep-01 April-16

Storage, Handling and Refueling of LPG for automotive use Safety in Petroleum Laboratories

Oct-10 Sep-03

Guidelines on Environmental Audit in Downstream Petroleum Sector Monitoring & Control of Volatile Organic Compounds Emission Emergency Response and Preparedness in E&P Industry

Oct-02

Nov-06

Aug-07

Selection, Training & Placement of Fire 75

OISD-GDN-228

Operators

in

Hydrocarbon

& Jul-08

Petrochemical Industry 76

OISD-GDN-232

Identification of hazards and control measures in E&P industry

Oct-13

Design, 77

OISD-STD-236

Layout,

Maintenance Storage

of

Operation Refrigerated

& LPG Jan-15

Annexure-XI CTO with Compliance

COMPLIANCE REPORT OF CTO Sr.

CTO Conditions

Compliance Status

No. 1

Consent to operate is hereby granted under section 25/26 of Water (prevention & Control of Pollution)

Noted

Act, 1974 and under section 21 of Air (Prevention & Control of Pollution) Act, 1981 and rules framed thereunder to Name of the Industry: M/s LPG Marketing Terminal , Indian Oil Corporation Ltd. Name of the Occupier & Designation: Sri Somanath Das, Manager Address: At-Bhittargarh, Po-Atharabanki, Paradip, Dist-Jagatsinghpur, Odisha 2

This consent order is valid for the period up to 31 -03-2016

Noted

3

This consent order is valid for the product quantity, specified outlets, discharge quantity and quality,

Noted

specified chimney/stack, emission quantity and quality of emissions as specified below. This consent is granted subject to the general and special conditions stipulated therein. A

Details of Receipt & Storage of POL:

SL. 1.

Product Storage, Handling and Loading LPG in Tankers

Noted

Capacity 6,00,000 MTPA

B

Discharge permitted through the following outlet subject to the standard: Outlet

Description

Point of

Qty of

No.

of outlet

discharge discharge

Prescribed standard pH

KLD 01.

Domestic

Used for

effluent at

gardening

12

Noted

SS

BOD

O&G

(mg/L)

(mg/L)

(mg/L)

5.5-9.0

100

30

10

outlet of STP C

Emission permitted through the following stack subject to the prescribed standard: Chimney

Stack

Stack ht , Qty of

stack

attached

(m)

emission

No.

to

above

(m3/Hr)

Prescribed standard

DG set

HC (g)

NOx(g)

(mg/Nm3)

KW-hr

KW9.2- KW-hr 3.5hr

5.50

-

0.3

1.3 g/kw-

750KVA 02.

DG set

CO(g)

PM

roof 01.

Noted

9.2

3.5

9.2

3.5

hr 4.00

-

0.3

1.3

320KVA D

Disposal of solid waste permitted in the following manner : SL

Noted

Type of

Qty

Qty to be

Qty to be

Qty

Description of

solid waste

generated

reused on

reused

disposed

disposal site

(TPA)

site(TPA)

off

off(TPA)

site(TPA) 01.

Canteen waste

9.00

-

-

-

Vermincomposting,

manure used for gardening 02.

Sludge from

0.30

-

-

-

Land-filling

0.65

-

-

-

Gardening as

settling tank 03.`

STP Sludge

manure E

GENERAL CONDITIONS FOR ALL UNITS

1

The consent is given by the board in consideration of the particulars given in the application. Any

Noted

change or alteration or deviation made in actual practice from the particulars furnished in the application will also be the ground liable for review/variation/revocation of the consent order u/s 27 of the Act of Water (Prevention & Control of Pollution) act 1974 & section 21 of Air (Prevention & Control of Pollution) Act 1981 & to make such variations as deemed fit for the purpose of the Acts. 2

The industry would immediately submit revised application for consent to operate to this board in the

Noted

event of any change in the quantity & quality of raw material / and products / manufacturing process or quantity / quality of the effluent rate of emission / air pollution control equipment / system etc 3

The applicant shall not change or alter the quantity or quality or the rate of discharge or temperature or

Noted

the route of discharge without the previous written permission of the Board. 4

The applicant shall comply with & carry out the directives/orders issued by the board in this consent

Complied as directed.

order & at all subsequent times without any negligence on his part. In case of non-compliance of any order/directives issued at any time &/or violation of the terms & conditions of this consent order , the applicant shall be liable for legal action as per the provisions of the Law/Act 5

The applicant shall make an application for grant of fresh consent at-least 90days before the date of

Consent order: 2810

expiry of this consent order.

dated: 30.5.15 was valid till 31.03.2016. On 11.2.16 renewal of

CTO submitted manually to OSPCB & again online application: 749603 dated: 10.6.16 resubmitted for renewal from 01.4.16 till 31.3.2020(5 yrs). 6

The Issuance of this consent does not convey any property light in either real or personal property or

Noted

any exclusive privileges nor does It authorize any injury to private property or any invasion of personal rights. nor any Infringement of Central, State laws or regulation 7

This consent does not authorize or approve the construction of any physical structure or facilities or the

Noted

undertaking of any work in any natural water course 8

The applicant shall display this consent granted to him in a prominent place for perusal of the public &

Displayed prominently.

inspecting officers of this Board. 9

An inspection book shall be opened & made available to Board’s officers during the visit to the Factory.

Noted

10

The applicant shall furnish to the visiting officer of the Board any information regarding the construction,

Noted

installation or operation of the plant or of effluent treatment system / air pollution control system / stack monitoring system any other particulars as may be pertinent to preventing and controlling pollution of Water I Air. 11

Meters must be affixed at the entrance of the water supply connection so that such meters are easily

Meters fixed on the

accessible for inspection & maintenance & for other purposes of the Act provided that the place where it

delivery side of bore wells

is fixed shall in no case be at a point before which water has been tapped by the consumer for

piping, before tapping.

utilization for any purposes whatsoever.

12

Separate meters with necessary pipeline for assessing the qty of water used for each of the purposes mentioned below :

1. Cooling water for LPG pump seal

(a) Industrial cooling, spray in mine pits or boiler feed.

flows in a closed

(b) Domestic purpose

circuit.

(c) Process

2. There are no mine pits & boilers. 3. Water mainly used for domestic purpose & fire fighting (in case situation arises).

13

The applicant shall display suitable caution board at the place where the effluent is entering into any

No trade effluent is

water body or any other place to be indicated by the board, indicating therein that the area into which

generated.

the effluents are being discharged is not fit for the domestic use / bathing 14

Storm water shall not be allowed to mix with the trade & / or domestic effluent on the upstream of the

Storm water & domestic

terminal manholes where the flow measuring devices will be installed.

effluent are two separate streams. No mixing anywhere.

15

The applicant shall maintain good house-keeping both within the factory & the premises. All pipes,

Good House-keeping

valves, sewers & drains shall be leak proof. Floor washing shall be admitted into the effluent collection

being maintained.

system only & shall not be allowed to find their way in storm drains or open areas.

Water from TLF & LPG PH sheds are directed to vapor traps & not allowed entry to storm drains.

16

The applicant shall at all times maintain in good working order & operate as efficiently as possible all

Noted, The two nos. of

treatment or control facilities or systems installed or used by him to achieve with the terms & conditions

STP”s capacity 6.5m3/day

of the consent.

& 4.5m3/day each being maintained.

17

Care should be taken to keep the anaerobic lagoons, if any, biologically active & not utilized as mere

No anaerobic Lagoons

stagnation ponds. The anaerobic lagoons should be fed with the required nutrients for effective

available in the premises.

digestion. Lagoons should be constructed with sides & bottom made impervious. 18

The utilization of treated effluent on factory’s own Land, if any, should be completed & there should be

Domestic effluent from

no possibility of the effluent gaining access into any drainage channel or other water courses either

canteen, office buildings &

directly or by overflow.

toilets/urinals are sent to STP directly. No industrial effluent generated.

19 20

The effluent disposal on land, if any, should be done without creating any nuisance o the surroundings

No industrial effluent

or inundation of the lands at any time.

generated.

If at any time the disposal of treated effluent on land becomes incomplete or unsatisfactory or create

No industrial effluent

any problems or becomes a matter of dispute, the industry must adopt alternate satisfactory treatment

generated.

& disposal measures. 21

The sludge from treatment units shall be dried in sludge drying beds & the drained liquid shall be taken

The dried sludge from

to equalization tank.

STP beds is used for the purpose of gardening.

22 23

The effluent treatment units & disposal measures shall become operative at the time of commencement

No industrial effluent

of production.

generated.

The application shall provide port holes for sampling the emissions & access platform for carrying out

Port holes of standard

stack sampling & provide electrical outlet points & other arrangements for chimney/stacks & other

sizes & suitable Location

sources of emissions so as to collect samples of emissions by the board or the applicant at anytime in

have been provided in DG

24

accordance with the provisions of the Act or Rules made therein.

set exhaust stacks.

The applicant shall provide all facilities and render requited assistance to the Board staff for collection of

Noted

samples/stack monitoring Inspection. 25

The applicant shall not change or alter either the quality or quantity or rate of emission or install, replace

Not envisaged.

or alter the air pollution control equipment or change the raw material or manufacturing process resulting in any change in quality &/or quantity of emissions without the previous written permission of the Board. 26

No control equipments or chimney shall be altered or replaced or as the case may be erected or re-

Noted

erected except with the previous approval of the Board. 27

The liquid effluent arising out of the operation of air pollution control equipment shall be treated in the No liquid effluent manner & to the standards prescribed by the Board in accordance with the provisions of generated. Water(Prevention & Control of Pollution) Act 1974(as amended).

28

The stack monitoring system employed by the applicant snail be opened for inspection to this Board at

Noted

any time 29

There shall not be any fugitive or episodal discharge from the premises.

Not envisaged.

30

In case of such episodal discharge/emissions the industry shall take immediate action to bring down the

Not envisaged

emission within the limits prescribed by the Board in conditions/stop operating of the plant. Report of such accidental discharge / emission shall be brought to the notice of the Board within 24hrs of occurrence. 31

The applicant shall keep the premises of the industrial plant & air pollution control equipments clean &

Sampling ports provided

make all hoods, pipes, valves, stacks/chimneys leak proof. The air pollution control equipments,

in DG stacks are

location, inspection chambers, sampling port holes shall be made easily accessible at all times.

inspected regularly while conducting ambient air monitoring program & made accessible by

providing ladders. 32

Any upset condition in any of the plant/plants of the factory which is likely to result in increased effluent

Noted

discharge/emissions of air pollutants & / or result in violation of the standards mentioned above shall be reported to the HQs & RO of the Board by fax / speed post within 24hrs of occurrence. 33

34

The industry has to ensure that minimum three varieties of trees are planted at the density of not less

Casurina, Minijum &

than 1000 trees per acre. The trees may be planted along boundaries of the industries or industrial

Sunari saplings have

premises. This plantation is stipulated over & above the bulk plantation of trees in that area.

been planted.

The solid waste such as sweeping, wastage packages, empty containers residues, sludge including that

Complied.

from air pollution control equipments collected within the premises of the industrial plants shall be disposed off scientifically to the satisfaction of the Board so as not to cause fugitive emission, dust problems through leaching etc of any kind. 35

All solid wastes arising in the premises shall be properly classified & disposed off to the satisfaction

1. Solid wastes from STP

of the Board by :

are being used for

(i)

gardening.

Landfill in case of inert material, care being taken to ensure that the material does not give rise to leachate which may percolate into ground water or carried away with storm run-off.

2. Solid wastes from

(ii)

Controlled incineration wherever possible in case of combustible organic material.

canteen are used as

(iii)

Composting in case of bio-degradable material

manure after vermincomposting.

36

Any toxic material shall be detoxicated if possible, otherwise be sealed in steel drums & buried in

NO toxic / hazardous

protected areas after obtaining approval of this Board in writing. The detoxification or sealing & burying

waste generated. Plant is

shall be carried out in the presence of Board’s authorized persons only. Letter of authorization shall be

a non polluting industry.

obtained for handling & disposal of hazardous wastes. 37

If due to any technological Improvement or otherwise this Board is of opinion that all or any of the conditions referred to above requires variation (Including the change of any control equipment either in whole or in part) this Board shall an.er giving the applicant! an opportunity of being heard, vary all or

Noted

any of such condition and thereupon the applicant shall be bound to comply With the conditions so varied 38

The applicant, his/heirs/legal representatives or assignees shall have no claim whatsoever to the

Noted

condition or renewal of this consent after the expiry period of this consent 39

The Board reserves the right to review, impose additional conditions or condition, revoke change or

Noted

alter the terms and conditions of this consent. 40

Notwithstanding anything contained in this conditional letter of consent, the Board hereby reserves to it

Noted

the right and power under section 27(2) of the Water (Prevention & Control of Pollution) Act, 1974 to review any and/or all the conditions Imposed herein above and to make such variations as deemed fit for the purpose of the Act by the Board 41

The conditions imposed as above shall continue to be In force until revoked under section 27(2) of the

Noted

Water (Prevention & Control of Pollution) Act 1974 and section 21 A of Air (Prevention & Control of Pollution) Act, 1981. 42

In case the consent fee is revised upward during this period, the industry shall pay the differential fees

Noted

to the Board (for the reaming years) to keep the consent order in force. If they fail to pay the amount within the period stipulated by the Board the consent order will be revoked Without prior notice. 43

The industry shall comply to all the conditions stipulated under charter on Corporate Responsibility for

Noted

Environmental Protection(CREP) guidelines in a time bound manner as envisaged therein(if applicable) 44

The industry shall comply with the conditions stipulated in CTE order issued by OSPCB & conditions

Complied.

stipulated in Environmental clearances issued by MOEF, Govt. of India. 45

The industry shall abide by E (P) Act 1986 & Rules framed there-under.

Noted

46

The Board reserves the right to revoke/refuse consent to operate at any time during period for which

Noted

consent is granted in case any violation is observed and to modify/stipulate additional conditions as deemed appropriate. GENERAL CONDITIONS FOR UNITS WITH INVESTMENT OF MORE THAN RS 50 CRORES AND 17 CATEGORIES OF

HIGHLY POLLUTING INDUSTRIES (RED A) 1

The applicant shall analyze the effluent / emissions & Ambient Air quality every month through

Ambient Air & Water

approved Lab for the parameters indicated in TABLE “B”,”C” & part “B” as mentioned in this order &

monitoring is being done

shall furnish the report thereof to the Board on monthly basis.

through NABL / OSPCB accredited agency only & reports generated.

2

th

The following information shall be forwarded to the Member Secretary on or before 10 of every month.

Noted

(a) Performance / progress of the treatment plant. (b) Monthly statement of daily discharge of domestic &/or trade effluent. 3

Non-compliance with effluent limitations a) If for any reason the applicant does not comply with or is unable to comply with any effluent limitations specified in this consent. the applicant shall immediately notify the consent issuing authority by telephone and provide the consent issuing authority with the following information in writing within 5 days of such notification. i) Causes of non-compliance Ii) A description of the non-compliance discharge including its impact on the receiving waters. iii) Anticipated time of continuance of non-compliance if expected to continue or if such condition has been corrected the duration or period of non-compliance. iv) Steps taken by the applicant to reduce and eliminate the non-complying discharge and v) Steps to be taken by the applicant too prevent the condition of non-compliance. b) The applicant shall take all reasonable steps to minimize any adverse impact to natural waters resulting from non-compliance with any effluent limitation specified in this consent including such accelerated or additional monitoring as necessary to determine the nature and impact of the noncomplying discharge. c) Nothing in this consent shall be construed to relieve the applicant from civil or criminal penalties for

Noted

noncompliance whether or not such non-compliance is due to factors beyond his control, such as break-down electric failure, accident or natural disaster. 4

Proper housekeeping shall be maintained inside the factory premise including process area by a

Daily House-keeping

dedicated team.

being done by IOCL appointed contractor.

5

The industry must constitute a team of responsible & technically qualified personnel who will ensure

1.

NIL trade effluent

operation of all pollution control devices round the clock(including night hrs) & should be in a position to

generated from process. It

explain the status of operation of the pollution control measures to the inspecting officers of the Board

is a non polluting unit with

at any point of time. The names of these persons with their contact telephone numbers shall be

ZERO discharge concept.

intimated to the concerned RO & HQ of the Board & in case of any change in the team it shall be

2.

intimated to the Board immediately.

pollution are being

Air & water

monitored from time to time & remedial action if required being taken as control measures. 6

The industry shall engage dedicated qualified manpower to ensure continuous & effective operation of

Ambient Air &Water

online stack / ambient air quality / effluent monitoring stations for maintenance of database, real time

monitoring program is

data transfer to SPCB server, data analysis & co-ordination with concerned personnel of process units

being done regularly by

for taking corrective measures in case of non-compliance & to respond to the instructions of SPCB in

M/s Cleenviron Pvt. Ltd.,

this matter.

Roulkela which has Lab accreditation from NABL & SPCB.

F

SPECIAL CONDITIONS(WATER POLLUTION CONTROL MEASURES)

01

The raw water lifted from bore wells shall be treated & treated water shall be used in terminal as per

We have two nos. 5m3/hr

potable water, green belt, cleaning & flushing process.

bore well pumps. Water is

used directly as make-up for fire water storage tanks & for potable purposes water from bore well is taken through WTP. 02

Domestic waste water shall be treated in the existing sewage treatment plants. The treated wastewater

Treated water from STP is

shall be used for green belt development. Under no circumstances waste water generated from STP

entirely re-used inside

shall be discharged to outside plant premises.

plant for gardening & maintenance of green belt.

03

STP sludge shall be used for gardening.

Complied.

04

Solid waste generated from the canteen shall be vermin-composted & will be used as manure.

Complied.

G

SPECIAL CONDITIONS(AIR POLLUTION CONTROL MEASURES)

01

The air compressor, DG set etc shall be acoustically designed so that noise outside it shall conform to

Acoustic enclosure

the prescribed norms.

provided & noise levels in dB within prescribed norms.

02

The unit shall provide adequate stack height to the DG sets as per formula.

Stack height above

H= h+O .2 √KVA, where

ground level is 6.0 m &

H=Height of the stack attached to the DG set in mtrs.

height from roof top is

h=Height of the building where DG set is housed in mtrs.

3.0m.

KVA=Capacity of the DG set 03

The industry shall provide vapor traps in the internal drains to take care of any eventual leakage of LPG

03 nos. of vapor traps are

into the drain.

provided. One nos. after

water drain line from the bullets. One nos. near drain outlet near emergency gate & 3rd one near north side boundary wall. 04

LPG compressor shall be used for suitable handling of LPG & to safely withstand the maximum outlet

One nos. of single acting

pressure to which it will be subjected.

vertical reciprocating piston type vapor compressor installed for unloading of sick tankers. High discharge pressure switch set at 9.0Kgs.

05

Gas detectors shall be placed at all critical locations in the LPG storage area such as near the

Total 26 nos of IR MPD

shutdown valves, in inspection tunnel, inside the common nozzle(provided for all piping connections to

gas detectors with XNX

bullets),near water drainage/sampling points etc.

universal transmitters are installed at various places in the plant as per OISD GDN 144.

06

Ambient air quality shall be maintained within the plant premises.

Being monitored regularly through accredited agency.

07

st

Auto-Visual alarms showing the locations of gas leakage shall be provided on the control panel. 1 level nd

alarm shall be set at 20% of LEL & 2 level alarm at 60% of LEL.

Gas detectors are calibrated every quarter & are set at 20% & 40%

LEL. AV alarm indication available in SCADA & at control room. 08

Fire Fighting system shall be installed & made operative all the time to take care of any emergency

Fire protection facilities as

situation arising out of fire.

per OISD GDN 144 installed & effectiveness of system checked every month during mock fire drills.

09

The unit shall take up massive plantation program within the plant premises. The green belt preferably

Plantation of casurina,

with local species along the periphery of the plant shall be raised. The proponent shall ensure the

minijhum & sunari has

maintenance of green belt throughout the year.

been undertaken.

H

OTHER SPECIAL CONDITIONS

1

The unit shall apply for CTE & EC & obtain necessary clearance for any expansion / enhancement of

Online application No

capacity, change or modification in the process / technology.

781945 dated: 29.7.16 for expansion of terminal for handling import.

2

Rain water harvesting structure shall be provided for collection of rain water from the roof of all buildings

Arrangement details /

for recharging of ground water within the premises as per concept & practices prescribed by CPCB.

feasibility is being finalized as per guidelines from IOC Head office & Orissa state office, Bhubaneswar.

3

The unit shall comply the provisions of MSIHC Rules 1989 & amendment thereof.

Noted

4

The unit shall abide by E (P) Act 1986 & Rules framed there under.

Noted

5

The unit shall obtain authorization from the BOARD under the Hazardous Waste (Management,

Spent / used lube oil is

Handling & Transboundary movement) Rules, 2008 amended thereof.

stored in barrels.

The industry shall obtain necessary approval from CCOE.

PESO License No:

6

S/HO/OR/03/251(S45144) dated : 09.7.15 obtained. 7

Requisite on-site & off-site DMP shall be prepared, submitted to the Board & implemented.

On site DMP in place.

8

The Board may impose further conditions or modify conditions as stipulated in the order during

Noted

installation and / or at that time of obtaining consent to operate and may revoke this clearance in case the stipulated conditions are not implemented and / or information is found to have been suppressed / wrongly furnished in the application form. 9

In case the consent fees is revised upward during this period, the industry shall pay the differential fees to the Board (for the period & remaining years) to keep the consent order in force. If they fail to pay the amount within the period stipulated by the Board the consent order will be revoked without prior notice.

Noted

Annexure-XII Cross Country Plan

BEDDING MATERIAL/SAND (TYP.) PIPELINE RIGHT OF USE

250-P-205-5445-A333-NI EXISTING LINE 200-P-205-5375-A333-NI EXISTING LINE

750-P-205-5245-5L60-NI EXISTING LINE

750-P-205-5372-5L60-NI EXISTING LINE

750-P-205-5349-5L60-NI EXISTING LINE

750-P-205-5351-5L60-NI EXISTING LINE

650-P-205-5275-5L60-IE EXISTING LINE

850-P-205-5259-5L60-NI EXISTING LINE

950-P-200-0035-5L60-NI EXISTING LINE

PIPELINE RIGHT OF USE

BACK FILLING (TYP.) PADDING MATERIAL/SAND (TYP.)

BACK FILLING BRICK

SAND

Z:\PC-00101-EPCM Services for LPG Import Terminal at Paradip\mechanical\apattanayak\deliverables\cross country piping\cross country piping overall plot plan\R6\PC00101-9511-0001_ R6

Annexure-XIII Proceeding of Public Hearing