Everest Pre Engineered Buildings
NO COST OVERRUNS NO DELAYS
NOW YOU CAN RELAX!
Everest Pre Engineered Buildings
NOW YOU CAN RELAX!
Everest Industries Limited - Pan India Presence ●
Established in 1934. Today an Indian MNC.
●
Promoted by ACC Cements initially. Presently
major stake held by erstwhile promoters of Ambuja Cements. ●
Engaged in the business of
manufacturing PEBs, roofing, cladding, walls, floors & providing complete building solutions. Team of 3000+ Engineers, Designers & detailers ●
●
Seven manufacturing facilities across India,
Eighth facility upcoming at Dahej, GUJRAT. ●
Over 6000 retail points across India
●
Exports to over 25 countries over 3 continents
Complete Building Solutions From Pre-engineered steel buildings to roofing to exterior cladding to ceiling to flooring to walls to doors.
Smart Steel Buildings - 100% customized, great design flexibility, resistant to moisture, adverse
weather conditions, earthquakes, termites & fire. Used here for: Posco Group Housing, Pune
PEB - Faster, Efficient construction. Larger Spans. Used here for : Noble Industries, Haridwar
Complete Building Solutions
Fibre Cement roofing - longer life and greater durability
Used here for: Animal Shed, Kanpur
Solid Wall Panels - maintains the solid effect of a conventional brick or block wall while 10 times faster Used here for: Conference Hall
Financials – FASTEST GROWING BUILDING SOLUTION COMPANY In INDIA
Everest has grown 4 times in past 5 years, that makes us fastest growing Steel Building Solutions provider in India 1200.0
1000.0 1014 886.9 800.0 721.6 680.9
600.0 529.5 400.0 325.8 200.0
229.7
285.1
253.1
0.0
Turn Over (` in Cr)
2004-05
2005-06
2006-07
2007-08
2008-09 (July'08 PEB div
229.7
253.1
325.8
285.1
529.5
2009-10
2010-11
2011-12
2012-13
680.9
721.6
886.9
1014
Complete Building Solutions Access Floor - Liftable floor tiles for housing HVAC, power, voice and data cabling under the floor Used here for: Commercial Spaces at Mumbai
Everest Wall boards - Double the strength. Half the construction time. Used here for: Swissotel Hotel , Kolkata
THE EVEREST ADVANTAGE
Over 1000 Buildings 27 States 245 Cities Over 45 million Sq. ft. covered area
Best Brands in diverse applications: Cement to Chocolate, Spark plug to Tractor, Mobile Phone to Refrigerator, Film Studio to Engg. College
What do they say :
“Our running factory building has over 200 MT of cranes lifting capacity. And it is easily taking these loads. The building was designed & supplied by Everest. " - Mr. Kaushik Biswas, GM, Mcnally Bharat Engineering
“We really appreciate Everest Team in achieving Safe and Timely erection of our project. Their support and efforts were commendable” - Mr. C. Munshi, Construction Manager, Larsen & Toubro
What do they say :
“Irrespective of natural vagaries and tight schedules, our warehouse was ready on time without any extra
cost, all thanks to the super-efficient team at Everest, who delivered everything without any hassles.” - Mr. Vinod Malde (M.D.), Arham Logiparc (A premier Warehousing & Industrial Park)
“ We're impressed with the great design ability and smart engineering by Everest. Our need for
ample loading and unloading bays was well met.” - Mr. Anil Arora, MD, MJ Logistics (A high end 3PL Service Provider)
Why they Trust us :
We Deliver ! ON TIME. EVERY Single TIME. • Transparent and Process- driven, hence perform Consistently • System ensures customer is kept 'within the loop • Having executed 1000 PEBs in diverse applications, our engineers understand those vital aspects of industry • Entire design, manufacturing & site operations on SAP. Entire PEB project is ONE integrated process, hence full control over schedule • Higher resource per project in comparison to industry standards. Ensures quality service and comfort to our customers
Why they Trust us :
Infrastructure
PEB Manufacturing Facility - Roorkee: Brand New Facility Upcoming at DAHEJ, GUJRAT • Area - 850000 SQ.FT
• Investment US$ 25 Million • Work Force – 1000 nos. • Capacity -60,000 MT per annum (expandable to 100,000 MT) • State-of-the-art plant, with machinery from US, Europe, China and Taiwan) • 2 Lines for Automatic Beam welding
• 8 Roll forming Lines for Purlins & Girts • Versatile set of CNC / Drilling / Cutting Machines • Entire Operations on SAP R/3. • Plant commissioned in record time of 5 months
Everest Design & Engineering
“A Building designed better, will naturally perform better...” Highest Design Strength* in the industry in India Two Design Offices:
New Delhi Design Office
Roorkee Design Office
* Everest Design Strength is Double the strength of any other player in Industry.
Everest Design & Engineering • Headed by highly qualified professional with above 20 years experience in Design & Detailing of steel buildings. • Highly sophisticated design software like Everest-MBS, STAAD Pro V8i, Tekla, Auto CAD &
customized programmes for connection design/ bracing design. • Design files internally communicated on SAP leading to fast and real time processing. • Design as per all National and International Codes
AISC
American Institute of steel construction: 1989
MBMA
Metal Building Manufacturer Association: 1996
AWS
American Welding Society: 2000 Edition D1.1M
IS 800
Indian Standard 800 (for Design) : 1984 & 2007
IS 801
Indian Standard 801 (for cold formed): 1975
IS 875
Indian Standard 875 (for loads application): 1987
IS 1893
Indian standard 1893 (seismic code): Part-1 (2002)
STRENGTH
74
Project Management:
Erection Services: A well placed Projects Team at various Industrial Cities / Towns/ Sites through out the country provides an all time availability for Erection services
Everest Quality
• Highly qualified team for QA & QC • Established QAP • Fully equipped Quality Lab at Plant • Complete traceability of material
Testing on UTM
Ultrasonic Testing
Strict Quality Control Dye Penetration Testing
Project Management:
Safety & Statutory Compliance: An Integral Part of Everest Projects • Everest has SAFETY POLICY , practiced at all Sites • All Statutory formalities met • All planned Activities in the Erection Schedule analyzed in advance for Safety • Accordingly Safety Plan made. Erection Activities proceed as per Safety Plan • All Workers checked for Medical Fitness • Daily Safety Talk Must • SAFETY AUDITS taken up at various stages of project • Safety Calendar (Green Cross) displayed • Safety Plan guarantees PPE (Personal Protective Equipment) usage
Project Management:
SPEED ensures following: • Seamless integration from RFQ to project handover
• Sequential supplies, as building is divided into Lots • Material to be dispatched First, is manufactured First • Material to be erected First, is dispatched First • Reduces erection time and provides faster, accurate project completion • Real Time Reporting • Dedicated section for uploading: All project drawings retrieval anytime for any requirement
Project Management
SPEED - Everest runs on SAP R/3. Speed has streamlined and integrated entire design, manufacturing & project management process. Awarded SAP ACE Award 2012 as “Best Run Implementation” by SAP India
Completion & Handing Over of Building
Moments of Pride
Everest in Limca Book of Records for fastest construction
Ansal Institute of Management & Technology, Lucknow
Everest wins CIDC award 2010- Best Professionally Managed Co.
(From L-R) Miss Jyothi Girish from Construction Industry Dev. Council (CIDC), Mr. Raghvendra Pratap from Everest, Dr. Pronab Sen from Planning Commission and Mr.Tarun Seal from Kolkata Works, Everest
Everest wins AESA award
Ecorea & Kuroda Electric India Pvt Ltd Pune
ESBS has also bagged AESA Beharay Rathi Award 2013 in Non Residential Category for Creation of Ecorea & Kuroda Electric India Pvt. Ltd.
Everest – Excellence in Cost Management
Everest wins 9th National Award for Excellence in Cost Management -2011 by The Institute of Cost Accounts of India for Most Cost Efficiency
Everest – Certified IGBC Member
Everest Member of IGBC (India Green Building Council)
LEED certified Green Buildings
BP ERGO, Nalagarh, Himachal Pradesh
RANBAXY Ltd, Dewas, MP
Everest selected for “PEB Project of the Year “ awards Britannia Industries Limited Patna (Bihar), Bhubaneswar (Odisha) & Bharuch (Gujrat) Area (sq.ft.): 5,00,000
Everest selected for “PEB Project of the Year “ awards Nirmal Wires Kolkata Area (sq.ft.): 2,00,000
Everest selected for “PEB Project of the Year “ awards Shri Shubham Logistics (Kalptaru Group)
Rajkot, Deesa, Alwar, Jodhpur, Ramganjmandi Area (sq.ft.): 5,64,900
Everest Plant Video
Project Gallery
Logistical Unit/ Warehouse: Location: Dewas Area (Sq.ft) :40,000
Ranbaxy Laboratory Ltd.
Key features • Building with Mezzanine and Flat Roofing System • Amalgam with different areas done with Precise accuracy • Clear Height – 50 ft
Factory Building: Honey Warehouse Location: Baddi, Himachal Pradesh Area (Sq.ft) : 37,000
Dabur India Ltd
Key features • Scheduled completion: 110 days; Actual completion: 90 days • Special building for honey warehouse • PUF insulated
Logistical Units/ Warehouse Location: Bhiwandi, Mumbai Area (Sq.ft) : 6,10,404 Arham Logistics
Key features • Two Precision engineered buildings connected with well designed PEB pathway • Innovative clear span construction • Span -63 ft
Logistical Units/ Warehouse Location: Bhiwadi, Rajasthan Area (Sq.ft) : 1,42,032
BK Tyre
Key features • Intricate L Shaped building, with more loading and unloading docks • One intermediate column for both buildings EMS 1 • Clear Heights 39 ft
Logistical Units/ Warehouse Location: Alwar, Rajkot, Jodhpur, Dessa, Ramganj Mandi Area (Sq.ft) : 5,64,900
Shree Shubham Logistics Ltd
Key features • Jack beam provided to increase bay space by 49 ft • IS- Standard building with heavy collateral loading • Multiple buildings with Ridge Vents, Louvers, Doors & Insulation
Logistical Units/ Warehouse Location: Pune / Hissar Area (Sq.ft) : 5,00,000
Vijay Logistics Pvt Ltd
Key features • Very large Clear Span Building • Clear Heights 30 ft • Highly satisfied repeat customer
Location: Jaipur, Rajasthan Area (Sq.ft) : 1,03,296 Usage: Warehouse
Ericsson India Pvt Ltd
Key features • Jack beam provided to increase bay space to 49 ft • IS: Standard building with heavy collateral loads • Multiple buildings with Louvers, Doors, Ridge Vents and Insulation
Logistical Units/ Warehouse Location: Kolkata Area (Sq.ft) : 5,00,000
S B Overseas
Key features • Span of Building 72m (EMS-II) • Intermittent Lean-to along side-walls • Combination of ridge vents, Turbo vents & louvers for effective ventilation
Factory Building: Biscuit manufacturing Location:Bihar ,Odisha, Gujarat Area (Sq.ft) : 5,00,000
Britannia Industries Limited
Key features • Multi gable with 40 m clear span • A foolproof design for water discharge from the roof • A repeat customer with great satisfaction level
Factory Building: Cattle Feed Manufacturing Unit Location: Varanasi, Kanpur, Kharagpur & Kolasib (Mizoram) Area (Sq.ft) :10,17,384 Godrej Agrovet
Key features • 32m high process building • Challenging speciality cladding installation • Amalgams of intricate shaped Buildings- high bay & low bay formation
Factory Building: Tractor Manufacturing Unit Location: Patiala Area (Sq.ft) : 80,000
John Deere India Pvt Ltd
Key features • Stiff requirement for heavy Dead Loads, Deflection and jack Beam • Large building accessories like Roll-up Doors, Louvers, Windows, Insulation, Crane maintenance Platform and Lighting Arresters • Unique Cladding Pattern
Factory Building: Textile Factory Location: Barnala, Punjab Area (Sq.ft) : 3,00,000
Lotus Tech Park
Key features • Building designed for temperature load of + /- 30 degree • Structure arrangement for housing Air Humidifiers • Special arrangements to protect structure from rusting due to high humidity
Factory Building: Heavy Fabrication Factory Location: Asansol, West Bengal Area (Sq.ft) : 1,20,000 Mcnally Bharat Engg. Co. Ltd.
Key features • 50 MT crane in 4 spans (total 200 MT) • Ridge height – 77 ft • Mezzanine, Walkway, Roof monitor and other accessories
Factory Building: Electronics Parts Manufacturing Unit Location: Pune Area (Sq.ft) : 74,185 Ecorea & Kuroda Electric India Pvt Ltd
Key features • Ridge vent with S-type louvers • Curved Eaves • EMS-I Building with 12m high & collateral service loading
Factory Building: BOPP Manufacturing Unit Location: Kolkata Area (Sq.ft) : 85,810 Kalpana Industries
Key features • 78m width • Curved Roof • High bay- low bay with 20m & 14m respective heights
Factory Building: Factory for Valve Manufacturing Location: Nagpur, Maharashtra Area (Sq.ft) : 1,25,000
NSSL Limited
Key features • Curved Roof System • Multiple Crane and Mezzanine System (Total 71 Cranes) • Mezzanine floor intergrated
Factory Building: Manufacturing Units for Wires Location: Kolkata, West Bengal Area (Sq.ft) : 1,16,380
Nirmal Wires
Key features • Multiple Crane System with large span • EOT 5mt x 4 nos. with crane beams • All secondary members are pre-galvanized
Factory Building: Manufacturing for Heavy Electricals Location: Baroda, Gujarat Area (Sq.ft) :75,320
Jeumont Electric India Pvt Ltd
Key features • Heavy Cranes Load design (30MT x 4 nos., 20mt x 3 nos) • Insulated Roof and Wall Cladding System • Height 18 m clear
Factory Building: Factory for Automobile Filters Location: Bawal, Haryana Area (Sq.ft) : 95,000
Mann and Hummel Filters
Key features • Heavy collateral load with large spans • Stringent paint requirements for fire proofing • Gebriet Gutter System
Multistorey Building: Classrooms-Workshop- Laboratory Location: Mumbai Area (Sq.ft) : 30,600
IIT, Powai
Key features • G+3 Building • Laboratory & Office • EVEREST: Single point building supplier (Internal & External)
Multistorey Building: Food Processing Unit Location: Beawar, Rajasthan Area (Sq.ft) : 1,21,923
Kaveri Hire Purchase & Deposits Pvt Ltd
Key features • G+4 Building • Removable floors designed for Heavy Equipment Instllation • Over 110MT of vessel loading
Multistorey Building: Chemicals Manufacturing Unit Location: Sholapur, Maharashtra Area (Sq.ft) : 23,358
O. C. Specialities Pvt Ltd
Key features • Two nos of G+2 Industrial Buildings • Industrial Louvers all around • Over 1T/ sqm of Floor loading
Office/ Commercial Building: Education Institute Location: Lucknow, Uttar Pradesh Area (Sq.ft) : 55,000
Ansal API Limited
Key features
• 55,000 sq ft building within 90 days from the date of LOI • Smart Steel Product of 14 x 14 m2 span • Complete with false ceiling and partitions
Office/ Commercial Building: Retail Location: Amritsar, Meerut, Jalandhar, Raipur & Lucknow Area (Sq.ft) : 2,50,000
Bharti Walmart
Key features • Standing Seam Roofing and Puff panel wall Cladding System • Precise engineering to connect with RCC buildings • Designed to support heavy Air Conditioning and Utility Units from roof at different locations
Office/ Commercial Building: Office Location: Roorkee, Uttarakhand Area (Sq.ft) : 27,987
EVEREST Design Centre
Key features • G+2 Building • Entirely Built from EVEREST products • Setting an Example pf Green Building Solution
Speciality Building: Production Unit for Bearing Manufacturing Location: Dehradun, Uttarakhand Area (Sq.ft) : 13,944
ABC Bearings
Key features • Double skin insulation in complete building • Curved Eaves with ACP • Low VOC water base paint, Certified GREEN Building
Speciality Building: Lime stone Storage unit Location: Kolar, Karnataka Area (Sq.ft) : 67,812
ACC Ltd
Key features • 58m clear span • 25m clear height • Lower slope with Higher span
Speciality Building: Factory Location: Nalagarh, Himachal Pradesh Area (Sq.ft) : 1,19,320
B P Ergo
Key features • Certified Green Building • Full area mezzanine • 14m clear height with curved profile
THANKS