REPORT DATE:

CONTRACTOR'S ESTIMATE PACKAGE

02/09/18

50

CONTRACT ID: PROJECT: CONTRACT: AWARD AMOUNT: PROJECTED AMOUNT: ADJ. PROJECTED AMOUNT: CONTRACT: CONTRACTOR:

035901030 STP 2017(258) 11163005 $1,750,008.40 $1,853,512.40 $1,853,512.40 DEAN WORD COMPANY, LTD.

HIGHWAY: DISTRICT NAME: COUNTY: AREA ENGINEER: AREA NUMBER:

ESTIMATE NUMBER: ESTIMATE PAID: ESTIMATE PERIOD: ESTIMATE TYPE: % COMPLETE: % TIME USED: % RETAINAGE:

0011

LETTING DATE: AWARD DATE: NOTICE TO PROCEED DATE: WORK BEGIN DATE: ACCEPTED DATE: PHYSICAL WORK COMPLETION DATE:

12/26/2017 PROG 76.37 83.33 0.00

to

01/25/2018

SH 119 Yoakum DE WITT Rodney Svec, P.E. 058

11/03/2016 11/17/2016 12/12/2016 10/10/2017 00/00/0000 00/00/0000

RECAPITULATION TOTAL TO DATE

PREV TO DATE

THIS ESTIMATE

OTHER ADJUSTMENTS

$1,415,461.23 $0.00 $1,415,461.23 $0.00 $0.00 $0.00 $0.00 $0.00

$1,411,556.12 $0.00 $1,411,556.12 $0.00 $0.00 $0.00 $0.00 $0.00

$3,905.11 $0.00 $3,905.11 $0.00 $0.00 $0.00 $0.00 $0.00

PAID TO CONTRACTOR

$1,415,461.23

$1,411,556.12

$3,905.11

ITEM EARNINGS PARTICIPATING NON-PARTICIPATING RETAINAGE LIQUIDATED DAMAGES INCENTIVE DISINCENTIVE

CONTRACT ADJUSTMENTS THIS ESTIMATE

LINE ITEM ADJUSTMENTS THIS ESTIMATE

ADJUSTMENT DESCRIPTION: ADJUSTMENT AMOUNT: REMARKS:

ADJUSTMENT DESCRIPTION: ADJUSTMENT AMOUNT:

***There are no Contract Adjustments for this estimate***

***There are no Line Item Adjustments for this estimate***

CERTIFIED AS CORRECT AND ONE COPY HAS BEEN GIVEN TO THE CONTRACTOR

AREA/PROJECT ENGINEER

DATE

REMARKS:

CONTRACT ID

035901030

ESTIMATE

0011

Page 2 of 6

CONTRACTOR'S ESTIMATE PACKAGE

CONTRACT TIME STATEMENT WORK BEGIN DATE:

10/10/2017

ASSESSED LIQ DAMAGES:

0

TIME CHARGES BEGIN:

03/12/2017

LIQ DAMAGE RATE:

$785.00

BID DAYS:

60

C. O. ADJUSTED DAYS:

LIQUIDATED DAMAGES:

CURRENT DAYS:

60

DAYS CHARGED TO DATE:

50

PHYSICAL WORK COMPLETE:

0 DAYS

0

AT

PER DAY

TOTAL:

$785.00

$0.00

00/00/0000

DAILY BREAKDOWN Date

or

Days

12/26/2017 12/27/2017 12/28/2017 12/29/2017 12/30/2017 12/31/2017 01/01/2018 01/02/2018 01/03/2018 01/04/2018 01/05/2018 01/06/2018 01/07/2018 01/08/2018 01/09/2018 01/10/2018 01/11/2018 01/12/2018 01/13/2018 01/14/2018 01/15/2018 01/16/2018 01/17/2018 01/18/2018 01/19/2018 01/20/2018 01/21/2018 01/22/2018 01/23/2018 01/24/2018 01/25/2018

Days

Days

Charged

Credited

1 1 1 1 1 1 1 1 1 1 1 1 1

HOLIDAY TRAFFIC RAIN RAIN RAIN SATURDAY SUNDAY HOLIDAY TOO COLD TOO COLD TOO COLD TOO COLD SATURDAY SUNDAY

1 1 1 1 1 1 1 1 1 1

TOO COLD SATURDAY SUNDAY TOO COLD INCLEMENT WEATHER INCLEMENT WEATHER TOO COLD TOO COLD SATURDAY SUNDAY

1 1 1 1

1 1 1 1

PERIOD SUMMARY Diary Adjustment

Date Days

31

or

Days

Days

Charged

Credited

8

23

HOLIDAY HOLIDAY TRAFFIC OTHER - SEE RMRKS RAIN SATURDAY SUNDAY TOO COLD

1 1 2 3 4 4 8

CONTRACT ID

035901030

ESTIMATE

0011

Page 3 of 6

CONTRACTOR'S ESTIMATE PACKAGE

WORK PERFORMED THIS PERIOD PROJECT

STP 2017(258)

CONTROL

035901030

CATEGORY

001

DESCRIPTION

ROADWAY

LINE NBR

ITEM CODE

SP NBR

0115

05026001

000

DESCRIPTION

BARRICADES, SIGNS AND TRAFFIC HANDLING

UNIT

UNIT PRICE

MO

3,905.106

TOTAL ITEM EARNINGS THIS ESTIMATE

QTY THIS ESTIMATE

1.000

AMOUNT PAID THIS ESTIMATE

$3,905.11

$3,905.11

Total Bid Quantity

QTY Paid To Date

4.00

4.00

035901030

CONTRACT ID

ESTIMATE

0011

Page 4 of 6

CONTRACTOR'S ESTIMATE PACKAGE

CONTRACT LINE ITEMS PROJECT

STP 2017(258)

CONTROL

035901030

CATEGORY

001

DESCRIPTION

ROADWAY

LINE NBR

ITEM CODE

SP NBR

DESCRIPTION

UNIT

QTY PAID TO DATE

AMOUNT

0060

01346004

000

BACKFILL (TY A OR B)

STA

143.144

353.740

0070

03106012

000

PRIME COAT (RC-250)

GAL

3.075

5,896.000

0.000

199.00

28,485.66

0.000

3,220.00

0075

03166400

000

ASPH (AC-15P OR AC-10-2TR OR CRS-2P)

GAL

2.481

9,901.50

44,156.000

0.000

38,078.00

94,471.52

0080

03166249

000

AGGR(TY-PE GR-4 SAC-B)

CY

0085

03416039

000

D-GR HMA TY-D SAC-B PG64-22

TON

78.569

999.000

0.000

1,030.00

80,926.07

64.584

7,211.000

0.000

7,360.42

475,365.37

0090

03416042

000

D-GR HMA TY-D SAC-B PG70-22

0095

03516004

000

FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")

TON

61.954

10,799.000

0.000

6,460.40

400,247.63

SY

58.099

1,000.000

0.000

2,042.00

0100

03546041

000

118,638.16

PLANE ASPH CONC PAV (1.5")

SY

8.694

1,508.000

0.000

1,507.80

0105

03546064

13,108.81

000

PLANE ASPH CONC PAV (2 1/2")

SY

6.865

2,222.000

0.000

2,222.40

0110

15,256.78

05006001

000

MOBILIZATION

LS

165,079.514

1.000

0.000

0.90

148,571.56

0115

05026001

000

BARRICADES, SIGNS AND TRAFFIC HANDLING

MO

3,905.106

4.000

0.000

4.00

15,620.44

0130

06626032

000

WK ZN PAV MRK NON-REMOV (Y)4"(BRK)

LF

0.167

16,800.000

0.000

5,460.00

911.82

0135

06626034

000

WK ZN PAV MRK NON-REMOV (Y)4"(SLD)

LF

0.136

120,408.000

0.000

41,908.00

5,699.49

0140

06626111

000

WK ZN PAV MRK SHT TERM (TAB)TY Y-2

EA

1.214

8,286.000

0.000

6,801.00

8,256.42

SUPP DESCRIPTION

UNIT PRICE

BID QUANTITY

NET CO QUANTITY

Category Subtotal PROJECT

STP 2017(258)

CONTROL

035901030

CATEGORY

001

DESCRIPTION

ROADWAY BID QUANTITY

AMOUNT

0.000

0.000

0.00

0.000

0.000

0.00

149,212.000

0.000

0.000

0.00

0.303

74,606.000

0.000

0.000

0.00

LF

0.303

5,600.000

0.000

0.000

0.00

RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)

LF

0.303

39,606.000

0.000

0.000

0.00

000

PREFAB PAV MRK TY C (W) (18") (SLD)

LF

16.720

30.000

0.000

0.000

0.00

06686076

000

PREFAB PAV MRK TY C (W) (24") (SLD)

LF

22.990

22.000

0.000

0.000

0.00

0170

06726009

000

REFL PAV MRKR TY II-A-A

EA

4.180

776.000

0.000

0.000

0.00

0171

96016001

MATERIAL ON HAND

DOL

1.000

1.000

0.000

0.000

0.00

0172

96026001

PAYMENT ADJUSTMENT-POS

DOL

1.000

1,000.000

0.000

0.000

0.00

0173

96026002

PAYMENT ADJUSTMENT-NEG

DOL

-1.000

1,000.000

0.000

0.000

0.00

0174

03416059

PRODUCTION PAYMENT ADJUSTMENT

DOL

1.000

34,000.000

0.000

0.000

0.00

0176

03416060

PLACEMENT PAYMENT ADJUSTMENT

DOL

1.000

34,000.000

0.000

0.000

0.00

0177

05856002

RIDE PAYMENT ADJUSTMENT (ITEM 341)

DOL

1.000

34,000.000

0.000

0.000

0.00

0178

96106001

ON THE JOB TRAINING

DOL

1.000

1.000

0.000

0.000

0.00

LINE NBR

ITEM CODE

SP NBR

DESCRIPTION

0065

01506002

000

BLADING

HR

123.387

10.000

0120

05336002

000

RUMBLE STRIPS (CENTERLINE)

LF

0.178

34,982.000

0125

06626004

000

WK ZN PAV MRK NON-REMOV (W)4"(SLD)

LF

0.094

0145

06666302

000

RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)

LF

0150

06666311

000

RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)

0155

06666314

000

0160

06686075

0165

NET CO QUANTITY

$1,415,461.23

QTY PAID TO DATE

UNIT

UNIT PRICE

$

SUPP DESCRIPTION

Category Subtotal

($)

0.00

035901030

CONTRACT ID CATEGORY

ESTIMATE

002

0011

DESCRIPTION

Page 5 of 6

CONTRACTOR'S ESTIMATE PACKAGE

CONTRACTOR FORCE ACCOUNT WORK UNIT

UNIT PRICE

FORCE ACCT-EROSION CONTROL MAINTENANCE

DOL

1.000

500.000

FORCE ACCOUNT - SAFETY CONTINGENCY

DOL

1.000

1,000.000

96046001

CONTRACTOR FORCE ACCOUNT 1

DOL

1.000

96046002

CONTRACTOR FORCE ACCOUNT 2

DOL

1.000

LINE NBR

ITEM CODE

0179

96066055

0181

96066056

0182 0183

SP NBR

DESCRIPTION

BID QUANTITY

NET CO QUANTITY

QTY PAID TO DATE

AMOUNT

0.000

0.000

0.00

0.000

0.000

0.00

1.000

0.000

0.000

0.00

1.000

0.000

0.000

0.00

SUPP DESCRIPTION

Category Subtotal

TOTAL ITEM EARNINGS THIS CONTRACT

($)

0.00

$1,415,461.23

CONTRACT ID

035901030

ESTIMATE

0011

Page 6 of 6

CONTRACTOR'S ESTIMATE PACKAGE

CONSTRUCTION ESTIMATE COMBINED ITEM CODE

SP NBR

DESCRIPTION

UNIT

UNIT PRICE

BID QUANTITY

01346004

000

BACKFILL (TY A OR B)

STA

143.140

353.74

199.000

03106012

000

PRIME COAT (RC-250)

GAL

3.080

5,896.00

3,220.000

9,901.50

03166249

000

AGGR(TY-PE GR-4 SAC-B)

CY

78.570

999.00

1,030.000

80,926.07

03166400

000

ASPH (AC-15P OR AC-10-2TR OR CRS-2P)

GAL

2.480

44,156.00

38,078.000

94,471.52

03416039

000

D-GR HMA TY-D SAC-B PG64-22

TON

64.580

7,211.00

7,360.420

475,365.37

03416042

000

D-GR HMA TY-D SAC-B PG70-22

TON

61.950

10,799.00

6,460.400

400,247.63

03516004

000

FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")

SY

58.100

1,000.00

2,042.000

118,638.16

03546041

000

PLANE ASPH CONC PAV (1.5")

SY

8.690

1,508.00

1,507.800

13,108.81

03546064

000

PLANE ASPH CONC PAV (2 1/2")

SY

6.870

2,222.00

2,222.400

15,256.78

05006001

000

MOBILIZATION

LS

165,079.510

1.00

0.900

148,571.56

05026001

000

BARRICADES, SIGNS AND TRAFFIC HANDLING

MO

3,905.110

4.00

4.000

15,620.44

06626032

000

WK ZN PAV MRK NON-REMOV (Y)4"(BRK)

LF

0.170

16,800.00

5,460.000

911.82

06626034

000

WK ZN PAV MRK NON-REMOV (Y)4"(SLD)

LF

0.140

120,408.00

41,908.000

5,699.49

06626111

000

WK ZN PAV MRK SHT TERM (TAB)TY Y-2

EA

1.210

8,286.00

6,801.000

8,256.42

TOTAL ITEM EARNINGS TO DATE

QTY PAID TO DATE

AMOUNT ($)

28,485.66

$1,415,461.23