Annexure-I Land Ownership Documents
Annexure-II Revenue Department- Khasara No.
Annexure-III NOC for CRZ
Annexure-IV EC Letter
Annexure-V ToR Letter
Annexure-VI Compliance of EC
Annexure-VII Fire Hydrant Layout
Annexure-VIII Drain Layout
KEY PLAN
D
D
GENERAL NOTES:-
GROUND WATER RECHARGE WELL
SECTION D-D
TYP. DETAILS OF DRAIN
CIVIL WORKS REQUIREMENTS
TYP. DETAILS OF VAPOUR TRAP
LEGEND:-
INDIAN OIL CORPORATION LIMITED EPCM SERVICES FOR LPG IMPORT TERMINAL, PARADIP, ODISHA LPG IMPORT TERMINAL ROAD AND DRAIN LAYOUT WITH RAIN WATER HARVESTING SYSTEM
Annexure-IX Animated Computer Model
Animated Computer Model
Annexure-X OISD Standard
OISD STANDARDS FOR MOUNDED AND BULLET STORAGE FACILITY
Sr.
OISD Standard/GDN/RP
No.
No
EDITION
STANDARD NAME
ON April 2016
1
OISD-STD-105
Work Permit System
Sep-04
2
OISD-STD-106
Pressure Relief & Disposal System
Oct-10
3
OISD-RP-110
4
OISD-STD-112
Recommended
Handling
OISD-STD-113
on
Static
of
Air
Hydrocarbon
Mixtures & Pyrophoric Substances Classification
5
Practices
Electricity Safe
of
Area
for
Aug-99
Oct-02
Electrical
Installations at Hydrocarbon Processing Oct-13 & Handling Facilities
6
OISD-STD-114
7
OISD-GDN-115
8
OISD-STD-116
9
OISD-STD-118
10
OISD-STD-119
11
OISD-STD-120
Safe Handling of Hazardous Chemicals Guidelines on Fire Fighting Equipment and Appliances in Petroleum Industry Fire Protection Facilities for Petroleum Refineries and Oil/Gas Processing Plants Layouts for Oil and Gas Installations Selection, Operation and Maintenance of Pumps Selection, Operation and Maintenance of Compressors
Oct-10 Jul-00
Jul-12 Jul-08 Jul-08
Jul-08
Selection, Operation and Maintenance of 12
OISD-RP-122
Fans, Blowers, Gear Boxes, Agitators & Jul-08 Mixers
13
OISD-RP-123
AS
Selection, Operation and Maintenance of Rotary Equipment Components
Jul-08
14
OISD-RP-124
Predictive Maintenance Practices
Aug-07
15
OISD-STD-125
16
OISD-RP-126
17
OISD-STD-127
18
OISD-STD-128
Inspection of Unfired Pressure Vessels
Oct-10
19
OISD-STD-129
Inspection of Storage Tanks
Nov-06
20
OISD-STD-130
Inspection of Piping Systems
Jul-08
21
OISD-STD-131
Inspection of Boilers
Aug-99
22
OISD-STD-132
Inspection of Pressure Relieving devices
Jul-12
23
OISD-STD-135
24
OISD-STD-137
25
OISD-STD-142
26
OISD-STD-144
27
OISD-GDN-145
28
OISD-RP-146
29
OISD-RP-147
30
OISD-RP-148
31
OISD-RP-149
Inspection & Maintenance of Mechanical Seals Specific practices for installations and maintenance of Rotating Equipment Selection,
Operation,
Inspection
&
Maintenance of Diesel Engines
Inspection of Loading & Unloading hoses for Petroleum Products Inspection of Electrical Equipment
systems Petroleum
Gas
(LPG)
Installations Guidelines on Internal Safety Audits (Procedures and Checklist) Preservation of idle electrical equipment Inspection
&
safe
practices
during
practices
during
electrical installations Inspection
&
safe
overhauling electrical equipment Design aspects for safety in electrical systems
Aug-07
Oct-10
Sep-01 April-16
Inspection of fire fighting equipments and
Liquefied
Aug-07
Feb-96
Jul-08
Sep-01 Aug-00 Oct-02
Aug-00
Oct-13
Design and Safety Requirements For 32
OISD-STD-150
Liquefied
Petroleum
Gas
Mounded Jul-08
Storage Facility Safety in Design, Fabrication and Fittings
33
OISD-STD-151
34
OISD-STD-152
35
OISD-STD-153
36
OISD-STD-154
Safety aspects in Functional Training
Sep-01
37
OISD-STD-155 (Part I)
(Part-I Non Respiratory Equipment)
Oct-10
38
OISD-STD-155 (Part II)
(Part II Respiratory Equipment)
Jul-95
39
OISD-STD-156
: Propane Tank Trucks Safety
Instrumentation
OISD-RP-157
Process
System in Hydrocarbon Industry Maintenance
&
inspection
of
safety
instrumentation in hydrocarbon industry
Fire
Protection
Facilities
for
Ports
Handling Hydrocarbons Recommended
40
for
Transportation
Practice of
Bulk
Jul-99
Oct-10
Jan -15
Oct-05
for Petroleum Sep-96
Products Recommended Practices on Storage and 41
OISD-RP-158
Handling of Bulk Liquefied Petroleum Aug-00 Gas
42
OISD-STD-159
43
OISD-STD-160
44
OISD-GDN-161
45
OISD-STD-162
46
OISD-STD-163
LPG Tank Trucks - Requirements of Safety on Design/Fabrication & Fittings Protection to fittings mounted on existing LPG tank trucks LPG Tank Truck Incidents : Rescue & Relief Operations Safety in installation and maintenance of LPG Cylinders Manifold Process Control Room Safety
Oct-02
Aug-93
Mar-03
Jul-95 Sep-04
47
OISD-STD-164
48
OISD-GDN-165
49
OISD-GDN-166
50
OISD-RP-167
51
OISD-GDN-168
Fire
Proofing
of
Steel
Supporting
Structures in Oil & Gas Industry Guidelines
for
Rescue
&
Relief
Operations for POL Tank Truck Accident Guidelines
for
Occupational
Health
Monitoring in Oil and Gas Industry POL Tank lorry Design & Safety Emergency
Preparedness
Plan
Jul-12
Jul-99
Jul-12 Jul-97
for
Marketing Locations of Oil Industry
Jul-97
OISD Guidelines on Small LPG Bottling 52
OISD-GDN-169
Plants
(Design
and
Fire
Protection Jul-08
facilities) Inspection, 53
OISD-STD-170
Maintenance,
Rehabilitation
of
Repairs
Foundations
& & Jul-97
Structures Preservation of Idle Static & Rotary
54
OISD-STD-171
55
OISD-STD-173
56
OISD-STD-177
57
OISD-GDN-178
Guidelines on Management Of Change
Jul-99
58
OISD-GDN-180
Lightning Protection
Jul-99
Mechanical Equipment Fire Prevention and Protection System for Electrical Installations Inspection & Maintenance of Thermal Insulation
Jul-98
Sep-03
Jun-98
Standard on Replacement of Personal 59
OISD-STD-184
Protective Equipment & Life Saving Aug-00 Appliances
60
OISD-STD-185
Wire Line Operations
Oct-02
61
OISD-GDN-186
Simultaneous Operations in E&P Industry 2008
62
OISD-STD-188
Corrosion Monitoring Of Offshore & Aug-00
Onshore Pipelines 63
OISD-GDN-192
Safety Practices during Construction
April-16
Safety in Design, Operation, Inspection 64
OISD-STD-195
and Maintenance of Hydrocarbon Gas Sep-01 Compressor Stations and Terminals Guidelines for Seeking Environmental
65
OISD-GDN-196
Clearance of Development Projects in Sep-01 Petroleum Industry
66
OISD-GDN-197
67
OISD-GDN-203
68
OISD-GDN-206
69
OISD-GDN-207
70
OISD-STD-210
71
OISD-GDN-211
72
OISD-GDN-212
73
OISD-GDN-224
74
OISD-GDN-227
Guidelines
for
Environmental
Impact
Assessment Operation, Maintenance & Inspection Of Hoisting Equipment Guidelines
on
Safety
Management
System in Petroleum Industry Contractor Safety
Sep-01
Sep-03
Sep-01 April-16
Storage, Handling and Refueling of LPG for automotive use Safety in Petroleum Laboratories
Oct-10 Sep-03
Guidelines on Environmental Audit in Downstream Petroleum Sector Monitoring & Control of Volatile Organic Compounds Emission Emergency Response and Preparedness in E&P Industry
Oct-02
Nov-06
Aug-07
Selection, Training & Placement of Fire 75
OISD-GDN-228
Operators
in
Hydrocarbon
& Jul-08
Petrochemical Industry 76
OISD-GDN-232
Identification of hazards and control measures in E&P industry
Oct-13
Design, 77
OISD-STD-236
Layout,
Maintenance Storage
of
Operation Refrigerated
& LPG Jan-15
Annexure-XI CTO with Compliance
COMPLIANCE REPORT OF CTO Sr.
CTO Conditions
Compliance Status
No. 1
Consent to operate is hereby granted under section 25/26 of Water (prevention & Control of Pollution)
Noted
Act, 1974 and under section 21 of Air (Prevention & Control of Pollution) Act, 1981 and rules framed thereunder to Name of the Industry: M/s LPG Marketing Terminal , Indian Oil Corporation Ltd. Name of the Occupier & Designation: Sri Somanath Das, Manager Address: At-Bhittargarh, Po-Atharabanki, Paradip, Dist-Jagatsinghpur, Odisha 2
This consent order is valid for the period up to 31 -03-2016
Noted
3
This consent order is valid for the product quantity, specified outlets, discharge quantity and quality,
Noted
specified chimney/stack, emission quantity and quality of emissions as specified below. This consent is granted subject to the general and special conditions stipulated therein. A
Details of Receipt & Storage of POL:
SL. 1.
Product Storage, Handling and Loading LPG in Tankers
Noted
Capacity 6,00,000 MTPA
B
Discharge permitted through the following outlet subject to the standard: Outlet
Description
Point of
Qty of
No.
of outlet
discharge discharge
Prescribed standard pH
KLD 01.
Domestic
Used for
effluent at
gardening
12
Noted
SS
BOD
O&G
(mg/L)
(mg/L)
(mg/L)
5.5-9.0
100
30
10
outlet of STP C
Emission permitted through the following stack subject to the prescribed standard: Chimney
Stack
Stack ht , Qty of
stack
attached
(m)
emission
No.
to
above
(m3/Hr)
Prescribed standard
DG set
HC (g)
NOx(g)
(mg/Nm3)
KW-hr
KW9.2- KW-hr 3.5hr
5.50
-
0.3
1.3 g/kw-
750KVA 02.
DG set
CO(g)
PM
roof 01.
Noted
9.2
3.5
9.2
3.5
hr 4.00
-
0.3
1.3
320KVA D
Disposal of solid waste permitted in the following manner : SL
Noted
Type of
Qty
Qty to be
Qty to be
Qty
Description of
solid waste
generated
reused on
reused
disposed
disposal site
(TPA)
site(TPA)
off
off(TPA)
site(TPA) 01.
Canteen waste
9.00
-
-
-
Vermincomposting,
manure used for gardening 02.
Sludge from
0.30
-
-
-
Land-filling
0.65
-
-
-
Gardening as
settling tank 03.`
STP Sludge
manure E
GENERAL CONDITIONS FOR ALL UNITS
1
The consent is given by the board in consideration of the particulars given in the application. Any
Noted
change or alteration or deviation made in actual practice from the particulars furnished in the application will also be the ground liable for review/variation/revocation of the consent order u/s 27 of the Act of Water (Prevention & Control of Pollution) act 1974 & section 21 of Air (Prevention & Control of Pollution) Act 1981 & to make such variations as deemed fit for the purpose of the Acts. 2
The industry would immediately submit revised application for consent to operate to this board in the
Noted
event of any change in the quantity & quality of raw material / and products / manufacturing process or quantity / quality of the effluent rate of emission / air pollution control equipment / system etc 3
The applicant shall not change or alter the quantity or quality or the rate of discharge or temperature or
Noted
the route of discharge without the previous written permission of the Board. 4
The applicant shall comply with & carry out the directives/orders issued by the board in this consent
Complied as directed.
order & at all subsequent times without any negligence on his part. In case of non-compliance of any order/directives issued at any time &/or violation of the terms & conditions of this consent order , the applicant shall be liable for legal action as per the provisions of the Law/Act 5
The applicant shall make an application for grant of fresh consent at-least 90days before the date of
Consent order: 2810
expiry of this consent order.
dated: 30.5.15 was valid till 31.03.2016. On 11.2.16 renewal of
CTO submitted manually to OSPCB & again online application: 749603 dated: 10.6.16 resubmitted for renewal from 01.4.16 till 31.3.2020(5 yrs). 6
The Issuance of this consent does not convey any property light in either real or personal property or
Noted
any exclusive privileges nor does It authorize any injury to private property or any invasion of personal rights. nor any Infringement of Central, State laws or regulation 7
This consent does not authorize or approve the construction of any physical structure or facilities or the
Noted
undertaking of any work in any natural water course 8
The applicant shall display this consent granted to him in a prominent place for perusal of the public &
Displayed prominently.
inspecting officers of this Board. 9
An inspection book shall be opened & made available to Board’s officers during the visit to the Factory.
Noted
10
The applicant shall furnish to the visiting officer of the Board any information regarding the construction,
Noted
installation or operation of the plant or of effluent treatment system / air pollution control system / stack monitoring system any other particulars as may be pertinent to preventing and controlling pollution of Water I Air. 11
Meters must be affixed at the entrance of the water supply connection so that such meters are easily
Meters fixed on the
accessible for inspection & maintenance & for other purposes of the Act provided that the place where it
delivery side of bore wells
is fixed shall in no case be at a point before which water has been tapped by the consumer for
piping, before tapping.
utilization for any purposes whatsoever.
12
Separate meters with necessary pipeline for assessing the qty of water used for each of the purposes mentioned below :
1. Cooling water for LPG pump seal
(a) Industrial cooling, spray in mine pits or boiler feed.
flows in a closed
(b) Domestic purpose
circuit.
(c) Process
2. There are no mine pits & boilers. 3. Water mainly used for domestic purpose & fire fighting (in case situation arises).
13
The applicant shall display suitable caution board at the place where the effluent is entering into any
No trade effluent is
water body or any other place to be indicated by the board, indicating therein that the area into which
generated.
the effluents are being discharged is not fit for the domestic use / bathing 14
Storm water shall not be allowed to mix with the trade & / or domestic effluent on the upstream of the
Storm water & domestic
terminal manholes where the flow measuring devices will be installed.
effluent are two separate streams. No mixing anywhere.
15
The applicant shall maintain good house-keeping both within the factory & the premises. All pipes,
Good House-keeping
valves, sewers & drains shall be leak proof. Floor washing shall be admitted into the effluent collection
being maintained.
system only & shall not be allowed to find their way in storm drains or open areas.
Water from TLF & LPG PH sheds are directed to vapor traps & not allowed entry to storm drains.
16
The applicant shall at all times maintain in good working order & operate as efficiently as possible all
Noted, The two nos. of
treatment or control facilities or systems installed or used by him to achieve with the terms & conditions
STP”s capacity 6.5m3/day
of the consent.
& 4.5m3/day each being maintained.
17
Care should be taken to keep the anaerobic lagoons, if any, biologically active & not utilized as mere
No anaerobic Lagoons
stagnation ponds. The anaerobic lagoons should be fed with the required nutrients for effective
available in the premises.
digestion. Lagoons should be constructed with sides & bottom made impervious. 18
The utilization of treated effluent on factory’s own Land, if any, should be completed & there should be
Domestic effluent from
no possibility of the effluent gaining access into any drainage channel or other water courses either
canteen, office buildings &
directly or by overflow.
toilets/urinals are sent to STP directly. No industrial effluent generated.
19 20
The effluent disposal on land, if any, should be done without creating any nuisance o the surroundings
No industrial effluent
or inundation of the lands at any time.
generated.
If at any time the disposal of treated effluent on land becomes incomplete or unsatisfactory or create
No industrial effluent
any problems or becomes a matter of dispute, the industry must adopt alternate satisfactory treatment
generated.
& disposal measures. 21
The sludge from treatment units shall be dried in sludge drying beds & the drained liquid shall be taken
The dried sludge from
to equalization tank.
STP beds is used for the purpose of gardening.
22 23
The effluent treatment units & disposal measures shall become operative at the time of commencement
No industrial effluent
of production.
generated.
The application shall provide port holes for sampling the emissions & access platform for carrying out
Port holes of standard
stack sampling & provide electrical outlet points & other arrangements for chimney/stacks & other
sizes & suitable Location
sources of emissions so as to collect samples of emissions by the board or the applicant at anytime in
have been provided in DG
24
accordance with the provisions of the Act or Rules made therein.
set exhaust stacks.
The applicant shall provide all facilities and render requited assistance to the Board staff for collection of
Noted
samples/stack monitoring Inspection. 25
The applicant shall not change or alter either the quality or quantity or rate of emission or install, replace
Not envisaged.
or alter the air pollution control equipment or change the raw material or manufacturing process resulting in any change in quality &/or quantity of emissions without the previous written permission of the Board. 26
No control equipments or chimney shall be altered or replaced or as the case may be erected or re-
Noted
erected except with the previous approval of the Board. 27
The liquid effluent arising out of the operation of air pollution control equipment shall be treated in the No liquid effluent manner & to the standards prescribed by the Board in accordance with the provisions of generated. Water(Prevention & Control of Pollution) Act 1974(as amended).
28
The stack monitoring system employed by the applicant snail be opened for inspection to this Board at
Noted
any time 29
There shall not be any fugitive or episodal discharge from the premises.
Not envisaged.
30
In case of such episodal discharge/emissions the industry shall take immediate action to bring down the
Not envisaged
emission within the limits prescribed by the Board in conditions/stop operating of the plant. Report of such accidental discharge / emission shall be brought to the notice of the Board within 24hrs of occurrence. 31
The applicant shall keep the premises of the industrial plant & air pollution control equipments clean &
Sampling ports provided
make all hoods, pipes, valves, stacks/chimneys leak proof. The air pollution control equipments,
in DG stacks are
location, inspection chambers, sampling port holes shall be made easily accessible at all times.
inspected regularly while conducting ambient air monitoring program & made accessible by
providing ladders. 32
Any upset condition in any of the plant/plants of the factory which is likely to result in increased effluent
Noted
discharge/emissions of air pollutants & / or result in violation of the standards mentioned above shall be reported to the HQs & RO of the Board by fax / speed post within 24hrs of occurrence. 33
34
The industry has to ensure that minimum three varieties of trees are planted at the density of not less
Casurina, Minijum &
than 1000 trees per acre. The trees may be planted along boundaries of the industries or industrial
Sunari saplings have
premises. This plantation is stipulated over & above the bulk plantation of trees in that area.
been planted.
The solid waste such as sweeping, wastage packages, empty containers residues, sludge including that
Complied.
from air pollution control equipments collected within the premises of the industrial plants shall be disposed off scientifically to the satisfaction of the Board so as not to cause fugitive emission, dust problems through leaching etc of any kind. 35
All solid wastes arising in the premises shall be properly classified & disposed off to the satisfaction
1. Solid wastes from STP
of the Board by :
are being used for
(i)
gardening.
Landfill in case of inert material, care being taken to ensure that the material does not give rise to leachate which may percolate into ground water or carried away with storm run-off.
2. Solid wastes from
(ii)
Controlled incineration wherever possible in case of combustible organic material.
canteen are used as
(iii)
Composting in case of bio-degradable material
manure after vermincomposting.
36
Any toxic material shall be detoxicated if possible, otherwise be sealed in steel drums & buried in
NO toxic / hazardous
protected areas after obtaining approval of this Board in writing. The detoxification or sealing & burying
waste generated. Plant is
shall be carried out in the presence of Board’s authorized persons only. Letter of authorization shall be
a non polluting industry.
obtained for handling & disposal of hazardous wastes. 37
If due to any technological Improvement or otherwise this Board is of opinion that all or any of the conditions referred to above requires variation (Including the change of any control equipment either in whole or in part) this Board shall an.er giving the applicant! an opportunity of being heard, vary all or
Noted
any of such condition and thereupon the applicant shall be bound to comply With the conditions so varied 38
The applicant, his/heirs/legal representatives or assignees shall have no claim whatsoever to the
Noted
condition or renewal of this consent after the expiry period of this consent 39
The Board reserves the right to review, impose additional conditions or condition, revoke change or
Noted
alter the terms and conditions of this consent. 40
Notwithstanding anything contained in this conditional letter of consent, the Board hereby reserves to it
Noted
the right and power under section 27(2) of the Water (Prevention & Control of Pollution) Act, 1974 to review any and/or all the conditions Imposed herein above and to make such variations as deemed fit for the purpose of the Act by the Board 41
The conditions imposed as above shall continue to be In force until revoked under section 27(2) of the
Noted
Water (Prevention & Control of Pollution) Act 1974 and section 21 A of Air (Prevention & Control of Pollution) Act, 1981. 42
In case the consent fee is revised upward during this period, the industry shall pay the differential fees
Noted
to the Board (for the reaming years) to keep the consent order in force. If they fail to pay the amount within the period stipulated by the Board the consent order will be revoked Without prior notice. 43
The industry shall comply to all the conditions stipulated under charter on Corporate Responsibility for
Noted
Environmental Protection(CREP) guidelines in a time bound manner as envisaged therein(if applicable) 44
The industry shall comply with the conditions stipulated in CTE order issued by OSPCB & conditions
Complied.
stipulated in Environmental clearances issued by MOEF, Govt. of India. 45
The industry shall abide by E (P) Act 1986 & Rules framed there-under.
Noted
46
The Board reserves the right to revoke/refuse consent to operate at any time during period for which
Noted
consent is granted in case any violation is observed and to modify/stipulate additional conditions as deemed appropriate. GENERAL CONDITIONS FOR UNITS WITH INVESTMENT OF MORE THAN RS 50 CRORES AND 17 CATEGORIES OF
HIGHLY POLLUTING INDUSTRIES (RED A) 1
The applicant shall analyze the effluent / emissions & Ambient Air quality every month through
Ambient Air & Water
approved Lab for the parameters indicated in TABLE “B”,”C” & part “B” as mentioned in this order &
monitoring is being done
shall furnish the report thereof to the Board on monthly basis.
through NABL / OSPCB accredited agency only & reports generated.
2
th
The following information shall be forwarded to the Member Secretary on or before 10 of every month.
Noted
(a) Performance / progress of the treatment plant. (b) Monthly statement of daily discharge of domestic &/or trade effluent. 3
Non-compliance with effluent limitations a) If for any reason the applicant does not comply with or is unable to comply with any effluent limitations specified in this consent. the applicant shall immediately notify the consent issuing authority by telephone and provide the consent issuing authority with the following information in writing within 5 days of such notification. i) Causes of non-compliance Ii) A description of the non-compliance discharge including its impact on the receiving waters. iii) Anticipated time of continuance of non-compliance if expected to continue or if such condition has been corrected the duration or period of non-compliance. iv) Steps taken by the applicant to reduce and eliminate the non-complying discharge and v) Steps to be taken by the applicant too prevent the condition of non-compliance. b) The applicant shall take all reasonable steps to minimize any adverse impact to natural waters resulting from non-compliance with any effluent limitation specified in this consent including such accelerated or additional monitoring as necessary to determine the nature and impact of the noncomplying discharge. c) Nothing in this consent shall be construed to relieve the applicant from civil or criminal penalties for
Noted
noncompliance whether or not such non-compliance is due to factors beyond his control, such as break-down electric failure, accident or natural disaster. 4
Proper housekeeping shall be maintained inside the factory premise including process area by a
Daily House-keeping
dedicated team.
being done by IOCL appointed contractor.
5
The industry must constitute a team of responsible & technically qualified personnel who will ensure
1.
NIL trade effluent
operation of all pollution control devices round the clock(including night hrs) & should be in a position to
generated from process. It
explain the status of operation of the pollution control measures to the inspecting officers of the Board
is a non polluting unit with
at any point of time. The names of these persons with their contact telephone numbers shall be
ZERO discharge concept.
intimated to the concerned RO & HQ of the Board & in case of any change in the team it shall be
2.
intimated to the Board immediately.
pollution are being
Air & water
monitored from time to time & remedial action if required being taken as control measures. 6
The industry shall engage dedicated qualified manpower to ensure continuous & effective operation of
Ambient Air &Water
online stack / ambient air quality / effluent monitoring stations for maintenance of database, real time
monitoring program is
data transfer to SPCB server, data analysis & co-ordination with concerned personnel of process units
being done regularly by
for taking corrective measures in case of non-compliance & to respond to the instructions of SPCB in
M/s Cleenviron Pvt. Ltd.,
this matter.
Roulkela which has Lab accreditation from NABL & SPCB.
F
SPECIAL CONDITIONS(WATER POLLUTION CONTROL MEASURES)
01
The raw water lifted from bore wells shall be treated & treated water shall be used in terminal as per
We have two nos. 5m3/hr
potable water, green belt, cleaning & flushing process.
bore well pumps. Water is
used directly as make-up for fire water storage tanks & for potable purposes water from bore well is taken through WTP. 02
Domestic waste water shall be treated in the existing sewage treatment plants. The treated wastewater
Treated water from STP is
shall be used for green belt development. Under no circumstances waste water generated from STP
entirely re-used inside
shall be discharged to outside plant premises.
plant for gardening & maintenance of green belt.
03
STP sludge shall be used for gardening.
Complied.
04
Solid waste generated from the canteen shall be vermin-composted & will be used as manure.
Complied.
G
SPECIAL CONDITIONS(AIR POLLUTION CONTROL MEASURES)
01
The air compressor, DG set etc shall be acoustically designed so that noise outside it shall conform to
Acoustic enclosure
the prescribed norms.
provided & noise levels in dB within prescribed norms.
02
The unit shall provide adequate stack height to the DG sets as per formula.
Stack height above
H= h+O .2 √KVA, where
ground level is 6.0 m &
H=Height of the stack attached to the DG set in mtrs.
height from roof top is
h=Height of the building where DG set is housed in mtrs.
3.0m.
KVA=Capacity of the DG set 03
The industry shall provide vapor traps in the internal drains to take care of any eventual leakage of LPG
03 nos. of vapor traps are
into the drain.
provided. One nos. after
water drain line from the bullets. One nos. near drain outlet near emergency gate & 3rd one near north side boundary wall. 04
LPG compressor shall be used for suitable handling of LPG & to safely withstand the maximum outlet
One nos. of single acting
pressure to which it will be subjected.
vertical reciprocating piston type vapor compressor installed for unloading of sick tankers. High discharge pressure switch set at 9.0Kgs.
05
Gas detectors shall be placed at all critical locations in the LPG storage area such as near the
Total 26 nos of IR MPD
shutdown valves, in inspection tunnel, inside the common nozzle(provided for all piping connections to
gas detectors with XNX
bullets),near water drainage/sampling points etc.
universal transmitters are installed at various places in the plant as per OISD GDN 144.
06
Ambient air quality shall be maintained within the plant premises.
Being monitored regularly through accredited agency.
07
st
Auto-Visual alarms showing the locations of gas leakage shall be provided on the control panel. 1 level nd
alarm shall be set at 20% of LEL & 2 level alarm at 60% of LEL.
Gas detectors are calibrated every quarter & are set at 20% & 40%
LEL. AV alarm indication available in SCADA & at control room. 08
Fire Fighting system shall be installed & made operative all the time to take care of any emergency
Fire protection facilities as
situation arising out of fire.
per OISD GDN 144 installed & effectiveness of system checked every month during mock fire drills.
09
The unit shall take up massive plantation program within the plant premises. The green belt preferably
Plantation of casurina,
with local species along the periphery of the plant shall be raised. The proponent shall ensure the
minijhum & sunari has
maintenance of green belt throughout the year.
been undertaken.
H
OTHER SPECIAL CONDITIONS
1
The unit shall apply for CTE & EC & obtain necessary clearance for any expansion / enhancement of
Online application No
capacity, change or modification in the process / technology.
781945 dated: 29.7.16 for expansion of terminal for handling import.
2
Rain water harvesting structure shall be provided for collection of rain water from the roof of all buildings
Arrangement details /
for recharging of ground water within the premises as per concept & practices prescribed by CPCB.
feasibility is being finalized as per guidelines from IOC Head office & Orissa state office, Bhubaneswar.
3
The unit shall comply the provisions of MSIHC Rules 1989 & amendment thereof.
Noted
4
The unit shall abide by E (P) Act 1986 & Rules framed there under.
Noted
5
The unit shall obtain authorization from the BOARD under the Hazardous Waste (Management,
Spent / used lube oil is
Handling & Transboundary movement) Rules, 2008 amended thereof.
stored in barrels.
The industry shall obtain necessary approval from CCOE.
PESO License No:
6
S/HO/OR/03/251(S45144) dated : 09.7.15 obtained. 7
Requisite on-site & off-site DMP shall be prepared, submitted to the Board & implemented.
On site DMP in place.
8
The Board may impose further conditions or modify conditions as stipulated in the order during
Noted
installation and / or at that time of obtaining consent to operate and may revoke this clearance in case the stipulated conditions are not implemented and / or information is found to have been suppressed / wrongly furnished in the application form. 9
In case the consent fees is revised upward during this period, the industry shall pay the differential fees to the Board (for the period & remaining years) to keep the consent order in force. If they fail to pay the amount within the period stipulated by the Board the consent order will be revoked without prior notice.
Noted
Annexure-XII Cross Country Plan
BEDDING MATERIAL/SAND (TYP.) PIPELINE RIGHT OF USE
250-P-205-5445-A333-NI EXISTING LINE 200-P-205-5375-A333-NI EXISTING LINE
750-P-205-5245-5L60-NI EXISTING LINE
750-P-205-5372-5L60-NI EXISTING LINE
750-P-205-5349-5L60-NI EXISTING LINE
750-P-205-5351-5L60-NI EXISTING LINE
650-P-205-5275-5L60-IE EXISTING LINE
850-P-205-5259-5L60-NI EXISTING LINE
950-P-200-0035-5L60-NI EXISTING LINE
PIPELINE RIGHT OF USE
BACK FILLING (TYP.) PADDING MATERIAL/SAND (TYP.)
BACK FILLING BRICK
SAND
Z:\PC-00101-EPCM Services for LPG Import Terminal at Paradip\mechanical\apattanayak\deliverables\cross country piping\cross country piping overall plot plan\R6\PC00101-9511-0001_ R6
Annexure-XIII Proceeding of Public Hearing