CONSTRUCTION MONTHLY PROGRESS REPORT Reporting Period: April 01- April 30, 2014 IQC Basic Contract No.: AID-294-I-00-12-00003 Task Order Contract No.: AID - 294 - TO - 13 - 00018 WELLS REHABILITATION PROJECT-WER
May 05, 2014 This publication was produced for review by the United States Agency for International Development. It was prepared by IRD.
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
CONSTRUCTION MONTHLY PROGRESS REPORT Reporting Period: April 01-April 30, 2014 PROJECT 1-ARRABA WELL PUMP STATION-ARW
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government.
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Table of Contents 1.
Arraba Well (ARW) Dashboard Status ............................................................................................ 3
2.
Public Relation and Outreach ......................................................................................................... 4
3.
Safety and Environmental Status.................................................................................................... 4
4.
Security Coordination ..................................................................................................................... 7
5.
Material or Equipment Delivered to Site ........................................................................................ 8
6.
Progress and Scheduling ................................................................................................................. 8
7.
Submittal Status:............................................................................................................................. 9
8.
Construction Activities .................................................................................................................. 10
9.
Updated Schedule......................................................................................................................... 10
10. Site Memos ................................................................................................................................... 11 11. Inspection Requests ...................................................................................................................... 11 12. Test Reports .................................................................................................................................. 11 13. Request for Information ............................................................................................................... 12 14. Summary of Payments and Accrued Expenditures....................................................................... 12 15. Variation Orders and Variation Order Requests ........................................................................... 12 16. Operation, Maintenance and Training ......................................................................................... 13 17. Risk Management and Mitigation Measures................................................................................ 13 18. Summary of Working/Non-Working Days .................................................................................... 14 19. Project Indicators .......................................................................................................................... 14 20. General Comments ....................................................................................................................... 15 21. Construction Photos ..................................................................................................................... 16
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 2
TO-13-00018 (WER) April 2014, Construction Monthly Report International Relief and Development, Inc. (IRC)
1.
Arraba Well (ARW) Dashboard Status
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 3
TO-13-00018 (WER) April 2014, Construction Monthly Report International Relief and Development, Inc. (IRC)
2.
Public Relation and Outreach
Public relations and outreach activities during the current reporting period included: • • • •
Taking photos that show the activities at the project site; Coordination with WBWD. Coordination with Israeli archeological department regarding excavations. Site visits by BV, WBWD and USAID.
3. Safety and Environmental Status
The Safety Plan and the Environmental Monitoring and Mitigation plan were approved by the CMC. Moreover, the Engineer’s site office was furnished with the first aid kit and the two fire extinguishers (one carbon and one CO2).
Traffic Management: Traffic plan for Arraba project had been submitted and approved. Safety Meeting: Safety meetings were conducted with IRD Subcontractor to improve the existing safety program and to create increased awareness of the Subcontractor’s responsibilities for the health and safety of their workers (unless there are no activities onsite during the current reporting period). • Arraba Well: two toolbox meetings were conducted during the month of April 2014. Environmental Status Environmental Status was checked on daily basis, no environmental issues occurred during the reporting period. Accident Status: During the current reporting period (0) accident occurred. The accident statistics for the month of April 2014 can be summarized as follows: Particulars First Aid Cases Lost Time Cases Total Hours Lost
Current Month 0 0 0
Notice of Unsafe Condition: No NUC`s were issued during the reporting period. Safety Conclusion: The current level of safety is satisfactory with respect to the current work force and progress on site. DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 4
Safety Photos:
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Safety tool box meeting-ARW
Alternative road for field offices-ARW
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 5
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Compacting and spraying water for the alternative road to prevent dust-ARW
Installing fence and gate -ARW
Taking water sample-ARW
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 6
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Installing fence with warning tape for trench protection-ARW
Installing warning light for the equipment-ARW
Removing the lose material from top of the excavated area-ARW
Flagman to control equipment movement-ARW
Spraying water to control the dust-ARW
4. Security Coordination
IRD security coordinator organized several meetings with Jenin DCL and Bet El regarding security coordination for the project, the following table provides a
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 7
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
summary of the security coordination activities and meetings carried out during the current reporting period: Date
Attendees
April 1, 2014
Archeology office
April 6, 2014
Site visit to Arraba/IRD security coordinator and archeology officer
April 28, 2014
Jenin DCL
April 28, 2014
Jenin Palestinian DCO
Purpose Meeting with the archeology commander regarding Arraba Well, a site visit had been agreed on the 3rd or the 6th of April 2014. Site visit to Arraba with the archeology officer and Jenin DCL. (done with them) Meeting with Jenin DCL to provide updates regarding Wells projects progress Meeting with the Palestinian DCO, updating them about the progress of the Wells Project
Table 4.1-ARW-Security Coordination Summary
5. Material or Equipment Delivered to Site
Please find attachment No. 22.4 Material and Equipment Delivered to Site.
6. Progress and Scheduling
The following table provides a summary of the project progress status: Item Planned percentage complete Actual percentage complete Elapsed Time Table 6.1-ARW-Progress Summary Table
Percentage 20.41% 8.87% 34.55%
Project Overall Status: The Actual total float for Arrabeh Well Project is -86 CD as of the end of April 2014. We are still behind the schedule and a recovery plan to make up delays is being prepared and will be finalized by May 30, 2014. Reasons behind such a negative float are: - Delays in entering of testing pumps from Jordan which directly affected the early start of ARW development; - The initial yield testing of ARW (as per RFI#5) took us more than we planned as well as an additional time we spent to clean ARW well down hole due to unexpected level of the accumulated mud and sediment; - The geophysical logging results were submitted on March 23, 2014 and as of today not yet approved and this is directly related to start counting 120 cd days required for the engineer’s review of the logging results and the pumps procurement (gyroscopic log and water sampling); IRD is developing a recovery plan assuming that the entire 120 days design review will be utilized by BV. The most critical activity in the schedule is the pumps and related equipment procurement; and we have agreed that IRD will continue looking for other options to minimize the procurement time and is working into the possibility of changing the procurement plan to recapture project delays. IRD is intensively working to have an alternative proposal for pumps procurement from an Israeli pumps manufacturer. DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 8
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
During this reporting period, and after applying all necessary safety, environmental measures and mitigation and dust control on site, excavations for the reduced level and finish ground level were completed for the extended area only. Excavations for the retaining wall foundations and footing are partially completed including subgrade layer spreading, compaction and testing. Formwork and reinforcement steel bars were also delivered to site. On the other hand, , and in conjunction with the revised development plan at Sanur well, main power supply (utility) is adjusted and stand-by power supply (Generator) and relevant electrical works and control modifications were performed as an additional requirement, to increase pumping hours from Arraba well. Construction submittals and shop drawings regarding civil works are slightly lagging the schedule; however, intensive efforts are constantly made in close follow up with the subcontractor to make up the existing delays. For further details regarding the project progress, please see Attachment ARW 22.1Updated Schedule Roll Up.
7. Submittal Status:
During the current reporting period a total of 67 submittals (including resubmittals) were delivered under TO-18-WER including three retracted submittals; 17 submittals were submitted under SUB-18-ARW (for Arrabeh Well separately); 7 submittals were submitted under SUB-18-SNW (for Sanur Well separately); one submittal was submitted under SUB-18-SDW (for Saadeh Well separately) and 42 submittals were submitted under SUB-18-WER. Review comments were received for 54 submittals out of the 67 submittals. Total response time from the CMC was between 1 to 18 days. The following table and graph provide a summary of the submittals disposition status. Submittal Disposition
Total
5 42 6 1 0 3 67 54 10
A – No Exceptions Noted B - Make Corrections Noted C- Amend and Resubmit D- Rejected- Resubmit E- Review Not Required Retracted submittals Total submittals delivered Total submittals reviewed Submittals delivered not reviewed
Table 7.2-WER-Submittal Disposition
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 9
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Figure 7.1-WER-Submittals Disposition Analysis
For further details, please see attachment ARW 22.6- Submittal Log
8. Construction Activities-completed this month and planned for the next month 8.1 The following was achieved during the current reporting period: • Excavation works and reducing levels down to the finish level. • Bearing capacity tests verified for the retaining walls & balancing tank at the design formation levels. • Excavations for the retaining wall foundations. • Executing stand-by power supply and relevant works according to CMC instructions. • Construction submittals and shop drawings preparation. 8.2 • • • • •
The following are the main activities planned for next month: Form work of retaining wall. Concrete casting of retaining wall footing and walls. Excavations for balance tank and under-drain system installation. Continue preparation of construction submittals and shop drawings. Coordination with WBWD (West Bank Water Department).
9. Updated Schedule
Please see Attachment ARW 22.1- updated schedule roll up & one-month look ahead.
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 10
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
10. Site Memos
No site memos were issued for this project during the current reporting period. For further details, please see Attachment ARW 22.3- Site Memo Log.
11. Inspection Requests
During the current reporting period, 10 inspection requests were submitted to the Engineer including resubmitted inspections, eight for Arraba project and two for Sanur project. For further details, please see Attachment ARW 22.5- Inspection Request Log.
12. Test Reports
Thirteen test reports had been conducted and submitted under TO-18-WER during the current reporting period, the engineer responded to 11 tests however, one test result is still pending and one test submittal was retracted as follows:
Type of Material Test
No. of Tests Passed
No. of Tests Failed
No. of Tests (Results Not Received)
Retracted
Total No. of Tests Conducted
Remarks
Reinforcement Steel Bars
3
3
Submitted as SUB-00018-WER147-B & SUB-00018-ARW-236-A
Compaction
1
1
SUB-00018-ARW-239-A
4
SUB-00018-WER-193-A ( Retracted), SUB-00018-WER193-A, SUB-00018-WER-198-A & SUB-00018-WER-234-A
Concrete Compressive Strength
2
Natural Sand
1
1
SUB-00018-WER-222-A
Backfill Material
2
2
SUB-00018-WER-224-A & SUB00018-WER-226-A
Soil Confirmation
2
2
SUB-00018-ARW-225-A & SUB00018-ARW-232-A
Total
1
11
1
1
1
13
Table 12.1-WER QC Analysis Table
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 11
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Figure 12.1-WER QC Analysis Bar Chart
13. Request for Information
During the current reporting period, three Requests for Information (RFI) were submitted to the CMC under TO-18-WER. One under TO-18-SNW (Sanur separately) and two for Arraba and Sanur. For further information regarding the submitted RFIs, please see Attachment ARW 22.7-Request for Information Log.
14. Summary of Payments and Accrued Expenditures
IRD submitted its third payment under Task Order No. 13-00018 / INP II on April 29, 2014, which is still under CMC review. This payment covers the period from February 07 to April 20, 2014.
Payment No.
3
Period of Performance Quantity Period From
Period To
Feb.06, 14
Apr.20, 14
Current Payment Amount
Previous
Cumulative to date
Payment Submission Date
CMC Approval Date
Date Payment Received
227,135.36
248,264.99
475,400.35
Apr. 29, 14
-
-
Table 14.1-ARW-Payment Summary
Accrued expenditures for Task Order 13-00018-ARW= $578,367.63 -$ 475,400.35 =$ 102,967.28.
15. Variation Orders and Variation Order Requests
NO Variation Orders or Variation Order Requests were issued for this project during the current reporting period.
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 12
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
16. Operation, Maintenance and Training
This section is not applicable for the current reporting period
17. Risk Management and Mitigation Measures
The following table summarizes the risks encountered for this project during the current reporting period: Risk
Description
Responsible Party
Remedial Measures/Comments
IRD
During the excavation process, the contractor took all safety measures to avoid hitting or damaging these utilities and coordinated with local authorities to figure out the location of such utilities. Crossing the excavated area of the RW has been supported by steel supporting jacks to avoid bending and breaking of the 10" pipe during pumping process.
Interruption or damage of underground utilities
The risk lays during excavation work and demobilization to hit or damage the underground utilities such as 10" pipe, and the buried electric cables
Construction activities in energized environment
This is an existing pumping station where power supply and electric boards shall be maintained according to contract until the last phase of construction
IRD
All power cables were isolated and protected. Tag-out lockout procedure on electric boards is implemented.
Fall of pump and pipes during Performance test
Due to the water hammer while turning the pump on and off, vibration and back pressure could cause the pump and the column pipes to fall inside the well
IRD
Closed.
Due to the age and conditions of the PWA Vertical turbine pump, it might not work properly
IRD
Closed.
Archeological discoveries
The risk lays if there is any archeological places in the excavation area
IRD
Closed.
Soil movement or sliding of the cliff
The risk of sliding of cliff or soil movement during excavation works and construction works
IRD
Existing VLST pump fall during re-installation or would not work properly after re-installation
Closed.
For more details, please refer to Attachment No. ARW 22.10 Risk Register Table.
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 13
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
18. Summary of Working/Non-Working Days
The following table provided a summary of the Working/ Non-Working Days for the project. 1.
Total Period of Performance (Original)
2.
Total Excusable delays/approved extensions
None
3.
Modified Period of Performance
None
4.
Modified Completion Date
None
5.
No. of Working Days
26 Calendar Days
6.
Accumulated Working Days Total No. of non-working days(Holidays and weekends) Accumulated non-working days (Holidays and weekends)
162 Calendar Days
9.
No. of other non-working days during this month
0 Calendar Days
10.
Accumulated other non-working days
4 Calendar Days
7. 8.
550 Calendar Days
4 Calendar Days 24 Calendar Days
Table 18.1-ARW-Summary of Working/ Non-Working Days
19. Project Indicators 19.1 Indicator #1: Quantity of drinking water available as a result of USG assistance Target Value for Project 1: The capacity of the added facility in cubic meters or the volume of water that will be pumped by the new station. The average consumption rate of Palestinians (per capita) for Jenin Governorate (Calculation based on the Palestinian water authority , the total quantity of water delivered to Jenin Governorate is 4,252,438 for 2011 and no. of population of 285,477)
120 cubic meter per hour = 2,880 m3 per day
(4,252,438)m3/365 day/(285,477 capita) = 0.041 m3/capita /day = 41 L/Capita/Day
No. of Beneficiaries
2,880/0.041 = 70,244 capita
Table 19.1-ARW-Target Value for Project 1
19.2 Indicator #2: Person days of Employment Generated The following is the employment generated in Person days for Project 1 during the reporting period: Estimated Target Value: 22,485.50 person days; Employment generated previously: 1624 person days; Employment generated this month: 547 person days; Total cumulative employment generated to-date: 2171 person days. DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 14
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
20. General Comments, Arisen Issues, Risks and Problems Encountered
Due to instability of the existing utility power supply, there was a risk that the power supply fluctuations might disturb the process of conveying water from Araaba well to Sanur well during well development. The WBWD requested to provide a stand-by power supply at Arraba well site as a condition prior to shutdown of Sanur well. Accordingly, and as per the Engineer’s instructions, the contractor provided a generator set with required control and instrumentation to integrate the stand-by generator with the existing power utility.
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 15
21. Construction Photos
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Photo Date- 1st of April, 2014: excavation to the reduced level.
Photo Date- 6th of April, 2014: Excavation of the suspected area with the archeological department presence
Photo Date- 9th of April, 2014: Inspection of reduced level excavation.
Photo Date- 10th of April, 2014: Excavation and surveying works for finish ground level
Photo Date- 10th of April, 2014: Site visit by WBWD.
Photo Date- 10th of April, 2014: Soil visual inspection.
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 16
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Photo Date- 15th of April, 2014: Taking samples for retaining wall bearing capacity test.
Photo Date- 15th of April, 2014: Taking samples for backfill materials.
Photo Date- 17th of April, 2014: Stand-by power supply preparations.
Photo Date- 17th of April, 2014: USAID site visit.
Photo Date- 20th of April, 2014: Preparation of alternative passage to field offices.
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 17
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Photo Date- 23rd of April, 2014: Start excavation works for retaining wall foundations.
Photo date- 24th of April, 2014: Dust control.
Photo date- 26th of April, 2014: Compaction of retaining wall subgrade.
Photo date- 26th of April, 2014: Formwork delivery to site.
Photo date- 26th of April, 2014: Base course delivery to site.
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 18
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Photo date- 27th of April, 2014: Safety canvas to prevent loose materials falling.
Photo date- 27th of April, 2014: Steel bars testing.
Photo date- 28th of April, 2014: Taking proctors for compaction test (retaining wall construction).
Photo date- 30th of April, 2014: Spreading base coarse layer for retaining wall foundations.
Photo date- 30th of April, 2014: Compaction of base course layers.
Photo date- 30th of April, 2014: Safety tool box meeting.
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 19
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
CONSTRUCTION MONTHLY PROGRESS REPORT Reporting Period: April 01-April 30, 2014
PROJECT 2-SANUR WELL PUMP STATION-SNW
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 20
Table of Contents
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
1.
Sanur Well (SNW) Dashboard Status ............................................................................................ 22
2.
Public Relation and Outreach ....................................................................................................... 23
3.
Safety and Environmental Status.................................................................................................. 23
4.
Security Coordination ................................................................................................................... 26
5.
Material or Equipment Delivered to Site ...................................................................................... 27
6.
Progress and Scheduling ............................................................................................................... 27
7.
Submittal Status ............................................................................................................................ 27
8.
Construction Activities .................................................................................................................. 28
9.
Updated Schedule......................................................................................................................... 29
10. Site Memos ................................................................................................................................... 29 11. Inspection Requests ...................................................................................................................... 29 12. Test Reports .................................................................................................................................. 29 13. Request for Information ............................................................................................................... 30 14. Summary of Payments and Accrued Expenditures....................................................................... 30 15. Variation Orders and Variation Order Requests ........................................................................... 30 16. Operation, Maintenance and Training ......................................................................................... 30 17. Risk Management and Mitigation Measures................................................................................ 30 18. Summary of Working/Non-Working Days .................................................................................... 31 19. Project Indicators .......................................................................................................................... 31 20. General Comments ....................................................................................................................... 32 21. Construction Photos ..................................................................................................................... 32
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 21
TO-13-00018 (WER) April 2014, Construction Monthly Report International Relief and Development, Inc. (IRC)
1. Sanur Well (SNW) Dashboard Status
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 22
TO-13-00018 (WER) April 2014, Construction Monthly Report International Relief and Development, Inc. (IRC)
2. Public Relation and Outreach
Public relations and outreach activities during the current reporting period included: • • • •
Taking photos that show the activities at the project site; Coordination with WBWD regarding the shutdown of the well. Site visits by B.V main office and USAID. Coordination with landowners regarding disposal of water pumped during well development.
3. Safety and Environmental Status
The Safety Plan and the Environmental Monitoring and Mitigation plan were approved by the CMC. Moreover, the Engineer’s site office was furnished with the first aid kit and the two fire extinguishers (one carbon and one CO2).
Traffic Management: Traffic plan for Sanur project is not submitted to CMC yet. Safety Meeting:
Safety meetings were conducted with IRD Subcontractor to improve the existing safety program and to create increased awareness of the Subcontractor’s responsibilities for the health and safety of their workers (unless there are no activities onsite during the current reporting period). •
Sanur Well: three toolbox meetings were conducted during the month of April 2014.
Environmental Status Environmental Status was checked on daily basis; after removal of the existing VLST pump from the well, IRD performed removal of the accumulated lubrication oil from the borehole by means of a special pump. The removed oil is collected in plastic containers as shown in the pictures in order to be treated later on in a way that will not harm the environment. Accident Status: During the current reporting period (1) accident occurred. On April 25, 2014 an employee injured his finger on the right hand while he was trying to close the swivel hook. The accident statistics for the month of April 2014 can be summarized as follows: Particulars First Aid Cases Lost Time Cases Total Hours Lost
Current Month 1 0 0
Notice of Unsafe Condition: No NUC`s were issued during the reporting period.
DISCLAIMER:
The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 23
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Safety Conclusion: The current level of safety is satisfactory with respect to the current work force and progress on site. Safety Photos
Safety Tool Box Meeting-SNW
Safety Site Preparation-SNW
Applying Safety Measures -SNW
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 24
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Applying Safety Measures on The water Tank-SNW
Disinfection for the Water Tank By Specialist-SNW
Extracted Oil From The Well-SNW
Extracted Oil From The Well-SNW
Extracted Oil From The Well-SNW
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 25
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Fill The Extracted Oil In Container To be Transfer To Albareeq Company For Treatment-SNW
Transferring The Oil From The Site-SNW
Extracted Oil been Delivered To Albareeq Company
4. Security Coordination
IRD security coordinator organized several meetings with Jenin DCL and Bet El regarding security coordination for the project, the following table provides a
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 26
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
summary of the security coordination activities and meetings carried out during the current reporting period: Date
Attendees
April 28, 2014
Jenin DCL
April 28, 2014
Jenin Palestinian DCO
Purpose Meeting with Jenin DCL to provide updates regarding Wells projects progress Meeting with the Palestinian DCO, updating them about the progress of the Wells Project
Table 4.1-SNW-Security Coordination Summary
5. Material or Equipment Delivered to Site
Please find attachment No. 22.4 Material and Equipment Delivered to Site.
6. Progress and Scheduling
The following table provides a summary of the project progress status Item Planned percentage complete Actual percentage complete Elapsed Time Table 6.1-SNW-Progress Summary Table
Percentage 10.49% 4.14% 34.55%
Project Overall Status: During the current reporting period, mobilization of rig and equipment was inspected by CMC on April 03, 2014 (Ref. IR-13-00018-SNW-C-E004-B) and all safety and environmental measures were performed. Well is taken out of service on 19th of April, 2014 (from 2nd of April until 19th of April works are on hold due to postponement of shutting down the well by the owner). On the same day of well shutdown, pulling out of existing VLST pump started and ended on 23 April, 2014. A revised work plan for well development was submitted to the engineer including additional works to maintain pumping to affected communities during well shutdown. First stage of airlifting and jetting conducted and interrupted due to clogging of the well by an earlier fallen strainer (seen after conducting video logging). According to CMC instructions, preparation works to fish the fallen strainer started on 29th of April 2014. Preparation of construction submittals is ongoing. For further details regarding the project progress, please see Attachment SNW 22.1Updated Schedule Roll Up.
7. Submittal Status
During the current reporting period a total of 67 submittals (including resubmittals) were delivered under TO-18-WER including three retracted submittals; 17 submittals were submitted under SUB-18-ARW (for Arrabeh Well separately); 7 submittals were submitted under SUB-18-SNW (for Sanur Well separately); one submittal was submitted under SUB-18-SDW (for Saadeh Well separately) and 42 submittals were submitted under SUB-18-WER. Review comments were received for 54 submittals out of the 67 submittals. Total response time from the CMC was between 1 to 18 days. The following table and graph provide a summary of the submittals disposition status.
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 27
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Submittal Disposition
Total
5 42 6 1 0 3 67 54 10
A – No Exceptions Noted B - Make Corrections Noted C- Amend and Resubmit D- Rejected- Resubmit E- Review Not Required Retracted submittals Total submittals delivered Total submittals reviewed Submittals delivered not reviewed
Table 7.2-WER-Submittal Disposition
Figure 7.1-WER-Submittals Disposition Analysis
For further details, please see attachment SNW 22.6- Submittal Log
8. Construction Activities-completed this month and planned for the next month 8.1 • • • •
The following was achieved during the current reporting period: Rig mobilized to the site, and safety preparations completed. Removal of the existing pump and accessories completed. First stage of airlifting and jetting (until 385 m bpl). Auxiliary preparation (piping arrangement and Balance Tank installation) to maintain pumping of water to communities completed.
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 28
• •
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Fishing of the earlier fallen strainer started. Construction submittals and shop drawings preparation and submitting is ongoing.
8.2 The following are the main activities planned for next month: • Continue well development activities. • Continue preparation and submission of construction submittals and shop drawings. • Coordination with WBWD.
9. Updated Schedule
Please see Attachment SNW 22.1- updated schedule roll up & one-month look ahead.
10. Site Memos
Two site memos were issued for this project during the current reporting period. For further details, please see Attachment SNW 22.3- Site Memo Log.
11. Inspection Requests
During the current reporting period, 10 inspection requests were submitted to the Engineer including resubmitted inspections, eight for Arraba project and two for Sanur project. For further details, please see Attachment SNW 22.5- Inspection Request Log.
12. Test Reports
Thirteen test reports had been conducted and submitted under TO-18-WER during the current reporting period, the engineer responded to 11 tests however, one test result is still pending and one test submittal was retracted as follows: Type of Material Test
No. of Tests Passed
No. of Tests Failed
No. of Tests (Results Not Received)
Retracted
Total No. of Tests Conducted
Remarks
Reinforcement Steel Bars
3
3
Submitted as SUB-00018-WER147-B & SUB-00018-ARW-236-A
Compaction
1
1
SUB-00018-ARW-239-A
4
SUB-00018-WER-193-A ( Retracted), SUB-00018-WER193-A, SUB-00018-WER-198-A & SUB-00018-WER-234-A SUB-00018-WER-222-A
Concrete Compressive Strength
2
Natural Sand
1
1
Backfill Material
2
2
Soil Confirmation
2
2
Total
1
11
1
1
1
SUB-00018-WER-224-A & SUB00018-WER-226-A SUB-00018-ARW-225-A & SUB00018-ARW-232-A
13
Table 12.1-WER QC Analysis Table
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 29
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Figure 12.1-WER QC Analysis Bar Chart
13. Request for Information
During the current reporting period, three Requests for Information (RFI) were submitted to the CMC under TO-18-WER. One under TO-18-SNW (Sanur separately) and two for Arraba and Sanur. For further information regarding the submitted RFIs, please see Attachment SNW 22.7-Request for Information Log.
14. Summary of Payments and Accrued Expenditures
No payments had been submitted during the reporting period. Accrued expenditures for Task Order 13-00018-SNW= $290,012.85 -$ 267,094.93 =$22,917.92.
15. Variation Orders and Variation Order Requests
NO Variation Order or Variation Order Request were issued for this project during the current reporting period.
16. Operation, Maintenance and Training
This section is not applicable for the current reporting period
17. Risk Management and Mitigation Measures
The following table summarizes the risks encountered for this project during the current reporting period:
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 30
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Risk
Description
Responsible Party
Postponement of Sanur well shut down by the client, which will result in delays to pull out the existing well pump.
As per coordination with WBWD, it was scheduled to take Sanur well out of service on 29th of Mar, 2014, but WBWD postponed turning off the well to 31St of Mar, 2014. However, on 31st of Mar 2014, WBWD did not shut down the well due to objection from benefited Municipalities. This will cause delays in pulling out existing vertical lines shaft well pump, hence delays in performed the completely well development process.
Remedial Measures/ Comments
WBWD
Closed.
For more details, please refer to Attachment No. SNW 22.10 Risk Register Table.
18. Summary of Working/Non-Working Days
The following table provided a summary of the Working/ Non-Working Days for the project. 1.
Total Period of Performance (Original)
2.
Total Excusable delays/approved extensions
None
3.
Modified Period of Performance
None
4.
Modified Completion Date
None
5.
No. of Working Days
26 Calendar Days
6.
Accumulated Working Days Total No. of non-working days (Holidays and weekends) Accumulated non-working days (Holidays and weekends)
159 Calendar Days
9.
No. of other non-working days during this month
0 Calendar Days
10.
Accumulated other non-working days
4 Calendar Days
7. 8.
550 Calendar Days
4 Calendar Days 27 Calendar Days
Table 18.1-SNW-Summary of Working/ Non-Working Days
19. Project Indicators
19.1 Indicator #1: Quantity of drinking water available as a result of USG assistance Target Value for Project 2: The capacity of the added facility in cubic meters or the volume of water that will be pumped by the new station. The average consumption rate of Palestinians (per capita) for Jenin Governorate (Calculation based on the Palestinian water authority , the total quantity of water delivered to Jenin Governorate is 4,252,438 for 2011 and no. of population of 285,477) No. of Beneficiaries
150 cubic meter per hour = 3,600 m3 per day
(4,252,438)m3/365 day /(285,477 capita) = 0.041 m3/capita /day = 41 L/Capita/Day
3,600/0.041 = 87,805 capita
Table 19.1-SNW-Target Value for Project 2 DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 31
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
19.2 Indicator #2: Person days of Employment Generated The following is the employment generated in Person days for Project 2 during the reporting period: Estimated Target Value: 20,208.50 person days; Employment generated previously: 778 person days; Employment generated this month: 716 person days; Total cumulative employment generated to-date: 1494 person days.
20. General Comments, Arisen Issues, Risks and Problems Encountered
Clogging of the well at a depth of 386 m bpl by an earlier fallen strainer. The contractor is instructed by the engineer to conduct fishing of the fallen strainer. A VOR is submitted to the Engineer in this regard.
21. Construction Photos
Photo Date: 2rd of April, 2014: Equipment, site and safety preparations prior to dismantling of old pump and well development.
Photo Date: 16th of April, 2014: Additional piping and storage preparations to serve affected communities during well shutdown.
Photo Date- 17th of April, 2014: USAID site visit.
Photo Date- 19th of April, 2014: Sanur well shutdown, and start of equipment and pump removal..
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 32
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Photo Date- 19th of April, 2014: Sanur well shutdown, and start of equipment and pump removal.
Photo Date- 20th of April, 2014: Installation of temporary control panel for booster operation.
Photo Date- 21st of April, 2014: Conducting tool safety box meeting.
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 33
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Photo Date- 23rd of April, 2014: Finishing pulling out existing VLST pump and accessories.
Photo Date- 24th of April, 2014: Oil removal from borehole.
Photo Date- 24th of April, 2014: Installation of jetting pipes (airline).
Photo Date- 25th of April, 2014: Conducting jetting.
Photo Date- 25th of April, 2014: Start installation of airlifting educator pipes.
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 34
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Photo Date- 27th of April, 2014: Well development by airlifting.
Photo Date- 28th of April 2014: Video logging to Photo Date- 29th of April 2014: Fishing tool explore the clogging at depth of 386m bpl. (Earlier fabrication. fallen strainer were found clogging the 12” casing).
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 35
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Photo Date- 30th of April, 2014: Measuring static Photo date- 30th of April, 2014: Safety tool box meeting. water level.
Photo Date- 30th of April, 2014: Starting fishing Photo Date- 30th of April, 2014: Transfer of of earlier fallen strainer. removed oil from the well site for treatment.
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 36
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
CONSTRUCTION MONTHLY PROGRESS REPORT Reporting Period: April 01-April 30, 2014 PROJECT 3-SAADEH WELL REHABILITATION-SDW
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 37
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Table of Contents 1.
SAADEH WELL (SDW) DASHBOARD STATUS.................................................................... 39
2.
PROGRESS AND SCHEDULING ............................................................................................... 40
3.
SUBMITTAL STATUS: .................................................................................................................... 40
4.
UPDATED SCHEDULE ................................................................................................................. 40
5.
SUMMARY OF PAYMENTS AND ACCRUED EXPENDITURES.................................... 40
6.
PROJECT INDICATORS ................................................................................................................ 41
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 38
TO-13-00018 (WER)- March 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
1.
Saadeh Well (SDW) Dashboard Status
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 39
TO-13-00018 (WER)- March 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
2. Progress and Scheduling
The following table provides a summary of the project progress status Item Planned percentage complete Actual percentage complete Elapsed Time Table 2.1-SDW-Progress Summary Table
Percentage 100.00% 100.00% 100.00%
On March 16, 2014 Saadeh well was handed over officially after finishing all the CMC comments and fulfilling all requirements as per the specifications and the Engineer satisfaction. All necessary clearance letters were obtained and submitted to the Engineer. The project was handed over in presence of the Engineer, IRD, Jenin Municipality and WBWD representatives while the official completion date as per VO No.03 was March 11, 2014. For further details regarding the project progress, please see Attachment SDW 22.1Updated Schedule Roll Up.
3. Submittal Status:
During the current reporting period, only one submittal under SUB-18-SDW (final gyroscopic logging) had been submitted to the CMC and review comments are not received yet.
For further details, please see attachment SDW 22.6- Submittal Log
4. Updated Schedule
Please see Attachment SDW 22.1- updated schedule roll up.
5. Summary of Payments and Accrued Expenditures
IRD submitted its third payment under Task Order No. 13-00018 / INP II on April 29, 2014 of which was approved by the CMC on May 06, 2014. The corresponding payment amount was received from USAID on May 21, 2014. This payment covers the period from February 07, 2014 to April 20, 2014. Period of Performance Quantity
Payment No.
3
Period From
Period To
Feb.07, 14
Apr.20, 14
Current Payment Amount
Previous
Cumulative to date
Payment Submission Date
CMC Approval Date
Date Payment Received
129,517.31
235,787.57
365,304.88
Apr. 29, 14
May 06, 14
May 21,14
Table 5.1-SDW-Payment Summary DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 40
TO-13-00018 (WER)- March 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Accrued expenditures for Task Order 13-00018-SDW= $376,334.82 -$ 365,304.88 =$11,029.94
6. Project Indicators
6.1 Indicator #1: Zero beneficiaries
6.2 Indicator #2: Person days of Employment Generated The following is the employment generated in Person days for Project 3 during the current reporting period: Estimated Target Value: 588.00 person days; Total cumulative employment generated to-date: 1216 person days.
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 41
CONSTRUCTION MONTHLY PROGRESS REPORT-ATTACHMENTS Reporting Period: April 01- April 30, 2014 WELLS REHABILITATION PROJECT-WER
This publication was produced for review by the United States Agency for International Development. It was prepared by IRD
TO-13-00018 (WER)-April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
CONSTRUCTION MONTHLY PROGRESS REPORTATTACHMENTS Reporting Period: April 01- April 30, 2014 PROJECT 1-ARABA WELL PUMP STATION-ARW
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Attachments 1. Attachments ARW 22.1 ARW 22.2 ARW 22.3 ARW 22.4 ARW 22.5 ARW 22.6 ARW 22.7 ARW 22.8 ARW 22.9 ARW 22.10
Updated Schedule- Roll-up and One Month Look Ahead “S” Curve Site Memos Log Material and Equipment Delivered to Site Inspection Requests Log Submittals Log Requests for Information Log Variation Order Request Log Employment Generated Data Risk Register Table
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 2
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
ARW 22.1 Updated Schedule- Roll-up and One Month Look Ahead
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 3
RFTOP WATER-294-13-00018 WELL REHABILITATION IMPROVEMENTS Activity ID
Activity Name
Total
01-May-14 Original Early Start Duration
Early Finish
Actual Duration
Actual Start
Actual Finish
Total Float
365
01-May-14 26-Jul-15
136
23-Oct-13
0
365
01-May-14 26-Jul-15
136
23-Oct-13
0
501
03-May-14 26-Jul-15
144
23-Oct-13
-92
20-Jul-15 26-Jul-15 03-May-14 01-Jul-15
126 105 57
23-Oct-13 01-Dec-13 24-Oct-13
-92 -86
Mobilization
501 453 24
Submittals
415
03-May-14 26-Jul-15
141
31-Oct-13
45 362 260 260 77 104 83 127 207 152 104 137 111 85 81 315 190 228 295 362 362 141 77 0 292
03-May-14 03-May-14 03-May-14 23-Jun-14 03-May-14 23-Jun-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 08-Jun-14 08-Jun-14 26-Jul-15 01-May-14
25-May-15 21-Jan-15 21-Jan-15 12-Aug-14 01-Jul-14 14-Oct-14 14-Oct-14 21-Jan-15 27-Oct-14 26-Aug-14 27-Oct-14 19-Jul-14 19-Jul-14 08-Jun-14 31-Mar-15 27-Oct-14 19-Feb-15 31-Mar-15 25-May-15 25-May-15 07-Dec-14 17-Sep-14 26-Jul-15 14-Jun-15
115 129 90 84 10 46 0 0 0 90 66 76 56 26 56 106 100 0 59 115 115 0 0 0 0
31-Oct-13 14-Nov-13 06-Jan-14 07-Jan-14 12-Apr-14 07-Jan-14
292 45 254 254 175 253 207 144 185 148 98 180 143 93 288 45 234 234 175 182 172
01-May-14 01-May-14 01-May-14 01-May-14 05-May-14 15-Sep-14 31-Oct-14 15-Sep-14 21-Oct-14 07-Dec-14 21-Oct-14 02-Nov-14 18-Dec-14 02-Nov-14 01-May-14 01-May-14 01-May-14 01-May-14 05-May-14 08-Nov-14 08-Nov-14
14-Jun-15 25-Jun-14 21-Apr-15 21-Apr-15 02-Jan-15 26-May-15 26-May-15 06-Feb-15 08-Jun-15 08-Jun-15 19-Feb-15 14-Jun-15 14-Jun-15 25-Feb-15 08-Jun-15 25-Jun-14 25-Mar-15 25-Mar-15 02-Jan-15 09-May-15 29-Apr-15
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
RFTOP WATER-294-13-00018 WATER-294-13-00 WELL REHABILITATION & IMPROVEMENTS Milestones General Milestones Intermediate Milestones
Pre Construction Submittals Construction Submittals Material Submittals Civil Earth Works Concrete Works Roads Works Miscellaneous Building Works Mechanical Local Manufacturer Abroad Manufacturer Manufacture ( Long Lead Items) Electrical Abroad Manufacturer Manufacture ( Long Lead Items) Local Manufacturer Shop Drawings Civil Mechanical Electrical Methods Statement & Wo Work Plans Civil Mechanical Electrical Post Construction Submittals
Procurement Mechanical, Electrical Equipm Equipments&Instrumentation,...etc- for Arrabeh Well Donation Number Process Material Order & Manufact Manufacture Mechanical Equipment Electrical Equipment Material Shipment Mechanical Equipment Electrical Equipment Ashdod Port/Bridge Clearance Clear Mechanical Equipment Electrical Equipment Transport to Site (Ashdod Port to Site) Mechanical Equipment Electrical Equipment Mechanical, Electrical Equipm Equipments&Instrumentation,...etc for Sanur Well Donation Number Process Material Order & Manufact Manufacture Mechanical Equipment Electrical Equipment Material Shipment Mechanical Equipment
( New Bar ) Remaining Work Milestone
20-Feb-14 14-Nov-13 14-Nov-13
Q
Q
Q
Q
Q
Q
Q
Q
N D J F M A M J J A S O N D J F M A M J J A S O N
08-Jan-14 0 31-Mar-14 53 155 50 94 179 131 129 48 120 168 -48 300 23 330 0 121 34 -7 -42 -42 80 149 0 -53 -53 20 -53 -62 24 -75 -86 34 -60 -69 27 -60 -69 27 -54 20 -44 -44 10 -72 -62
Date Revision Checked Approved 23-Apr-14 Sr.Planning Eng.M. AbuSha... CM/Deputy Prog.-Iv... Naim Mani-Prog Direc...
Summary
Actual Work Critical Remaining Work
06-Jan-14 10-Feb-14 06-Jan-14 06-Feb-14 13-Mar-14 06-Feb-14 17-Dec-13 17-Dec-13
Q
Roll Up Schedule - April, 2014
Activity ID
Activity Name Electrical Equipment Ashdod Port/Bridge Clearance Clear Mechanical Equipment Electrical Equipment Transport to Site (Ashdod Port to Site) Mechanical Equipment Electrical Equipment Steel Pipes,Fittings&Valves Material Order & Manufact Manufacture All Needed Pipes,Steel Pipes & Fittings Valves Material Delivary All Needed Pipes,Steel Pipes & Fittings Valves
Execution Phase Project 1 Arraba Well Pump S Station Rehabilitation & Infrastructure Improvements Mobilization for P1 P1 - Arraba Well Pump Station Sta Rehabilitation Design Review After Well Development Results Delays Due to Geophys Geophysical Logging Final Acceptance P1 - Arraba Well Pump Station Sta Infrastructure Improvement Demolishing,Site Development,Apply Devel Safety Measurments&Site Preparation Construction of New Pump P Station Retaining Walls Retaining Wall Group Gr #1 Civil & Structural Structur Works Retaining Wall Group Gr #2 Civil & Structural Structur Works Retaining Wall Group Gr #3 Civil & Structural Structur Works Boundary Wall Group Gr #4 Civil & Structural Structur Works Retaining Wall Group Gr #5 Civil & Structural Structur Works Retaining Wall Group Gr #6 Civil & Structural Structur Works Balance Tank 1000 m3 m Civil & Structural Works Finishing Works Metal Fabricate Fabricated Works Mechanical Works Electrical & Instrumentation Instru Works Test Water Tightness Tightn For Reservoir Booster Pump System Syste Civil & Structural Works Steel Structure & Metal Works Mechanical Works Electrical & Instrumentation Instru Works Coatings & Finish Finishing Works Septic & Seepage Tank Ta Civil & Structural Works Plumbing Works Finishing Works Electrical & Control B Building Civil & Structural Works Finishing Works Mechanical Works Electrical & Instrumentation Instru Works HVAC-Plumping
( New Bar )
Original Early Start Duration
131 132 120 92 128 111 88 82 72 60 81 32 12 12 365 361 24 63 120 1 383 43 350 45 35 35 37 37 37 37 41 41 36 36 35 35 299 247 90 5 83 220 14 319 171 45 261 157 14 93 93 44 7 209 81 22 37 195 10
29-Dec-14 14-Dec-14 14-Dec-14 02-Feb-15 30-Dec-14 30-Dec-14 19-Feb-15 11-Oct-14 11-Oct-14 11-Oct-14 12-Oct-14 20-Dec-14 20-Dec-14 20-Jan-15 01-May-14 01-May-14
01-May-14 01-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 14-May-14 14-May-14 19-May-14 19-May-14 03-May-14 03-May-14 11-May-14 11-May-14 19-May-14 19-May-14 03-May-14 03-May-14 18-Dec-14 06-Apr-15 04-Jan-15 23-Jul-14 27-Apr-15 08-Jun-14 08-Jun-14 06-Jan-15 26-Aug-14 21-Dec-14 05-Mar-15 24-Jun-14 24-Jun-14 01-Sep-14 15-Oct-14 27-Oct-14 27-Oct-14 07-Feb-15 07-Feb-15 12-Nov-14 17-Jun-15
Early Finish
09-May-15 26-May-15 12-May-15 26-May-15 08-Jun-15 18-May-15 08-Jun-15 04-Feb-15 20-Jan-15 20-Dec-14 20-Jan-15 04-Feb-15 04-Jan-15 04-Feb-15 26-Jul-15 20-Jul-15
29-Aug-14 01-May-14 11-Jul-15 13-May-14 11-Jul-15 23-Jun-14 11-Jun-14 11-Jun-14 14-Jun-14 14-Jun-14 16-Jun-14 16-Jun-14 18-Jun-14 18-Jun-14 21-Jun-14 21-Jun-14 23-Jun-14 23-Jun-14 13-May-15 14-Mar-15 12-Apr-15 12-Apr-15 19-Apr-15 27-Apr-15 13-May-15 11-Jul-15 14-Jan-15 08-Mar-15 11-Jul-15 01-Jul-15 22-Mar-15 27-Oct-14 27-Oct-14 27-Oct-14 22-Oct-14 07-Jul-15 07-Feb-15 05-Mar-15 23-Mar-15 07-Jul-15 29-Jun-15
Remaining Work Milestone
0 0 0 0 0 0 0 0 0 0 0 0 0 0 135 135 57 86 48 48 96 96 17 17 1 1 9 9 9 9 9 9 9 9 9 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Actual Start
24-Oct-13 24-Oct-13 24-Oct-13 25-Dec-13 14-Mar-14 14-Mar-14 30-Dec-13 30-Dec-13 10-Apr-14 10-Apr-14 10-Apr-14 10-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14
Actual Finish
Total Float
Q
Q
Q
Q
Q
Q
Q
Q
Q
N D J F M A M J J A S O N D J F M A M J J A S O N
-75 -61 -49 -61 -61 -49 -61 13 13 25 14 13 35 14 -65 -61 08-Jan-14 28-Mar-14 -85 -85 -71 -42 -71 29 29 29 29 29 29 29 29 29 29 29 29 29 -32 -42 -42 -42 -42 -32 -32 -71 5 5 -71 -74 3 130 130 120 110 -79 2 2 2 -79 -72
Date Revision Checked Approved 23-Apr-14 Sr.Planning Eng.M. AbuSha... CM/Deputy Prog.-Iv... Naim Mani-Prog Direc...
Summary
Actual Work Critical Remaining Work
Actual Duration
Roll Up Schedule - April, 2014
Activity ID
Activity Name Chlorination & Stora Storage Building Civil & Structural Works Finishing Works Mechanical Works Electrical & Instrumentation Instru Works HVAC-Plumping Living Quarters Buil Building Civil & Structural Works Finishing Works Mechanical Works Electrical & Instrumentation Instru Works HVAC-Plumping Electrical Metering B Building Civil & Structural Works Finishing Works Electrical & Instrumentation Instru Works HVAC-Plumping Pads & Slabs Civil & Structural Works Electrical & Instrumentation Instru Works Mechanical Works Well Systems Wellhead and Pad (Structural) Mechanical Electrical & Instrumentation Instru Works Yard Works & Site Electrical El Power External & Finishing Finishi Works Mechanical Works Electrical & Instrumentation Instru Works Flow Control Valve for Mirka Existing Balance Tank & Arraba Existing RSV (O&M),Inspection,Commissioning,Start Up & Training for P1 (O&M),Inspection,Commi Initial Operation & Manufacturer Man Technical Manual Submittals (O&M) Approval - Final Operat Operation & Manufacturer Technical Manual Submittals (O&M) Certificate of Proper Installation Ins for Installed Equipments&Installation (Pre Commissioning) Training Phase Comissioning & Start Up U Phase for All System Demobilization,Close Out&Handing Out Over for P1 Project 2 Sanur Well Pump S Stations Rehabilitation & Infrastructure Improvements Mobilization for P2 P2 - Sanur Well Pump Station Stat Rehabilitation Delay of the Pump Switching Swit Off Delay due to Fishing-E Fishing-Extraction of Fallen Strainer from Sanur Well Design Review After Well Development Results P2: Sanur Well Pump Station Stat Infrastructure Improvement Demolishing,Site Development,Apply Devel Safety Measurments&Site Preparation Construction of New Pump P Station Balance Tank 1000 m3 m Civil & Structural Works Finishing Works Metal Fabricate Fabricated Works Mechanical Works Electrical & Instrumentation Instru Works Test Water Tightness Tightn For Reservoir Booster Pump System Syste Civil & Structural Works Steel Structure & Metal Works Mechanical Works Electrical & Instrumentation Instru Works Coatings & Finish Finishing Works
( New Bar )
Original Early Start Duration
219 67 83 188 212 5 308 67 127 142 296 136 336 75 130 327 5 111 43 88 68 215 47 15 5 139 67 24 139 20 316 218 208 6 11 5 5 365 24 33 1 4 120 326 13 316 282 230 55 5 76 203 14 219 38 40 177 78 14
26-Aug-14 26-Aug-14 18-Nov-14 06-Sep-14 03-Sep-14 28-Apr-15 24-May-14 24-May-14 21-Aug-14 06-Aug-14 07-Jun-14 08-Sep-14 03-May-14 03-May-14 10-Aug-14 07-May-14 20-Jun-15 30-Nov-14 30-Nov-14 18-Dec-14 25-Jan-15 14-Oct-14 14-Oct-14 14-Jun-15 14-Jun-15 14-Jan-15 14-Jan-15 25-Jan-15 14-Jan-15 25-Jan-15 15-Jun-14 15-Jun-14 07-Aug-14 01-Jul-15 01-Jul-15 08-Jul-15 14-Jul-15 01-May-14
Early Finish
24-May-15 18-Nov-14 04-Mar-15 28-Apr-15 24-May-15 04-May-15 14-Jun-15 21-Aug-14 28-Jan-15 01-Feb-15 14-Jun-15 01-Mar-15 25-Jun-15 10-Aug-14 19-Jan-15 20-Jun-15 25-Jun-15 18-Apr-15 25-Jan-15 09-Apr-15 18-Apr-15 01-Jul-15 08-Dec-14 01-Jul-15 20-Jun-15 01-Jul-15 08-Apr-15 25-Feb-15 01-Jul-15 21-Feb-15 14-Jul-15 23-Mar-15 22-Apr-15 08-Jul-15 14-Jul-15 14-Jul-15 20-Jul-15 26-Jul-15
01-May-14 20-May-14 01-May-14 18-May-14 03-May-14 03-May-14 14-May-14 14-May-14 14-May-14 26-Jan-15 29-Mar-15 04-Jan-15 10-Aug-14 19-Apr-15 08-Jun-14 08-Jun-14 03-Aug-14 03-Aug-14 01-Jul-14 01-Mar-15
06-May-14 15-Sep-14 13-Jun-15 17-May-14 13-Jun-15 05-May-15 05-Mar-15 04-Apr-15 04-Apr-15 11-Apr-15 19-Apr-15 05-May-15 17-Mar-15 03-Aug-14 18-Sep-14 12-Mar-15 18-Oct-14 17-Mar-15
Remaining Work Milestone
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 135 57 23 18 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Actual Start
24-Oct-13 24-Oct-13 29-Mar-14 01-Apr-14 24-Apr-14
Actual Finish
Total Float
Q
Q
Q
Q
Q
Q
Q
Q
Q
N D J F M A M J J A S O N D J F M A M J J A S O N
-41 80 18 -24 -41 -24 -59 117 48 48 -59 31 -69 171 58 -69 -69 -10 43 -3 -10 -74 89 -74 -64 -67 -2 41 -74 18 -68 -14 -14 -74 -68 -74 -74 -65 08-Jan-14 -35 19-Apr-14 -50 -71 -55 -18 -55 -25 -25 -18 -18 -18 -25 -25 20 102 121 24 121 7
Date Revision Checked Approved 23-Apr-14 Sr.Planning Eng.M. AbuSha... CM/Deputy Prog.-Iv... Naim Mani-Prog Direc...
Summary
Actual Work Critical Remaining Work
Actual Duration
Roll Up Schedule - April, 2014
Activity ID
Activity Name Septic & Seepage Tank Ta Plumbing Works Finishing Works Civil & Structural Works Electrical & Control B Building Civil & Structural Works Finishing Works Mechanical Works Electrical & Instrumentation Instru Works HVAC-Plumping Chlorination & Stora Storage Building Civil & Structural Works Finishing Works Mechanical Works Electrical & Instrumentation Instru Works HVAC-Plumping Living Quarters Buil Building Civil & Structural Works Finishing Works Mechanical Works Electrical & Instrumentation Instru Works HVAC-Plumping Electrical Metering B Building Civil & Structural Works Finishing Works Electrical & Instrumentation Instru Works HVAC-Plumping Pads & Slabs Civil & Structural Works Electrical & Instrumentation Instru Works Mechanical Works Finishing Works Well Systems Wellhead and Pad (Structural) Mechanical Electrical & Instrumentation Instru Works Yard Works,Widening&Upgrading Works,Widening of Existing Main Road Entrance & Site Electrical Power External & Finishing Finishi Works Electrical & Instrumentation Instru Works Mechanical Works Flow Control Valve for Jaba Existing Balance Tank&Kafr Rai Existing PS Balance Tank (O&M),Inspection,Commissioning,Start Up & Training (O&M),Inspection,Commi Initial Operation & Manufacturer Man Technical Manual Submittals (O&M) Approval - Final Operat Operation & Manufacturer Technical Manual Submittals (O&M) Certificate of Proper Installation Ins for Installed Equipments&Installation (Pre Commissioning) Training Phase Comissioning & Start Up U Phase for All System Demobilization,Close Out&Handing Out Over Project 3 Saadeh Well Pump Station Rehabilitation P3 - Saadeh Well Pump Station St Rehabilitation Mobilization for P3 Execution Demobilization,Close O Out&Handing Over for P3
( New Bar )
Original Early Start Duration
78 28 7 78 189 77 26 37 181 10 220 73 21 90 213 5 138 70 61 125 66 53 126 76 16 117 5 97 39 70 58 2 183 47 17 5 74 73 74 24 20 288 196 184 6 11 5 5 25 25 24 33 7
26-Jun-14 01-Sep-14 21-Sep-14 26-Jun-14 27-Oct-14 27-Oct-14 01-Feb-15 07-Feb-15 05-Nov-14 12-May-15 25-Aug-14 25-Aug-14 24-Nov-14 04-Sep-14 02-Sep-14 06-Jan-15 17-Aug-14 17-Aug-14 12-Nov-14 26-Aug-14 31-Aug-14 30-Nov-14 26-Oct-14 26-Oct-14 28-Jan-15 30-Oct-14 24-Mar-15 13-Dec-14 13-Dec-14 04-Jan-15 03-Feb-15 04-Apr-15 27-Oct-14 27-Oct-14 18-May-15 18-May-15 25-Jan-15 25-Jan-15 25-Jan-15 03-Feb-15 03-Feb-15 03-Aug-14 03-Aug-14 16-Sep-14 07-Jul-15 07-Jul-15 14-Jul-15 20-Jul-15
Early Finish
13-Oct-14 09-Oct-14 29-Sep-14 13-Oct-14 13-Jun-15 01-Feb-15 05-Mar-15 23-Mar-15 13-Jun-15 24-May-15 24-May-15 24-Nov-14 18-Dec-14 24-Dec-14 24-May-15 14-Jan-15 08-Feb-15 12-Nov-14 28-Jan-15 01-Feb-15 22-Nov-14 08-Feb-15 30-Mar-15 28-Jan-15 19-Feb-15 24-Mar-15 30-Mar-15 14-Apr-15 03-Feb-15 04-Apr-15 14-Apr-15 06-Apr-15 07-Jun-15 21-Dec-14 07-Jun-15 24-May-15 25-Apr-15 23-Apr-15 25-Apr-15 05-Mar-15 01-Mar-15 20-Jul-15 04-Apr-15 04-May-15 14-Jul-15 20-Jul-15 20-Jul-15 26-Jul-15
Remaining Work Milestone
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 106 106 57 97 0
Actual Start
Actual Finish
Total Float
Q
Q
Q
Q
Q
Q
Q
Q
Q
N D J F M A M J J A S O N D J F M A M J J A S O N
132 135 92 92 -58 -2 2 2 -58 -41 -41 75 75 75 -41 66 48 51 48 48 108 48 6 34 34 6 6 -7 29 -7 -7 -7 -53 78 -53 -41 -16 -15 -16 -16 11 -79 -60 -24 -79 -79 -79 -79 24-Oct-13 24-Oct-13 24-Oct-13 01-Dec-13 11-Mar-14
20-Mar-14 20-Mar-14 09-Jan-14 20-Mar-14 11-Mar-14
Date Revision Checked Approved 23-Apr-14 Sr.Planning Eng.M. AbuSha... CM/Deputy Prog.-Iv... Naim Mani-Prog Direc...
Summary
Actual Work Critical Remaining Work
Actual Duration
Roll Up Schedule - April, 2014
RFTOP WATER-294-13-00018 WELL REHABILITATION IMPROVEMENTS Activity ID
01-May-14
Activity Name
Original Early Start Duration
Early Finish
Actual Duration
Actual Start
Actual Finish
Total Float
Q
Q
Q
Q
Q
Q
Q
Q
Q
N D J F M A M J J A S O N D J F M A M J J A S O N
RFTOP WATER-294-13-00 WATER-294-13-00018 WELL REHABILITATION & IMPROVEMENTS Milestones Intermediate Milestones MS00065 MS00068
Start of Infrastructure Improvement for Sanour Well Pump Station Completion of Rehabilitation for Sanour Well Pump Station
0 0
03-May-14 20-May-14
0 0
-27 -49
Prep.&Submit Sealants Caulking & Grout- Product Data & Sample
7
03-May-14 10-May-14
0
-19
5
03-May-14 07-May-14
0
-21
Start of Infrastructure Improvement for Sanour W Completion of Rehabilitation for Sanour Well
Submittals Construction Submittals Material Submittals Civil Building Works
CS760
Mechanical Abroad Manufacturer ( Long Lead Items)
CS291
Prep&Submit Horizantal Louver Blinds - Sample
Electrical Abroad Manufacturer ( Long Lead Items)
CS1150 CS1170
Prep.&Submit Padmounted Transformers - Product Data Prep.&Submit Variable Frequency Drive Units 400V - Product Data
5 5
03-May-14 07-May-14 03-May-14 07-May-14
0 0
-36 -55
CS1280
Prep.&Submit PLC-Based Control Systems Hardware&Software - Product Data
5
03-May-14 07-May-14
0
-71
CS1290 CS1300
Prep.&Submit In-Line Flow Measuring Systems - Product Data Prep.&Submit Liquid Flow Detection Devices - Product Data
5 5
03-May-14 07-May-14 03-May-14 07-May-14
0 0
-61 -61
CS1350
Prep.&Submit Analyzer Measuring Systems - Product Data&Certificates
5
03-May-14 07-May-14
0
-47
CS1360
Prep.&Submit Control Panel Instrumentation - Product Data&Certificates
5
03-May-14 07-May-14
0
-47
Shop Drawings
Approval of Formwork Shop Drawing Details for Balance & Shop Drawing Tank 10
Execution Phase Project 1 Arraba Well Pump S Station Rehabilitation & Infrastructure Improvements Design Review After Well Development De Results
P1-CS210
Design Review for arrabeh Well
120
01-May-14 29-Aug-14
0
1
01-May-14 01-May-14
48
-85
Delays Due to Geophysical Geophysica Logging Final Acceptance
Delay-0010
Delays in Geophysical Final Acceptance
14-Mar-14
-85
Delays in Geophysical Final Acceptance
P1 - Arraba Well Pump Station Statio Infrastructure Improvement Demolishing,Site Develop Development,Apply Safety Measurments&Site Preparation
P1-DEMO-000020
Erosion & Sediment Control Systems
10
03-May-14 13-May-14
0
P1-DEMO-000030
Miscellaneous Excavation
3
03-May-14 03-May-14
38
-42
P1-DEMO-000040
Lab Test Report for Soil Bearing Capacity
3
03-May-14 05-May-14
0
-42
10 10
03-May-14 13-May-14 14-May-14 25-May-14
0 0
-42 -42
18-Mar-14
-42
Miscellaneous Excavation
Construction of New Pump Pum Station Balance Tank 1000 m3 Civil & Structural Works Wo
P1-BT-000010 P1-BT-000020
Apply Safety Measurement/Excavation to the Required Depth for the Base slab Supply and Spread 25cm B/C With Compaction Test & under ground Piping (Perforated Pipes)
P1-BT-000030
Casting Lean Concrete Under Balance Tank
1
26-May-14 26-May-14
0
-42
P1-BT-000040
Concrete Curing
7
27-May-14 03-Jun-14
0
-42
P1-BT-000050
Form/Steel Rebars for Base Slab/Installing Water Stop
20
27-May-14 18-Jun-14
0
-42
9 10
01-May-14 08-May-14 08-May-14 18-May-14
8 0
2
18-May-14 20-May-14
0
Project 2 Sanur Well Pump S Stations Rehabilitation & Infrastructure Improvements P2 - Sanur Well Pump Station Rehabilitation
P2-DEV-110 P2-DEV-115
Well Development,Logging and Water Sampling Well Yield Testing, Logging Per Specification
P2-DEV-120
Restoration & Rig.Demobilization
23-Apr-14
-71 -71
Well Development,Logging and Water Samplin
-49
Delay due to Fishing-Extr Fishing-Extraction of Fallen Strainer from Sanur Well
( New Bar )
Date Revision Checked Approved 23-Apr-14 Sr.Planning Eng.M. AbuSha... CM/Deputy Prog.-Iv... Naim Mani-Prog Direc...
Summary
Actual Work Remaining Work Critical Remaining Work Milestone
One Month Look Ahead
Activity ID
Activity Name
Delay-0050 Delay-0060
Original Early Start Duration
Conducting fishing attempts Video survey after fishing
Early Finish
Actual Duration
Actual Start
Actual Finish
Total Float
5 1
01-May-14 05-May-14 06-May-14 06-May-14
0 0
-70 -70
120
18-May-14 15-Sep-14
0
-71
3
03-May-14 05-May-14
0
-25
Q
Q
Q
Q
Q
Q
Q
Q
Q
N D J F M A M J J A S O N D J F M A M J J A S O N
Design Review After Well Development De Results
P2-CS220
Design Review for Sanour Well
P2: Sanur Well Pump Station Infrastructure Improvement Demolishing,Site Develop Development,Apply Safety Measurments&Site Preparation
P2-DEMO-35
Site Fencing & Apply Safety Measurements
P2-DEMO-40
Excavation for Clearing,Site Grading&Preparation
P2-DEMO-50 P2-DEMO-70
Erosion & Sediment Control Systems Miscellaneous Excavation
P2-DEMO-80
Lab Test Report for Soil Bearing Capacity
7
06-May-14 13-May-14
0
-25
10 3
06-May-14 17-May-14 06-May-14 08-May-14
0 0
-18 -18
3
14-May-14 17-May-14
0
-25
Construction of New Pump Pum Station Balance Tank 1000 m3 Civil & Structural Works Wo
P2-BT-320
Apply Safety Measurement/Excavation to the Required Depth for the Base slab
10
14-May-14 25-May-14
0
-25
P2-BT-330
Supply and Spread 25cm B/C With Compaction Test & under ground Piping (Perforated Pipes)
10
26-May-14 05-Jun-14
0
-25
( New Bar )
Date Revision Checked Approved 23-Apr-14 Sr.Planning Eng.M. AbuSha... CM/Deputy Prog.-Iv... Naim Mani-Prog Direc...
Summary
Actual Work Remaining Work Critical Remaining Work Milestone
One Month Look Ahead
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
ARW 22.2 “S” Curve
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 4
INTERNATIONAL RELIEF AND DEVELOPMENT, IRD USAID-INFRSTRUCTURE NEEDS PROGRAM (INP)
TASK ORDER NO. AID-294-TO-13-00018 TASK ORDER NO. AID-294-TO-13-00018 PROJECT 1 Arrabeh Well Pump Station - Rehabilitation and Infrastructure Improvements USD $6,516,970.57 23-Oct-13 550 CD 25-Apr-15
Total Contract Value Less Day Work: NTP (Notice to Proceed) Duration of Contract: Completion Date: Data Date:
PROJECT 2 Sanur Well Pump Station - Rehabilitation and Infrastructure Improvements USD $7,011,251.36 23-Oct-13 550 CD 25-Apr-15
Total Contract Value Less Day Work: NTP (Notice to Proceed) Duration of Contract: Completion Date: Data Date:
`
PROJECT 3 Saadeh Well Pump Station - Rehabilitation USD $493,634.98 $376,334.82 23-Oct-13 120 CD 19-Feb-14 11-Mar-14
Total Contract Value Less Day Work: Revised Total Contract Value Less Day Work: NTP (Notice to Proceed) Duration of Contract: Completion Date: Revised Completion Date : Data Date:
TASK ORDER (PROJECT 1, PROJECT 2 & PROJECT 3) USD $14,021,856.91 $700,000.00 $14,721,856.91 $13,904,556.73 $817,300.18 $14,721,856.91
Total Contract Value Less Day Work: Day Work Value: Total Contract Value Including Day Work: Revised Total Contract Value Less Day Work: Day Work Value: Total Contract Value Including Day Work:
PROGRESS S-CURVE & CASH FLOW SCHEDULE Planned Schedule Value Planned Schedule Value (CUM) Actual Schedule Value Actual Schedule Value (CUM) % Planned Schedule % Planned Schedule (CUM) % Actual Schedule %Actual Schedule (CUM)
Oct.13 $82,755.18 $72,410.79 $30,488.75 $30,488.75 1.27% 1.27% 0.00% 0.00%
Nov.13
Dec.13
Jan.14
Feb.14
Mar.14
April.14
May.14
June.14
July.14
Aug.14
$165,510.37 $248,265.55 $113,243.94 $143,732.69 2.54% 3.81% 3.00% 3.00%
$26,232.56 $367,626.28 $107,409.99 $251,142.68 0.40% 4.21% 1.15% 4.15%
$165,634.50 $760,860.11 $57,661.93 $308,804.61 2.54% 6.75% 0.88% 4.74%
$138,884.18 $1,286,213.66 $129,937.14 $438,741.75 2.13% 8.88% 1.99% 6.73%
$707,403.93 $1,338,951.45 $86,541.01 $525,282.76 10.85% 19.74% 1.33% 8.06%
$43,377.32 $1,377,861.99 $53,084.87 $578,367.63 0.67% 20.41% 0.81% 8.87%
$147,314.16 $1,524,241.22
$1,081.74 $1,640,561.44
$3,588.59 $1,705,086.54
2.26% 22.67%
0.02% 22.68%
0.06% 22.74%
$29,267.90 $1,989,339.32
Sep.14 $725,813.31 $2,316,442.31
Oct.14 $414,044.16 $2,566,877.13
Nov.14 $297,923.42 $3,020,066.20
Dec.14 $565,839.48 $5,031,015.15
Jan.15 $476,014.65 $5,701,268.52
Feb.15 $546,154.18 $6,150,326.17
Mar.15 $1,605,620.26 $6,419,370.07
April.15 $374,510.68 $6,516,970.57
TOTAL $6,516,970.57 $6,516,970.57
0.45% 23.19%
11.14% 34.32%
6.35% 40.68%
4.57% 45.25%
8.68% 53.93%
7.30% 61.24%
8.38% 69.62%
24.64% 94.25%
5.75% 100.00%
100% 100%
100.00%
100.00%
94.25%
TO-13-00018-WER, Progress S-Curve ARW
90.00% 80.00%
69.62%
70.00%
61.24%
60.00%
53.93% 45.25%
50.00%
40.68%
40.00%
34.32%
30.00% 20.00% 10.00%
22.67% 22.68% 19.74% 20.41% 4.21% 8.88% 1.27% 3.81% 4.15% 6.75% 3.00% 6.73% 0.00% 4.74%
8.06%
22.74% 23.19%
8.87%
0.00%
Nov.1 Dec.1 Feb.1 Mar.1 April. May.1 June.1 July.1 Aug.1 Sep.1 Nov.1 Dec.1 Feb.1 Mar.1 April. Jan.14 Oct.14 Jan.15 3 3 4 4 14 4 4 4 4 4 4 4 5 5 15 % Planned Schedule (CUM) 1.27% 3.81% 4.21% 6.75% 8.88% 19.74%20.41%22.67%22.68%22.74%23.19%34.32%40.68%45.25%53.93%61.24%69.62%94.25%100.00 %Actual Schedule (CUM) 0.00% 3.00% 4.15% 4.74% 6.73% 8.06% 8.87% Oct.13
Attachment 22.2 S Curve
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
ARW 22.3 Site Memos Log
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 5
Infrastructure Needs Program- INP
USAID Contract No. AID-294-I-00-12-00003 Project: Wells Rehabilitation Project
NOA Date: NTP Date: Current as Date:
September 23, 2014 October 25, 2014 May 5, 2014
Site Memoranda From Engineer To Contractor (SM) Number
Description/Subject
Date Received Response Date Comments
There is no site memo issued for the project During this reporting period
TO-18-WER-SM Log-April 2014-Monthly Progress Report
Attachment No.22.3 Page 1 of 1
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
ARW 22.4 Material or Equipment Delivered to Site Log
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 6
Material Log
Task Order: Project:
AID-294-TO-13-00018
Sub-project
Arraba Well Pump Station Rehabilitation and Infrastructure Improvements
Wells Rehabilitation Project
Item
Date
Description
Oty
Location
1
April 26, 2014
Base coarse
100 m³
Arraba well pump station
2
April 27, 2014
Base coarse
20 m³
Arraba well pump station
3
April 27, 2014
Reinforcement steel bars (Ø22, Ø16)
11.306 T
Arraba well pump station
TO-18-ARW-Material Log-April 2014-Monthly Progress Report
Attachment 22.4 Page 1 of 1
Equipment Log
Task Order: Project: Sub-project No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39
AID-294-TO-13-00018 Wells Rehabilitation Project Arraba Well Pump Station Rehabilitation & Infrastructure Improvements
Date on Site
April 1, 2014
April 2, 2014
April 3, 2014
April 4, 2014
April 5, 2014
April 6, 2014
April 7, 2014
April 8, 2014
Description Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Truck Total Station Level Mitsubishi L200 -2007 Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Mitsubishi L200 -2007 Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Mitsubishi L200 -2007 Rig JCB Back Hole-1993 Generator Set Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Mercedes 416 -2002 Mitsubishi L200 -2007 Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Truck Crane Level Mercedes 416 -2002 Mitsubishi L200 -2007 Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Level Mitsubishi L200 -2007
TO-18-ARW-Equipment Log-April 2014-Monthly Progress Report
Quantity in use
Hours
1 1
8 6
2
8
Quantity Idle 1 1 1
1
8 1 1 1
1
8 1
1
8
1
8
1 1 1 1 1 1 1 1
3 1 1
1 1 1
8 8 5 1 1
2
5 1
1 1 1
8 8 8 1 1 1 1
1
8
Attachment 22.4 Page 1 of 4
No. 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90
Date on Site
April 9, 2014
April 10, 2014
April 11, 2014
April 12, 2014
April 13, 2014
April 14, 2014
April 15, 2014
Description Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Truck Crane Level Total Station Mitsubishi L200 -2007 Mercedes 416 -2002 Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Truck Crane Level Total Station Mitsubishi L200 -2007 Mercedes 416 -2002 Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Level Total Station Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Truck Level Total Station Mitsubishi L200 -2007 Mercedes 416 -2002 Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Truck Level Total Station Mitsubishi L200 -2007 Mercedes 416 -2002 Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Level Total Station Mercedes 416 -2002 Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Level Total Station Mercedes 416 -2002
TO-18-ARW-Equipment Log-April 2014-Monthly Progress Report
Quantity in use
Hours
Quantity Idle 1 1 1
1 1 1 1 1 1 1
3 8 8 8 8 8 8 1
1
8 1
1 1 1 1
8 8 8 8 1 1 1 1 1
1 1
8 8
2 1 1 1 1
8 8 8 8 8
1
4
1
1 1 1 1 1 1
8 8 8 8 1 1 1
1 1 1 1
8 8 8 2 1 1
1 1 1
8 8 8 Attachment 22.4 Page 2 of 4
No. 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140
Date on Site
April 16, 2014
April 17, 2014
April 18, 2014
April 19, 2014
April 20, 2014
April 21, 2014
April 22, 2014
Description Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Level Total Station Mercedes 416 -2002 Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Crane Level Total Station Mitsubishi L200 -2007 Mercedes 416 -2002 Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Diesel Generator Level Total Station Mitsubishi L200 -2007 Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Diesel Generator Level Total Station Mercedes 416 -2002 Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Diesel Generator Level Total Station Mercedes 416 -2002 Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Truck Level Total Station Mercedes 416 -2002 Diesel Generator(standby) Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Diesel Generator(Standby) Level Total Station Mercedes 416 -2002
TO-18-ARW-Equipment Log-April 2014-Monthly Progress Report
Quantity in use
Hours
Quantity Idle 1 1 1
1 1 1 1
8 8 8 4 1 1
1
1 1 1
1 1
8 8 1 1 1 1 1 1
1
8 1 1 1 1 1
1 1
8 8
1
8
1 1 1 1 1 1
8 8 1
1 1 1
8 8 3 1
1 1
8 8 1 1
1 1
8 8 1 1
1 1
8 8
Attachment 22.4 Page 3 of 4
No. 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 190 191 192 193 194 195
Date on Site
April 23, 2014
April 24, 2014
April 25, 2014
April 26, 2014
April 27, 2014
April 28, 2014
April 29, 2014
Description Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Truck Level Total Station Mercedes 416 -2002 Diesel Generator(Standby) Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Truck Level Total Station Mercedes 416 -2002 Diesel Generator(Standby) Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Level Total Station Diesel Generator(Standby) Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Truck Crane Level Total Station Mercedes 416 -2002 Diesel Generator(Standby) Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Truck Level Total Station Mercedes 416 -2002 Diesel Generator(Standby) Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Level Mercedes 416 -2002 Diesel Generator(Standby) Crawler Excavator- Hitachi JCB Back Hole -1993 Steel Roller Level Mercedes 416 -2002 Diesel Generator(Standby)
TO-18-ARW-Equipment Log-April 2014-Monthly Progress Report
Quantity in use
Hours
1 1 1 2 1 1 1
8 8 8 8 8 8 8
Quantity Idle
1 1
8 1
1 2 1
8 8 8 1
1
8 1 1 1 1 1 1 1 1
1 1 1 1
8 8 8 2 1
1 1
8 8 1 1
1
8
1
2
1 1
8 8
1 1
1 1 1 1 1 1
8 8 8 8 1 1
1 1 1 1
8 8 8 8 1 Attachment 22.4 Page 4 of 4
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
ARW 22.5 Inspection Requests Log
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 7
Amend-Resubmit Pending Make Correction Noted
Inspection Requests Log IRD/BV
Task Order: Project:
Sender/ Recipient
AID-294-TO-13-00018 Wells Rehabilitation Project IRD/BV
1st Inspection
No.
Request Date
Date Inspection Required
IR-13-00018-ARW-014-A
April 8, 2014
April 9, 2014
IR-13-00018-ARW-015-A
April 23, 2014
IR-13-00018-ARW-016-A
Response Date
Grade
Inspecting excavations to the reduced level and quantities
April 10, 2014
No Exceptions Noted
April 23, 2014
Inspecting R.W location-coordinates prior to start excavation activity for retaining wall foundations.
April 23, 2014
No Exceptions Noted
April 24, 2014
April 26, 2014
Inspection dimensions of the excavated retaining wall foundation.
April 26, 2014
Amend-Resubmit
IR-13-00018-ARW-016-B
April 26, 2014
April 27, 2014
Inspecting excavation dimensions for retaining wall footings.
April 27, 2014
Amend-Resubmit
IR-13-00018-ARW-016-C
April 29, 2014
April 29, 2014
Inspecting excavation dimensions for retaining wall footings.
April 29, 2014
No Exceptions Noted
IR-13-00018-ARW-017-A
April 26, 2014
April 27, 2014
Inspecting miscellaneous excavation under the reduced level.
April 27, 2014
No Exceptions Noted
IR-13-00018-ARW-018-A
April 30, 2014
May 1, 2014
Inspecting spreading leveling base coarse layer-25cm in Area from A1 to A6 under retaining wall footings
May 1, 2014
Amend-Resubmit
IR-13-00018-ARW-019-A
April 30, 2014
May 1, 2014
Inspecting Arraba balance tank location (coordinate) for balance tank foundation excavation
May 1, 2014
No Exceptions Noted
TO-18-ARW-IR Log-April 2014-Monthly Progress Report
Description of Works Inspected
2nd Inspection
Response Date
Grade
Attachment No.22.5 Page 1 of 1
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
ARW 22.6 Submittals Log
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 8
Contract No. AID-294-TO-13-00018
Task Order: 00018‐WER
SUBMITTAL REGISTER LOG/SCHEDULE
Project 1‐ARW Arraba Well Pump Station
NTP:
23-Oct-13
NOA:
25-Sep-13
Project 2‐SNW Sanur Well Pump Station Project 3‐SDW Saadeh Well Rehabilitation Submittal Categories
Submittal Classification
Identifiers:
Resubmittal Alpha Identifier
PD
PRODUCT DATA
PCS
Preconstruction
WER Wells Rehabilitation Project
SD
SHOP DRAWINGS
CONS
Construction
ARW
AD
ADMINISTRATIVE/OTHER
PSTS
Post construction
TR
SNW
TEST REPORT
SDW
Submittal Disposition/ Color Coding
First Submittal SUB-18-WER-001-A
: Project 1 Identifier : Project 2 Identifier
A – No Exceptions Noted
First RE-Submittal SUB-18-WER-001-B
B - Make Corrections Noted
Second Resubmittal SUB-18-WER-001-C
C- Amend and Resubmit
: Project 3 Identifier
D- Rejected- Resubmit
SCH
SCHEDULE
E- Review Not Required
RPT
REPORT
Submitted Pending Response
SMP
SAMPLE
CO
COMPLETION & CLOSEOUT
MAT
MATERIAL
A
Submittal Number
B
C
Submittal Description
Specification Number
D
E
F
G
Submittal Category
Submittal Classification
Submittal Type
Project Identifier
H
Schedule Activity ID
I
BOQ Item No.
M
J
K
L
Rev.
Contractual Submission Date
Actual Submission Date from Subcontractor
Actual Submission Date
N
O
P
Q
R
S
Submission Delay
Response Needed by (Max. 30 days)
Date Returned to IRD
Total Engineer Response Time
Submittal Disposition (Grade)
Remarks
SUB-00018-WER-049-C
Perforated Conduit
Section 15430- Part 2.2(A)
PD
CONS
SUB
WER
C
March 16, 2014
April 22, 2014
May 22, 2014
April 28, 2014
6
B
SUB-00018-ARW-088-B
Septic Tank and Seepage Pit Shop Drawing (Structural & Architectural) for Arraba
Section 03700-Part 1.3 B and Drawing No: SSC(1,2) from Confirmed General Design
SD
CONS
SUB
ARW
B
March 23, 2014
April 9, 2014
May 9, 2014
April 20, 2014
11
B
SUB-00018-ARW-094-B
Retaining Wall Shop Drawing for Arraba
Drawing No: RWS 2,3,4,5-Rev. General Design
SD
CONS
SUB
ARW
CS329
B
April 16, 2014
April 17, 2014
May 17, 2014
April 23, 2014
6
B
SUB-00018-ARW-095-C
Balance Tank Shop Drawing for Arraba
Section 03700-Part 1.3 B & Drawing No: CSA(1-5),CSS(1,2)-Rev. Confirmed General Design
SD
CONS
SUB
ARW
CS310
C
April 2, 2014
April 13, 2014
May 13, 2014
April 17, 2014
4
B
SUB-00018-ARW-130-B
Butterfly Valve DN:300 mm, PN16 bar
Section 15202, paragraph 2.2(A-E)
PD
CONS
SUB
ARW
CS577
B
March 31, 2014
April 13, 2014
May 13, 2014
April 16, 2014
3
B
SUB-00018-WER-135-B
Cable Tray and Cable Ladder
Section 01300, paragraph 1.8-(B-1-b) and 1.8(B-1-e)
PD
CONS
SUB
WER
B
March 2, 2014
April 13, 2014
May 13, 2014
April 14, 2014
1
B
SUB-00018-WER-138-B
Wiring Devices
Section 16140. Para. 2.2, 2.3, 2.4
PD
CONS
SUB
WER
B
March 13, 2014
April 9, 2014
May 9, 2014
April 14, 2014
5
B
SUB-00018-WER-147-B
Reinforcement Steel Bar-Test Report
Section 03200-Part 2.2-A-2
TR
CONS
Lab Test
WER
B
From main contractor directly
April 7, 2014
May 7, 2014
April 13, 2014
6
B
SUB-00018-ARW-151-B
Lighting and Power Shop Drawing for Arraba Balance Tank
Drawing No: 4E-13-Rev. Arraba Well Pump Station Confirm Documents
SD
CONS
SUB
ARW
B
April 9, 2014
April 15, 2014
May 15, 2014
April 30, 2014
15
B
SUB-00018-SDW-162-C
Final Geophysical Logging
Section 02623
CO
CONS
SUB
SDW
C
From main contractor directly
April 28, 2014
May 28, 2014
SUB-00018-WER-177-B
Pressure Measuring Systems-Pressure Gauges
Section 17108, para.2.1 (A-J)
PD
CONS
SUB
WER
B
March 29, 2014
April 1, 2014
May 1, 2014
April 8, 2014
7
B
SUB-00018-ARW-187-B
Completion Report for Geophysical Static Logging -Arraba Well
April 23, 2014
May 23, 2014
SUB-00018-WER-191-A
Bolts and Anchors-Pipe and Equipment Flange Bolts
SUB-00018-WER-192-A
CS1130
CS827
RPT
CONS
SUB
ARW
B
From main contractor directly
Section 05500-Part 2.13-A-3-d
PD
CONS
SUB
WER
A
March 22, 2014
April 1, 2014
May 1, 2014
April 9, 2014
8
B
Pipe Flanges-Mechanical Fittings Gasket-40 bar
Section 15000-Part 2.2-M-(1-5)
PD
CONS
SUB
WER
A
March 19, 2014
April 1, 2014
May 1, 2014
April 15, 2014
14
C
SUB-00018-WER-193-A
Test Report for Compressive Strength 28 Day at (HCL) For Concrete Mix Design.
Section 03300
TR
CONS
Lab Test
WER
A
From main contractor directly
SUB-00018-WER-193-A
Test Report For Compressive Strength – 28 day at (HCL) for Concrete Mix Design.
Section 03300
TR
CONS
Lab Test
WER
A
From main contractor directly
April 3, 2014
May 3, 2014
April 8, 2014
5
B
April 1, 2014
May 1, 2014
April 14, 2014
13
B
Submitted on April 01, 2014 and Retracted on April 01, 2014-At the same day
SUB-00018-SNW-194-A
Sanur Well Performance Testing Work Plan
Section 02636
AD
CONS
SUB
SNW
A
From main contractor directly
SUB-00018-ARW-195-A
Shop Drawing "Arraba well” Confirmed Profile
Section 01300
SD
CONS
SUB
ARW
A
From main contractor directly
April 2, 2014
May 2, 2014
April 3, 2014
1
C
SUB-00018-ARW-195-B
Shop Drawing "Arraba well” Confirmed Profile
Section 01300
SD
CONS
SUB
ARW
B
From main contractor directly
April 3, 2014
May 3, 2014
April 8, 2014
5
A
SUB-00018-ARW-196-A
Completion Report Arraba Well (VTLS) Existing Pump Reinstallation
Section 01010 A-Part -3-3.1
RPT
CONS
SUB
ARW
A
From main contractor directly
April 2, 2014
May 2, 2014
April 8, 2014
6
B
SUB-00018-ARW-197-A
Finish Ground Level (Arraba Well)
N/A
SD
CONS
SUB
ARW
A
March 30, 2014
April 2, 2014
May 2, 2014
April 7, 2014
5
B
SUB-00018-WER-198-A
Test Report for Compressive Strength – 28 day at Me’mar Plant for Concrete Trial Batch Mix
Section 03300
TR
CONS
Lab Test
WER
A
From main contractor directly
April 3, 2014
May 3, 2014
April 8, 2014
5
C
SUB-00018-WER-199-A
QC Monthly Report -March 2014
Contractor’s Manual, paragraph 4.1construction submittal(3)
PD
CONS
SUB
WER
A
From main contractor directly
April 6, 2014
May 6, 2014
April 8, 2014
2
B
SUB-00018-WER-200-A
Method Statement for Second Trial Mix
Section 03300-Part 1.2-B
AD
CONS
SUB
WER
A
From main contractor directly
April 6, 2014
May 6, 2014
April 8, 2014
2
B
SUB-00018-WER-201-A
QA/QC Submittal Register Monthly Update March, 2014
Contractor’s Manual, 4.1-construction submittals (3)
AD
CONS
SUB
WER
A
From main contractor directly
April 7, 2014
May 7, 2014
April 14, 2014
7
B
SUB-00018-SNW-202-A
Sanur Well Geophysical Logging Work Plan
Section 02623
AD
CONS
SUB
SNW
A
From main contractor directly
April 8, 2014
May 8, 2014
April 9, 2014
1
A
AD
CONS
SUB
SNW
A
From main contractor directly
April 8, 2014
May 8, 2014
April 14, 2014
6
B
Contractor`s Manual-Sec. 4.1/12& Specs. Sec. 01040, 01520, 01550, 01560, 01640 & 01505
AD
CONS
SUB
WER
A
From main contractor directly
April 8, 2014
May 8, 2014
April 14, 2014
6
B
SUB-00018-SNW-203-A
The Safety Plan For Working at Night for Sanur Well Monthly Safety Plan Update-March 2014
SUB-00018-WER-204-A
Contractor's Manual -Sec.4.1/12 & Specs.sec.01040,01520,01550, 01560,01640 and 01505
SUB-00018-WER-205-A
Monthly Risk Management Plan Update -March 2014
Contractor`s Manual-Sec. 4.1/construction submittals #003
AD
CONS
SUB
WER
A
From main contractor directly
April 8, 2014
May 8, 2014
April 14, 2014
6
B
SUB-00018-WER-206-A
Monthly Environmental Plan Update and Mitigation Plan Update- March, 2014
Contractor`s Manual-Sec. 4.1/14 & Specs.1560
AD
CONS
SUB
WER
A
From main contractor directly
April 8, 2014
May 8, 2014
April 14, 2014
6
B
SUB-00018-WER-207-A
Pipe Flanges-Steel Pipe Flanges
Section 15000-Para. 2.2-B, 2.2-C,2.2-D, 2.2F-2&3, 2.2-G-1
PD
CONS
SUB
WER
A
March 18, 2014
April 9, 2014
May 9, 2014
April 15, 2014
6
B
SUB-00018-WER-208-A
Updated CPM Construction Schedule -March 2014
Section 01311
SCH
CONS
SUB
WER
A
From main contractor directly
April 9, 2014
May 9, 2014
April 27, 2014
18
B
SUB-00018-WER-209-A
Upblast Roof Exhaust Fan-Electrical Metering Building Fans
Section 15830-Part 2.1
PD
CONS
SUB
WER
A
March 24, 2014
April 10, 2014
May 10, 2014
April 14, 2014
4
B
SUB-00018-WER-210-A
Pressure Measuring Systems-Diaphragm Seals
Section 17108-Para. 2.3-(A,B,C,D,E,F,G,H)
PD
CONS
SUB
WER
A
March 30, 2014
April 10, 2014
May 10, 2014
April 17, 2014
7
B
TO‐18‐WER‐Submittals Log‐April 2014‐Monthly Progress Report
Attachment No.22.6 Page 1 of 2
Submittal Number
Submittal Description
Specification Number
Submittal Category
Submittal Classification
Submittal Type
Project Identifier
Schedule Activity ID
BOQ Item No.
Rev.
Contractual Submission Date
Actual Submission Date from Subcontractor
Actual Submission Date
Submission Delay
Response Needed by (Max. 30 days)
Date Returned to IRD
Total Engineer Response Time
Submittal Disposition (Grade)
SUB-00018-WER-211-A
Debris Stop Gate and Mud Gate
Drawing No: PS2S-1 -Rev. General Design Drawings
PD
CONS
SUB
WER
A
March 31, 2014
April 10, 2014
May 10, 2014
April 15, 2014
5
B
SUB-00018-WER-212-A
Ball Valve DN: 15, 25 mm, PN: 16, 40 Bar
Section 15204-Para. 2.2-(A,B,C,D,E)
PD
CONS
SUB
WER
A
April 1, 2014
April 10, 2014
May 10, 2014
April 16, 2014
6
B
SUB-00018-WER-213-A
Control Valve-Pressure Reducing Valve DN: 50mm
Section15217-Para. 2.1-C (3,5)
PD
CONS
SUB
WER
A
April 1, 2014
April 13, 2014
May 13, 2014
April 17, 2014
4
C
SUB-00018-WER-214-A
Control Valve-Pressure Sustaining Valve DN: 50mm
Section 15217-Para. 2.1-C (2)
PD
CONS
SUB
WER
A
April 1, 2014
April 13, 2014
May 13, 2014
April 15, 2014
2
C
SUB-00018-WER-214-B
Control Valve-Pressure Sustaining Valve DN: 50mm
Section 15217-Part 2-2.1-C (2)
PD
CONS
Lab Test
WER
B
April 19, 2014
April 27, 2014
May 27, 2014
SUB-00018-WER-215-A
Upblast Roof Exhaust Fans-Chlorination Room Fans
Section 15830-Para. 2.1 (A,B,C,D,E)
PD
CONS
SUB
WER
A
April 1, 2014
April 13, 2014
May 13, 2014
April 14, 2014
1
D
SUB-00018-WER-216-A
Treatment of Surface Defects-Rendroc FC
Section 03300-Para. 3.12-C (1,2)
AD
CONS
SUB
WER
A
April 3, 2014
April 13, 2014
May 13, 2014
April 17, 2014
4
B
SUB-00018-ARW-217-A
Electrical Builder Drawing For Arraba Balancing Tank
Drawing No: PS2E-1-Rev. Program Standard Design
SD
CONS
SUB
ARW
A
April 3, 2014
April 13, 2014
May 13, 2014
April 14, 2014
1
B
SUB-00018-WER-218-A
Process Control and Instrumentation Systems Supplier & Electrical Calculation & Protection Designer
Section 17100-Para. 1.1-E-3(a-c)
AD
CONS
SUB
WER
A
April 13, 2014
April 13, 2014
May 13, 2014
SUB-00018-ARW-219-A
Alternative Accesses Passage For Field Offices Arraba Well
Drawing No: PS2E-1-Rev. Program Standard Design
SD
CONS
SUB
ARW
A
From main contractor directly
April 14, 2014
May 14, 2014
April 20, 2014
6
B
SUB-00018-WER-220-A
Treatment of Surface Defects-Renderoc HSXtra
Section 03300-Para. 3.12-D
AD
CONS
SUB
WER
A
April 10, 2014
April 15, 2014
May 15, 2014
April 17, 2014
2
B
SUB-00018-WER-221-A
Curing Materials-Polyethylene Sheets
Section 03300-Para. 2.2-D
SMP
CONS
SUB
WER
A
April 12, 2014
SUB-00018-WER-222-A
Test Report For Natural Sand-Second Trail Mix
Section 03300
TR
CONS
Lab Test
WER
A
From main contractor directly
April 17, 2014
May 17, 2014
April 28, 2014
11
B
SUB-00018-WER-223-A
Test Report for Reinforcement Steel Bars Φ 22
Section 03200
TR
CONS
Lab Test
WER
A
From main contractor directly
April 17, 2014
May 17, 2014
April 28, 2014
11
B
SUB-00018-WER-224-A
Fill and Backfill Material Test Report-Base Course
Section 02200-Part 2.1 C-7
TR
CONS
Lab Test
WER
A
From main contractor directly
April 17, 2014
May 17, 2014
April 23, 2014
6
B
SUB-00018-ARW-225-A
Test Report - Soil Confirmation For Structural Foundations in Section 02200 Arraba Project.
TR
CONS
Lab Test
ARW
A
From main contractor directly
April 20, 2014
May 20, 2014
April 30, 2014
10
B
SUB-00018-WER-226-A
Test Report for Backfill Material-Sourced from Site Excavations.
Section 02200-Part 2.1
TR
CONS
Lab Test
WER
A
From main contractor directly
April 20, 2014
May 20, 2014
April 28, 2014
8
B
SUB-00018-SNW-227-A
Revised Work Plan for Sanur Well Development
Sections 02623, 02624 and 02636
AD
CONS
SUB
SNW
A
From main contractor directly
April 20, 2014
May 20, 2014
April 30, 2014
10
B
SUB-00018-WER-228-A
Miscellaneous Materials-Vapor Retarder (vapor barrier)
Section 03300-Para. 2.4-C
SMP
CONS
SUB
WER
A
April 20, 2014
April 21, 2014
May 21, 2014
April 30, 2014
9
B
SUB-00018-ARW-229-A
Method Statement for Construction of Arraba Retaining Wall
Section 01300-Part 1.8 B
AD
CONS
SUB
ARW
A
From main contractor directly
April 21, 2014
May 21, 2014
April 30, 2014
9
B
SUB-00018-WER-230-A
Form and Falsework Materials-Plastic Chamfer Edge Sample.
SMP
CONS
SUB
WER
A
April 10, 2014
April 23, 2014
May 23, 2014
April 30, 2014
7
A
SUB-00018-WER-231-A
Fill and Backfill Material Requirement-Samples
Section 02200-Part 2-(2.1-C)
SMP
CONS
SUB
WER
A
April 24, 2014
SUB-00018-ARW-232-A
Test Report - Soil Bearing Capacity Confirmation For Retaining Wall Footing at Arraba Well Project
Section 02200
TR
CONS
Lab Test
ARW
A
From main contractor directly
April 27, 2014
May 27, 2014
SUB-00018-WER-233-A
Steel Pipes and Fittings
Section 02570-Para. 1.1-C(1,2), 2.4-A(1,2) and 2.6-C
PD
CONS
SUB
WER
A
April 8, 2014
April 28, 2014
May 28, 2014
SUB-00018-WER-234-A
Test Report for Concrete Compressive Strength 7-Days at Ya’bad Village for Second Trial Batch Purpose by HCL
Section 03300-Part 1-1.4-C
TR
CONS
Lab Test
WER
A
From main contractor directly
April 28, 2014
May 28, 2014
SUB-00018-WER-235-A
Reinforcement Steel Spacer for Vertical Elements-Sample
Section 03200-Part 2-2.2-B-1
SMP
CONS
SUB
WER
A
April 22, 2014
April 28, 2014
SUB-00018-ARW-236-A
Test Report on Reinforcement Steel Bars (Ø16,Ø22)-Arraba Site
Section 03200-Part 2-2.2-A-1
TR
CONS
Lab Test
ARW
A
From main contractor directly
SUB-00018-WER-237-A
Protective Coating-Dekguard FC
Section 09800-Part 2-2.2-O
PD
CONS
SUB
WER
A
SUB-00018-WER-238-A
Booster-Pump Control Valve
Section 15217-Part 2-2.1-C
PD
CONS
SUB
WER
SUB-00018-ARW-239-A
Degree of Compaction Test Report Under Retaining Wall Foundation Arraba Well
Section 02200-Part 3-3.10-B
TR
CONS
Lab Test
SUB-00018-SNW-240-A
Sanur Well – Fishing Work Plan
Section 01300-Part 1-1.8-B
AD
CONS
SUB-00018-SNW-241-A
Activity Report- Sanur Well Video Logging (2) After Jetting and Airlifting
Section 02623
RPT
SUB-00018-SNW-242-A
Activity Report- Sanur Well Video Logging (1) After Pulling Out Existing VLST Pump
Section 02623
RPT
TO‐18‐WER‐Submittals Log‐April 2014‐Monthly Progress Report
Remarks
Submitted on April 15, 2014 and Retracted on April 21, 2014.
Submitted on April 24, 2014 and Retracted on April 30, 2014 April 30, 2014
3
B
May 28, 2014
April 30, 2014
2
B
April 29, 2014
May 29, 2014
April 30, 2014
1
A
April 23, 2014
April 29, 2014
May 29, 2014
April 30, 2014
1
C
A
April 26, 2014
April 29, 2014
May 29, 2014
ARW
A
From main contractor directly
April 29, 2014
May 29, 2014
April 30, 2014
1
A
SUB
SNW
A
From main contractor directly
April 29, 2014
May 29, 2014
CONS
SUB
SNW
A
From main contractor directly
April 30, 2014
May 30, 2014
CONS
SUB
SNW
A
From main contractor directly
April 30, 2014
May 30, 2014
Attachment No.22.6 Page 2 of 2
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
ARW 22.7 Requests for Information Log
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 9
Task Order: Projects:
Task Order: 00018-WER Project 1-ARW Arraba Well Pump Station Rehabilitation & Infrastructure Improvements Project 2-SNW Sanur Well Pump Station Rehabilitation & Infrastructure Improvements Project 3-SDW Saadeh Well Rehabilitation
NTP:
October 23, 2013
NOA:
September 25, 2013
Request for Information Log RFI No.
Subject of RFI
BOQ item no.
Specification no.
Drawing no.
Date Submitted to Engineer
Response Date from Engineer
No. of Days for Engineer Response
Status
Engineer Response
Potential Change Order
Response to Requested Information: 1. Pressure rating for the Booster Control Valve (BCV) is PN 40 and not PN25. Refer to the valve and equipment schedule in the project design drawings 3M-1 and 4i\I-1 for valves pressure ratings. RFI-18-WER-C-E-027-A
Booster Control Valves
Section 15217-Par.8
April 9, 2014
April 13, 2014
4
Reviewed
2. No deviations were made on the specified pressure rating. Specified hydraulic calculations from the manufacturer are for cavitation, sizing and performance verification and are irrelevant to pressure rating determination. 3. BCV selection shall be based on the specified pressure rating, and section 15217/ C/8 of project documents for the components, functionality and features; regardless of manufacturer and/ or model number indicated.
RFI-18-WER-C-E-028-A
Confirmation on pipes material to be used at balance tanks outlets in Arraba and Sanur pumping stations.
RFI-18-WER-C-E-029-A
Using West Bank Water Department (WBWD) video logging camera for bore hole TV survey in Sanur Well.
TO-18-WER-RFI Log-April 2014-Monthly Progress Report
Conformed Drawing-3M-3, 4M-3 & G-7
April 28, 2014
Pending
April 28, 2014
Pending
Attachment No.22.7 Page 1 of 1
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
ARW 22.8 Variation Order Request and Variation Order Log
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 10
Task Order: 00018-WER Project 1-ARW Arraba Well Pump Station Rehabilitation & Infrastructure Improvements Project 2-SNW Sanur Well Pump Station Rehabilitation & Infrastructure Improvements
Task Order: Projects:
Original Task Order Amount VO
Date
Status
Subject
USAID Approval Date
BOQ
Day Work
NTP:
October 23, 2013
NOA:
September 25, 2013
Previous Task Order Amount
Total
BOQ
Day Work
Revised Task Order Amount
Total
BOQ
Day Work
Total
Variation Order Change to Day Work
Project Name
Original Previous Project ID Contract VO Time Duration Extension
Revised Original VO Time Completion Completion Extension Date Date
There were no variation orders received during the current reporting Period for Arraba and Sanur Well Pump Stations.
TO-18-WER-VO Log-April 2014-Monthly Progress Report
Attachment No.22.8 Page 1 of 2
Task Order: Projects:
NTP: October 23, 2013 NOA: September 25, 2013
Task Order: 00018-WER Project 1-ARW Arraba Well Pump Station Rehabilitation & Infrastructure Improvements Project 2-SNW Sanur Well Pump Station Rehabilitation & Infrastructure Improvements
VOR Log Reference
VOR no.
Date
Revision Date
Time Modification
Modification Cost ($)
Shop Drawings/ Submittal/ Specifications
BOQ Item no.
VO no.
Subject
Status
RFI/ Other
There were no variation order requests issued during the current reporting period for Arraba and Sanur Well Pump Stations.
TO-18-WER-VOR Log-April 2014-Monthly Progress Report
Attachment No.22.8 Page 2 of 2
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
ARW 22.9 Employment Generated Data
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 11
Welll Rehabilitation Project Arraba Well Pump Station IRD Al-Abbasi
Site Staff Job Days ** Worker/Classification (Hours)
8
4
4
8
8
16
8
April 3, 2013
4
4
4
12
8
4
4
8
8
16
8
8
Total Other
12
Total Unskilled
4
Total Skilled
4
Total Engineers
4
24
Total Management
April 2, 2013
8
48
16
8
8
3
3
5
6
4
16
24
8
8
3
3
4
2
5
16
24
8
8
3
3
5
2
5
0
0
0
0
3
Supervisor
8
Geological
8
Welder
4
Surveyor Assistant
4
Surveyor
Superintendent
8
Janitor
Site Engineer
12
Janitor (F)
Office Engineer
4
Other
Guard
Civil Engineer (F)
4
Equipment Operator
Decument Control Engineer(F)
4
Unskilled labor
Forman
Project Manager #1, #2, etc ..
April 1, 2013
Skilled Labor
DATE
Safety & Envi. Manager
Skilled labor
Quality Control Manager
Engineers
Task Order Manager
Management
Man-days*
Unskilled Labor
Sub-project or Activity Name: CONTRACTOR: SUBCONTRACTOR:
Flagman
Task Order Name:
USAID WEST BANK/ GAZA INFRASTRUCTURE NEEDS PROGRAM INPII CONTRACT NO. AID-294-I-00-12-00003 TASK ORDER NO. AID-294-TO-13-00018 Wells Rehabilitation Project-WER TEMPORARY JOB DAYS REPORT
24
April 4, 2013 April 5, 2013
4
4
4
12
8
4
4
April 6, 2013
4
4
4
12
8
4
4
8
8
16
3
April 7, 2013
4
4
4
12
8
4
4
8
8
8
15
April 8, 2013
4
4
4
12
8
4
4
8
April 9, 2013
4
4
4
12
8
4
4
8
8
16
3
April 10, 2013
4
4
4
12
8
4
4
8
8
16
9
24
8
8
3
2
0
0
5
24
24
8
8
3
3
3.375
3
5
32
24
8
8
3
3
3.875
4
7
24
8
8
3
3
0
0
5
40
24
8
8
8
8
3
3
3.375
5
7
40
24
8
8
8
8
3
3
4.125
5
7
0
0
0
0
3
8
8
24
April 11, 2013 April 12, 2013
4
4
4
12
8
4
4
8
8
16
24
40
24
8
8
8
8
3
3
6
5
7
April 13, 2013
4
4
4
12
8
4
4
8
8
8
4
40
24
8
8
8
8
3
3
2.5
5
7
April 14, 2013
4
4
4
12
8
4
4
8
8
8
24
24
8
8
8
8
3
3
2
3
7
April 15, 2013
4
4
4
12
8
4
4
8
8
8
8
24
8
8
8
8
3
3
2.25
1
7
April 16, 2013
4
4
4
12
8
4
4
8
8
40
8
24
24
8
8
8
8
3
3
7
3
7
April 17, 2013
4
4
4
12
8
4
4
8
8
40
16
24
24
8
8
8
8
3
3
8.625
3
7
8
8
16
24
0
0
2
2
3
24
24
8
8
8
8
3
3
4
3
7
April 18, 2013
2 5
April 19, 2013
4
4
4
12
8
4
4
8
8
16
8
April 20, 2013
4
4
4
12
8
4
4
8
8
16
8
8
24
12
8
8
8
8
3
3
5
3
5.5
April 21, 2013
4
4
4
12
8
4
4
8
8
40
8
24
24
24
8
8
8
8
3
3
10
3
7
April 22, 2013
4
4
4
12
8
4
4
8
8
16
8
16
24
24
8
8
8
8
3
3
6
3
7
April 23, 2013
4
4
4
12
8
4
4
8
8
40
8
40
24
24
8
8
8
8
3
3
12
3
7
April 24, 2013
4
4
4
12
8
4
4
8
8
8
32
40
24
8
8
8
8
3
3
6
5
7
0
0
0
0
3
24
April 25, 2013 April 26, 2013
4
4
4
12
8
4
4
8
8
24
8
26
16
24
8
8
8
8
3
3
8.25
2
7
April 27, 2013
4
4
4
12
8
4
4
8
8
24
8
10
16
24
8
8
8
8
3
3
6.25
2
7
April 28, 2013
4
4
4
12
8
4
4
8
8
8
16
32
24
8
8
8
8
3
3
4
4
7
April 29, 2013
4
4
4
12
8
4
4
8
8
8
16
32
12
8
8
8
8
3
3
4
4
5.5
April 30, 2013
4
4
4
12
8
4
4
8
8
8
16
32
24
8
8
8
8
3
3
4
4
7
Total of Month
104
104
104
312
208
104
104
200
192
240
301
680
688
208
208
160
160
78
77
129
85
178
INP II Geo-MIS-TO-18-WER-April 2014.xlsx April 2014-Data Sheet-P1-ARW
296
0
0
0
0
Att. 22.9-Employment Generated Data
USAID WEST BANK/ GAZA INFRASTRUCTURE NEEDS PROGRAM INPII CONTRACT NO. AID-294-I-00-12-00003 TASK ORDER NO. AID-294-TO-13-00018 Wells Rehabilitation Project-WER
Temproray Job Days Summary Report Task Order Name:
Wells Rehabilitation Project-WER
PERIOD FROM: Oct-23-2013 (NTP)
Sub-project or Activity Name:
Project 1-ARW Arraba Well Pump Station
PERIOD TO:
CONTRACTOR:
IRD
Site Staff Job Days**
Date Month October November December January February March April May June July August September
Year
Management
Engineers
Skilled Labor
Unskilled Labor
Other
2013 2013 2013 2014 2014 2014 2014 2014 2014 2014 2014 2014
5 44 53 65 64 75 78
0 0 21 60 59 78 77
0 4 30 100 57 172 129
0 5 14 55 87 124 85
0 1 27 128 150 149 178
Total of FY 2014 October November December January February March April May June July August September
2014 2014 2014 2015 2015 2015 2015 2015 2015 2015 2015 2015
Total of FY 2015
INP II Geo-MIS-TO-18-WER-April 2014.xlsx P1-ARW Summary Sheet
No of Full Time Equivalent (FTE) Jobs in the Month*
Total Job Days 5 53 144 408 417 597 547 0 0 0 0 0
0 2 6 17 18 25 23 0 0 0 0 0
2171
91.20798319
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0
0
Notes of Comments
Att. 22.9-Employment Generated Data
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
ARW 22.10 Risk Register Log
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 12
Infrastructure Needs Program INP II Task Order No.: TO‐294‐13‐00018 Project: Wells Rehabilitation and Infrastructure Improvements RISK IDENTIFICATION REF
CATEGORY
RISK
RISK CAUSE
RISK ASSESSMENT IMPACT/CONSEQUENCE
RAISED BY
DATE RAISED
PROBLTY.
IMPACT
RISK RATING
COST IMPACT
RISK RESPONSE SCHEDULE IMPACT
MONITORING & CONTROLLING
RESPONSE STRATEGY
RESPONSE PLAN
RISK OWNER
STATUS
IRD
Still existing
1
Construction
Interruption or damage of underground utilities
The risk lies during excavation work and demobilization in hitting or damaging the underground utilities such as 10" pipe and/or the buried electric cables
Delay in work, water shortage , electric shortage, injuries
Contractor
19th of March,.2014
2
2
4
No
Yes
Mitigate
During the excavation process, the contractor took all safety measures to avoid hitting or damaging these utilities and coordinated with local authorities to figure out the location of such utilities. Crossing the excavated area of the RW has been supported by steel supporting jacks to avoid bending and breaking of the 10" pipe during pumping process.
2
Complexity
Archeological discoveries
The risk lies if there is any archeological places in the excavation area
Delay in work
Contractor
Dec, 2013
2
3
6
No
No
Accept
suspected area avoided bending approval from the archeological department
IRD
Finished
3
Construction
Construction activities in energized environment
This is an existing pumping station where power supply and electric boards shall be maintained according to contract until the last phase of construction
Might Occur
Contractor
1st of Dec, 2013
1
3
3
No
No
Mitigate
All power cables were isolated and protected. Tag-out lock-out procedure on electric boards is implemented.
IRD
Existing
4
External
Soil movement or sliding of the cliff at Arraba well
The risk of sliding of cliff or soil movement
Delay in work, injuries, and equipment damage due sliding or rolling the rocks or soil on the station equipment
Contractor
19th March, 2014
2
3
6
No
No
Mitigate
All mitigation and safety measures are taken as detailed in the excavation safety plan
IRD
Finished
NOTES
Att. ARW 22.10 Risk Register Log
TO-13-00018 (WER)- April 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
CONSTRUCTION MONTHLY PROGRESS REPORTATTACHMENTS Reporting Period: April 01April 30, 2014 PROJECT 2-SANUR WELL PUMP STATION-SNW
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. 13
TO-13-00018 (WER)- April. 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Attachments
SNW 22.1 SNW 22.2 SNW 22.3 SNW 22.4 SNW 22.5 SNW 22.6 SNW 22.7 SNW 22.8 SNW 22.9 SNW 22.10
Updated Schedule- Roll-up and One Month Look Ahead “S” Curve Site Memos Log Material and Equipment Delivered to Site Inspection Requests Log Submittals Log Requests for Information Log Variation Order Request Log Employment Generated Data Risk Register Table
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government.
TO-13-00018 (WER)- April. 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
SNW 22.1 Updated Schedule- Roll-up and One Month Look Ahead
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government.
RFTOP WATER-294-13-00018 WELL REHABILITATION IMPROVEMENTS Activity ID
Activity Name
Total
01-May-14 Original Early Start Duration
Early Finish
Actual Duration
Actual Start
Actual Finish
Total Float
365
01-May-14 26-Jul-15
136
23-Oct-13
0
365
01-May-14 26-Jul-15
136
23-Oct-13
0
501
03-May-14 26-Jul-15
144
23-Oct-13
-92
20-Jul-15 26-Jul-15 03-May-14 01-Jul-15
126 105 57
23-Oct-13 01-Dec-13 24-Oct-13
-92 -86
Mobilization
501 453 24
Submittals
415
03-May-14 26-Jul-15
141
31-Oct-13
45 362 260 260 77 104 83 127 207 152 104 137 111 85 81 315 190 228 295 362 362 141 77 0 292
03-May-14 03-May-14 03-May-14 23-Jun-14 03-May-14 23-Jun-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 08-Jun-14 08-Jun-14 26-Jul-15 01-May-14
25-May-15 21-Jan-15 21-Jan-15 12-Aug-14 01-Jul-14 14-Oct-14 14-Oct-14 21-Jan-15 27-Oct-14 26-Aug-14 27-Oct-14 19-Jul-14 19-Jul-14 08-Jun-14 31-Mar-15 27-Oct-14 19-Feb-15 31-Mar-15 25-May-15 25-May-15 07-Dec-14 17-Sep-14 26-Jul-15 14-Jun-15
115 129 90 84 10 46 0 0 0 90 66 76 56 26 56 106 100 0 59 115 115 0 0 0 0
31-Oct-13 14-Nov-13 06-Jan-14 07-Jan-14 12-Apr-14 07-Jan-14
292 45 254 254 175 253 207 144 185 148 98 180 143 93 288 45 234 234 175 182 172
01-May-14 01-May-14 01-May-14 01-May-14 05-May-14 15-Sep-14 31-Oct-14 15-Sep-14 21-Oct-14 07-Dec-14 21-Oct-14 02-Nov-14 18-Dec-14 02-Nov-14 01-May-14 01-May-14 01-May-14 01-May-14 05-May-14 08-Nov-14 08-Nov-14
14-Jun-15 25-Jun-14 21-Apr-15 21-Apr-15 02-Jan-15 26-May-15 26-May-15 06-Feb-15 08-Jun-15 08-Jun-15 19-Feb-15 14-Jun-15 14-Jun-15 25-Feb-15 08-Jun-15 25-Jun-14 25-Mar-15 25-Mar-15 02-Jan-15 09-May-15 29-Apr-15
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
RFTOP WATER-294-13-00018 WATER-294-13-00 WELL REHABILITATION & IMPROVEMENTS Milestones General Milestones Intermediate Milestones
Pre Construction Submittals Construction Submittals Material Submittals Civil Earth Works Concrete Works Roads Works Miscellaneous Building Works Mechanical Local Manufacturer Abroad Manufacturer Manufacture ( Long Lead Items) Electrical Abroad Manufacturer Manufacture ( Long Lead Items) Local Manufacturer Shop Drawings Civil Mechanical Electrical Methods Statement & Wo Work Plans Civil Mechanical Electrical Post Construction Submittals
Procurement Mechanical, Electrical Equipm Equipments&Instrumentation,...etc- for Arrabeh Well Donation Number Process Material Order & Manufact Manufacture Mechanical Equipment Electrical Equipment Material Shipment Mechanical Equipment Electrical Equipment Ashdod Port/Bridge Clearance Clear Mechanical Equipment Electrical Equipment Transport to Site (Ashdod Port to Site) Mechanical Equipment Electrical Equipment Mechanical, Electrical Equipm Equipments&Instrumentation,...etc for Sanur Well Donation Number Process Material Order & Manufact Manufacture Mechanical Equipment Electrical Equipment Material Shipment Mechanical Equipment
( New Bar ) Remaining Work Milestone
20-Feb-14 14-Nov-13 14-Nov-13
Q
Q
Q
Q
Q
Q
Q
Q
N D J F M A M J J A S O N D J F M A M J J A S O N
08-Jan-14 0 31-Mar-14 53 155 50 94 179 131 129 48 120 168 -48 300 23 330 0 121 34 -7 -42 -42 80 149 0 -53 -53 20 -53 -62 24 -75 -86 34 -60 -69 27 -60 -69 27 -54 20 -44 -44 10 -72 -62
Date Revision Checked Approved 23-Apr-14 Sr.Planning Eng.M. AbuSha... CM/Deputy Prog.-Iv... Naim Mani-Prog Direc...
Summary
Actual Work Critical Remaining Work
06-Jan-14 10-Feb-14 06-Jan-14 06-Feb-14 13-Mar-14 06-Feb-14 17-Dec-13 17-Dec-13
Q
Roll Up Schedule - April, 2014
Activity ID
Activity Name Electrical Equipment Ashdod Port/Bridge Clearance Clear Mechanical Equipment Electrical Equipment Transport to Site (Ashdod Port to Site) Mechanical Equipment Electrical Equipment Steel Pipes,Fittings&Valves Material Order & Manufact Manufacture All Needed Pipes,Steel Pipes & Fittings Valves Material Delivary All Needed Pipes,Steel Pipes & Fittings Valves
Execution Phase Project 1 Arraba Well Pump S Station Rehabilitation & Infrastructure Improvements Mobilization for P1 P1 - Arraba Well Pump Station Sta Rehabilitation Design Review After Well Development Results Delays Due to Geophys Geophysical Logging Final Acceptance P1 - Arraba Well Pump Station Sta Infrastructure Improvement Demolishing,Site Development,Apply Devel Safety Measurments&Site Preparation Construction of New Pump P Station Retaining Walls Retaining Wall Group Gr #1 Civil & Structural Structur Works Retaining Wall Group Gr #2 Civil & Structural Structur Works Retaining Wall Group Gr #3 Civil & Structural Structur Works Boundary Wall Group Gr #4 Civil & Structural Structur Works Retaining Wall Group Gr #5 Civil & Structural Structur Works Retaining Wall Group Gr #6 Civil & Structural Structur Works Balance Tank 1000 m3 m Civil & Structural Works Finishing Works Metal Fabricate Fabricated Works Mechanical Works Electrical & Instrumentation Instru Works Test Water Tightness Tightn For Reservoir Booster Pump System Syste Civil & Structural Works Steel Structure & Metal Works Mechanical Works Electrical & Instrumentation Instru Works Coatings & Finish Finishing Works Septic & Seepage Tank Ta Civil & Structural Works Plumbing Works Finishing Works Electrical & Control B Building Civil & Structural Works Finishing Works Mechanical Works Electrical & Instrumentation Instru Works HVAC-Plumping
( New Bar )
Original Early Start Duration
131 132 120 92 128 111 88 82 72 60 81 32 12 12 365 361 24 63 120 1 383 43 350 45 35 35 37 37 37 37 41 41 36 36 35 35 299 247 90 5 83 220 14 319 171 45 261 157 14 93 93 44 7 209 81 22 37 195 10
29-Dec-14 14-Dec-14 14-Dec-14 02-Feb-15 30-Dec-14 30-Dec-14 19-Feb-15 11-Oct-14 11-Oct-14 11-Oct-14 12-Oct-14 20-Dec-14 20-Dec-14 20-Jan-15 01-May-14 01-May-14
01-May-14 01-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 14-May-14 14-May-14 19-May-14 19-May-14 03-May-14 03-May-14 11-May-14 11-May-14 19-May-14 19-May-14 03-May-14 03-May-14 18-Dec-14 06-Apr-15 04-Jan-15 23-Jul-14 27-Apr-15 08-Jun-14 08-Jun-14 06-Jan-15 26-Aug-14 21-Dec-14 05-Mar-15 24-Jun-14 24-Jun-14 01-Sep-14 15-Oct-14 27-Oct-14 27-Oct-14 07-Feb-15 07-Feb-15 12-Nov-14 17-Jun-15
Early Finish
09-May-15 26-May-15 12-May-15 26-May-15 08-Jun-15 18-May-15 08-Jun-15 04-Feb-15 20-Jan-15 20-Dec-14 20-Jan-15 04-Feb-15 04-Jan-15 04-Feb-15 26-Jul-15 20-Jul-15
29-Aug-14 01-May-14 11-Jul-15 13-May-14 11-Jul-15 23-Jun-14 11-Jun-14 11-Jun-14 14-Jun-14 14-Jun-14 16-Jun-14 16-Jun-14 18-Jun-14 18-Jun-14 21-Jun-14 21-Jun-14 23-Jun-14 23-Jun-14 13-May-15 14-Mar-15 12-Apr-15 12-Apr-15 19-Apr-15 27-Apr-15 13-May-15 11-Jul-15 14-Jan-15 08-Mar-15 11-Jul-15 01-Jul-15 22-Mar-15 27-Oct-14 27-Oct-14 27-Oct-14 22-Oct-14 07-Jul-15 07-Feb-15 05-Mar-15 23-Mar-15 07-Jul-15 29-Jun-15
Remaining Work Milestone
0 0 0 0 0 0 0 0 0 0 0 0 0 0 135 135 57 86 48 48 96 96 17 17 1 1 9 9 9 9 9 9 9 9 9 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Actual Start
24-Oct-13 24-Oct-13 24-Oct-13 25-Dec-13 14-Mar-14 14-Mar-14 30-Dec-13 30-Dec-13 10-Apr-14 10-Apr-14 10-Apr-14 10-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14
Actual Finish
Total Float
Q
Q
Q
Q
Q
Q
Q
Q
Q
N D J F M A M J J A S O N D J F M A M J J A S O N
-75 -61 -49 -61 -61 -49 -61 13 13 25 14 13 35 14 -65 -61 08-Jan-14 28-Mar-14 -85 -85 -71 -42 -71 29 29 29 29 29 29 29 29 29 29 29 29 29 -32 -42 -42 -42 -42 -32 -32 -71 5 5 -71 -74 3 130 130 120 110 -79 2 2 2 -79 -72
Date Revision Checked Approved 23-Apr-14 Sr.Planning Eng.M. AbuSha... CM/Deputy Prog.-Iv... Naim Mani-Prog Direc...
Summary
Actual Work Critical Remaining Work
Actual Duration
Roll Up Schedule - April, 2014
Activity ID
Activity Name Chlorination & Stora Storage Building Civil & Structural Works Finishing Works Mechanical Works Electrical & Instrumentation Instru Works HVAC-Plumping Living Quarters Buil Building Civil & Structural Works Finishing Works Mechanical Works Electrical & Instrumentation Instru Works HVAC-Plumping Electrical Metering B Building Civil & Structural Works Finishing Works Electrical & Instrumentation Instru Works HVAC-Plumping Pads & Slabs Civil & Structural Works Electrical & Instrumentation Instru Works Mechanical Works Well Systems Wellhead and Pad (Structural) Mechanical Electrical & Instrumentation Instru Works Yard Works & Site Electrical El Power External & Finishing Finishi Works Mechanical Works Electrical & Instrumentation Instru Works Flow Control Valve for Mirka Existing Balance Tank & Arraba Existing RSV (O&M),Inspection,Commissioning,Start Up & Training for P1 (O&M),Inspection,Commi Initial Operation & Manufacturer Man Technical Manual Submittals (O&M) Approval - Final Operat Operation & Manufacturer Technical Manual Submittals (O&M) Certificate of Proper Installation Ins for Installed Equipments&Installation (Pre Commissioning) Training Phase Comissioning & Start Up U Phase for All System Demobilization,Close Out&Handing Out Over for P1 Project 2 Sanur Well Pump S Stations Rehabilitation & Infrastructure Improvements Mobilization for P2 P2 - Sanur Well Pump Station Stat Rehabilitation Delay of the Pump Switching Swit Off Delay due to Fishing-E Fishing-Extraction of Fallen Strainer from Sanur Well Design Review After Well Development Results P2: Sanur Well Pump Station Stat Infrastructure Improvement Demolishing,Site Development,Apply Devel Safety Measurments&Site Preparation Construction of New Pump P Station Balance Tank 1000 m3 m Civil & Structural Works Finishing Works Metal Fabricate Fabricated Works Mechanical Works Electrical & Instrumentation Instru Works Test Water Tightness Tightn For Reservoir Booster Pump System Syste Civil & Structural Works Steel Structure & Metal Works Mechanical Works Electrical & Instrumentation Instru Works Coatings & Finish Finishing Works
( New Bar )
Original Early Start Duration
219 67 83 188 212 5 308 67 127 142 296 136 336 75 130 327 5 111 43 88 68 215 47 15 5 139 67 24 139 20 316 218 208 6 11 5 5 365 24 33 1 4 120 326 13 316 282 230 55 5 76 203 14 219 38 40 177 78 14
26-Aug-14 26-Aug-14 18-Nov-14 06-Sep-14 03-Sep-14 28-Apr-15 24-May-14 24-May-14 21-Aug-14 06-Aug-14 07-Jun-14 08-Sep-14 03-May-14 03-May-14 10-Aug-14 07-May-14 20-Jun-15 30-Nov-14 30-Nov-14 18-Dec-14 25-Jan-15 14-Oct-14 14-Oct-14 14-Jun-15 14-Jun-15 14-Jan-15 14-Jan-15 25-Jan-15 14-Jan-15 25-Jan-15 15-Jun-14 15-Jun-14 07-Aug-14 01-Jul-15 01-Jul-15 08-Jul-15 14-Jul-15 01-May-14
Early Finish
24-May-15 18-Nov-14 04-Mar-15 28-Apr-15 24-May-15 04-May-15 14-Jun-15 21-Aug-14 28-Jan-15 01-Feb-15 14-Jun-15 01-Mar-15 25-Jun-15 10-Aug-14 19-Jan-15 20-Jun-15 25-Jun-15 18-Apr-15 25-Jan-15 09-Apr-15 18-Apr-15 01-Jul-15 08-Dec-14 01-Jul-15 20-Jun-15 01-Jul-15 08-Apr-15 25-Feb-15 01-Jul-15 21-Feb-15 14-Jul-15 23-Mar-15 22-Apr-15 08-Jul-15 14-Jul-15 14-Jul-15 20-Jul-15 26-Jul-15
01-May-14 20-May-14 01-May-14 18-May-14 03-May-14 03-May-14 14-May-14 14-May-14 14-May-14 26-Jan-15 29-Mar-15 04-Jan-15 10-Aug-14 19-Apr-15 08-Jun-14 08-Jun-14 03-Aug-14 03-Aug-14 01-Jul-14 01-Mar-15
06-May-14 15-Sep-14 13-Jun-15 17-May-14 13-Jun-15 05-May-15 05-Mar-15 04-Apr-15 04-Apr-15 11-Apr-15 19-Apr-15 05-May-15 17-Mar-15 03-Aug-14 18-Sep-14 12-Mar-15 18-Oct-14 17-Mar-15
Remaining Work Milestone
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 135 57 23 18 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Actual Start
24-Oct-13 24-Oct-13 29-Mar-14 01-Apr-14 24-Apr-14
Actual Finish
Total Float
Q
Q
Q
Q
Q
Q
Q
Q
Q
N D J F M A M J J A S O N D J F M A M J J A S O N
-41 80 18 -24 -41 -24 -59 117 48 48 -59 31 -69 171 58 -69 -69 -10 43 -3 -10 -74 89 -74 -64 -67 -2 41 -74 18 -68 -14 -14 -74 -68 -74 -74 -65 08-Jan-14 -35 19-Apr-14 -50 -71 -55 -18 -55 -25 -25 -18 -18 -18 -25 -25 20 102 121 24 121 7
Date Revision Checked Approved 23-Apr-14 Sr.Planning Eng.M. AbuSha... CM/Deputy Prog.-Iv... Naim Mani-Prog Direc...
Summary
Actual Work Critical Remaining Work
Actual Duration
Roll Up Schedule - April, 2014
Activity ID
Activity Name Septic & Seepage Tank Ta Plumbing Works Finishing Works Civil & Structural Works Electrical & Control B Building Civil & Structural Works Finishing Works Mechanical Works Electrical & Instrumentation Instru Works HVAC-Plumping Chlorination & Stora Storage Building Civil & Structural Works Finishing Works Mechanical Works Electrical & Instrumentation Instru Works HVAC-Plumping Living Quarters Buil Building Civil & Structural Works Finishing Works Mechanical Works Electrical & Instrumentation Instru Works HVAC-Plumping Electrical Metering B Building Civil & Structural Works Finishing Works Electrical & Instrumentation Instru Works HVAC-Plumping Pads & Slabs Civil & Structural Works Electrical & Instrumentation Instru Works Mechanical Works Finishing Works Well Systems Wellhead and Pad (Structural) Mechanical Electrical & Instrumentation Instru Works Yard Works,Widening&Upgrading Works,Widening of Existing Main Road Entrance & Site Electrical Power External & Finishing Finishi Works Electrical & Instrumentation Instru Works Mechanical Works Flow Control Valve for Jaba Existing Balance Tank&Kafr Rai Existing PS Balance Tank (O&M),Inspection,Commissioning,Start Up & Training (O&M),Inspection,Commi Initial Operation & Manufacturer Man Technical Manual Submittals (O&M) Approval - Final Operat Operation & Manufacturer Technical Manual Submittals (O&M) Certificate of Proper Installation Ins for Installed Equipments&Installation (Pre Commissioning) Training Phase Comissioning & Start Up U Phase for All System Demobilization,Close Out&Handing Out Over Project 3 Saadeh Well Pump Station Rehabilitation P3 - Saadeh Well Pump Station St Rehabilitation Mobilization for P3 Execution Demobilization,Close O Out&Handing Over for P3
( New Bar )
Original Early Start Duration
78 28 7 78 189 77 26 37 181 10 220 73 21 90 213 5 138 70 61 125 66 53 126 76 16 117 5 97 39 70 58 2 183 47 17 5 74 73 74 24 20 288 196 184 6 11 5 5 25 25 24 33 7
26-Jun-14 01-Sep-14 21-Sep-14 26-Jun-14 27-Oct-14 27-Oct-14 01-Feb-15 07-Feb-15 05-Nov-14 12-May-15 25-Aug-14 25-Aug-14 24-Nov-14 04-Sep-14 02-Sep-14 06-Jan-15 17-Aug-14 17-Aug-14 12-Nov-14 26-Aug-14 31-Aug-14 30-Nov-14 26-Oct-14 26-Oct-14 28-Jan-15 30-Oct-14 24-Mar-15 13-Dec-14 13-Dec-14 04-Jan-15 03-Feb-15 04-Apr-15 27-Oct-14 27-Oct-14 18-May-15 18-May-15 25-Jan-15 25-Jan-15 25-Jan-15 03-Feb-15 03-Feb-15 03-Aug-14 03-Aug-14 16-Sep-14 07-Jul-15 07-Jul-15 14-Jul-15 20-Jul-15
Early Finish
13-Oct-14 09-Oct-14 29-Sep-14 13-Oct-14 13-Jun-15 01-Feb-15 05-Mar-15 23-Mar-15 13-Jun-15 24-May-15 24-May-15 24-Nov-14 18-Dec-14 24-Dec-14 24-May-15 14-Jan-15 08-Feb-15 12-Nov-14 28-Jan-15 01-Feb-15 22-Nov-14 08-Feb-15 30-Mar-15 28-Jan-15 19-Feb-15 24-Mar-15 30-Mar-15 14-Apr-15 03-Feb-15 04-Apr-15 14-Apr-15 06-Apr-15 07-Jun-15 21-Dec-14 07-Jun-15 24-May-15 25-Apr-15 23-Apr-15 25-Apr-15 05-Mar-15 01-Mar-15 20-Jul-15 04-Apr-15 04-May-15 14-Jul-15 20-Jul-15 20-Jul-15 26-Jul-15
Remaining Work Milestone
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 106 106 57 97 0
Actual Start
Actual Finish
Total Float
Q
Q
Q
Q
Q
Q
Q
Q
Q
N D J F M A M J J A S O N D J F M A M J J A S O N
132 135 92 92 -58 -2 2 2 -58 -41 -41 75 75 75 -41 66 48 51 48 48 108 48 6 34 34 6 6 -7 29 -7 -7 -7 -53 78 -53 -41 -16 -15 -16 -16 11 -79 -60 -24 -79 -79 -79 -79 24-Oct-13 24-Oct-13 24-Oct-13 01-Dec-13 11-Mar-14
20-Mar-14 20-Mar-14 09-Jan-14 20-Mar-14 11-Mar-14
Date Revision Checked Approved 23-Apr-14 Sr.Planning Eng.M. AbuSha... CM/Deputy Prog.-Iv... Naim Mani-Prog Direc...
Summary
Actual Work Critical Remaining Work
Actual Duration
Roll Up Schedule - April, 2014
RFTOP WATER-294-13-00018 WELL REHABILITATION IMPROVEMENTS Activity ID
01-May-14
Activity Name
Original Early Start Duration
Early Finish
Actual Duration
Actual Start
Actual Finish
Total Float
Q
Q
Q
Q
Q
Q
Q
Q
Q
N D J F M A M J J A S O N D J F M A M J J A S O N
RFTOP WATER-294-13-00 WATER-294-13-00018 WELL REHABILITATION & IMPROVEMENTS Milestones Intermediate Milestones MS00065 MS00068
Start of Infrastructure Improvement for Sanour Well Pump Station Completion of Rehabilitation for Sanour Well Pump Station
0 0
03-May-14 20-May-14
0 0
-27 -49
Prep.&Submit Sealants Caulking & Grout- Product Data & Sample
7
03-May-14 10-May-14
0
-19
5
03-May-14 07-May-14
0
-21
Start of Infrastructure Improvement for Sanour W Completion of Rehabilitation for Sanour Well
Submittals Construction Submittals Material Submittals Civil Building Works
CS760
Mechanical Abroad Manufacturer ( Long Lead Items)
CS291
Prep&Submit Horizantal Louver Blinds - Sample
Electrical Abroad Manufacturer ( Long Lead Items)
CS1150 CS1170
Prep.&Submit Padmounted Transformers - Product Data Prep.&Submit Variable Frequency Drive Units 400V - Product Data
5 5
03-May-14 07-May-14 03-May-14 07-May-14
0 0
-36 -55
CS1280
Prep.&Submit PLC-Based Control Systems Hardware&Software - Product Data
5
03-May-14 07-May-14
0
-71
CS1290 CS1300
Prep.&Submit In-Line Flow Measuring Systems - Product Data Prep.&Submit Liquid Flow Detection Devices - Product Data
5 5
03-May-14 07-May-14 03-May-14 07-May-14
0 0
-61 -61
CS1350
Prep.&Submit Analyzer Measuring Systems - Product Data&Certificates
5
03-May-14 07-May-14
0
-47
CS1360
Prep.&Submit Control Panel Instrumentation - Product Data&Certificates
5
03-May-14 07-May-14
0
-47
Shop Drawings
Approval of Formwork Shop Drawing Details for Balance & Shop Drawing Tank 10
Execution Phase Project 1 Arraba Well Pump S Station Rehabilitation & Infrastructure Improvements Design Review After Well Development De Results
P1-CS210
Design Review for arrabeh Well
120
01-May-14 29-Aug-14
0
1
01-May-14 01-May-14
48
-85
Delays Due to Geophysical Geophysica Logging Final Acceptance
Delay-0010
Delays in Geophysical Final Acceptance
14-Mar-14
-85
Delays in Geophysical Final Acceptance
P1 - Arraba Well Pump Station Statio Infrastructure Improvement Demolishing,Site Develop Development,Apply Safety Measurments&Site Preparation
P1-DEMO-000020
Erosion & Sediment Control Systems
10
03-May-14 13-May-14
0
P1-DEMO-000030
Miscellaneous Excavation
3
03-May-14 03-May-14
38
-42
P1-DEMO-000040
Lab Test Report for Soil Bearing Capacity
3
03-May-14 05-May-14
0
-42
10 10
03-May-14 13-May-14 14-May-14 25-May-14
0 0
-42 -42
18-Mar-14
-42
Miscellaneous Excavation
Construction of New Pump Pum Station Balance Tank 1000 m3 Civil & Structural Works Wo
P1-BT-000010 P1-BT-000020
Apply Safety Measurement/Excavation to the Required Depth for the Base slab Supply and Spread 25cm B/C With Compaction Test & under ground Piping (Perforated Pipes)
P1-BT-000030
Casting Lean Concrete Under Balance Tank
1
26-May-14 26-May-14
0
-42
P1-BT-000040
Concrete Curing
7
27-May-14 03-Jun-14
0
-42
P1-BT-000050
Form/Steel Rebars for Base Slab/Installing Water Stop
20
27-May-14 18-Jun-14
0
-42
9 10
01-May-14 08-May-14 08-May-14 18-May-14
8 0
2
18-May-14 20-May-14
0
Project 2 Sanur Well Pump S Stations Rehabilitation & Infrastructure Improvements P2 - Sanur Well Pump Station Rehabilitation
P2-DEV-110 P2-DEV-115
Well Development,Logging and Water Sampling Well Yield Testing, Logging Per Specification
P2-DEV-120
Restoration & Rig.Demobilization
23-Apr-14
-71 -71
Well Development,Logging and Water Samplin
-49
Delay due to Fishing-Extr Fishing-Extraction of Fallen Strainer from Sanur Well
( New Bar )
Date Revision Checked Approved 23-Apr-14 Sr.Planning Eng.M. AbuSha... CM/Deputy Prog.-Iv... Naim Mani-Prog Direc...
Summary
Actual Work Remaining Work Critical Remaining Work Milestone
One Month Look Ahead
Activity ID
Activity Name
Delay-0050 Delay-0060
Original Early Start Duration
Conducting fishing attempts Video survey after fishing
Early Finish
Actual Duration
Actual Start
Actual Finish
Total Float
5 1
01-May-14 05-May-14 06-May-14 06-May-14
0 0
-70 -70
120
18-May-14 15-Sep-14
0
-71
3
03-May-14 05-May-14
0
-25
Q
Q
Q
Q
Q
Q
Q
Q
Q
N D J F M A M J J A S O N D J F M A M J J A S O N
Design Review After Well Development De Results
P2-CS220
Design Review for Sanour Well
P2: Sanur Well Pump Station Infrastructure Improvement Demolishing,Site Develop Development,Apply Safety Measurments&Site Preparation
P2-DEMO-35
Site Fencing & Apply Safety Measurements
P2-DEMO-40
Excavation for Clearing,Site Grading&Preparation
P2-DEMO-50 P2-DEMO-70
Erosion & Sediment Control Systems Miscellaneous Excavation
P2-DEMO-80
Lab Test Report for Soil Bearing Capacity
7
06-May-14 13-May-14
0
-25
10 3
06-May-14 17-May-14 06-May-14 08-May-14
0 0
-18 -18
3
14-May-14 17-May-14
0
-25
Construction of New Pump Pum Station Balance Tank 1000 m3 Civil & Structural Works Wo
P2-BT-320
Apply Safety Measurement/Excavation to the Required Depth for the Base slab
10
14-May-14 25-May-14
0
-25
P2-BT-330
Supply and Spread 25cm B/C With Compaction Test & under ground Piping (Perforated Pipes)
10
26-May-14 05-Jun-14
0
-25
( New Bar )
Date Revision Checked Approved 23-Apr-14 Sr.Planning Eng.M. AbuSha... CM/Deputy Prog.-Iv... Naim Mani-Prog Direc...
Summary
Actual Work Remaining Work Critical Remaining Work Milestone
One Month Look Ahead
TO-13-00018 (WER)- April. 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
SNW 22.2 “S” Curve
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government.
INTERNATIONAL RELIEF AND DEVELOPMENT, IRD USAID-INFRSTRUCTURE NEEDS PROGRAM (INP)
TASK ORDER NO. AID-294-TO-13-00018 TASK ORDER NO. AID-294-TO-13-00018 PROJECT 1 Arrabeh Well Pump Station - Rehabilitation and Infrastructure Improvements USD $6,516,970.57 23-Oct-13 550 CD 25-Apr-15
Total Contract Value Less Day Work: NTP (Notice to Proceed) Duration of Contract: Completion Date: Data Date:
PROJECT 2 Sanur Well Pump Station - Rehabilitation and Infrastructure Improvements USD $7,011,251.36 23-Oct-13 550 CD 25-Apr-15
Total Contract Value Less Day Work: NTP (Notice to Proceed) Duration of Contract: Completion Date: Data Date:
`
PROJECT 3 Saadeh Well Pump Station - Rehabilitation USD $493,634.98 $376,334.82 23-Oct-13 120 CD 19-Feb-14 11-Mar-14
Total Contract Value Less Day Work: Revised Total Contract Value Less Day Work: NTP (Notice to Proceed) Duration of Contract: Completion Date: Revised Completion Date : Data Date:
TASK ORDER (PROJECT 1, PROJECT 2 & PROJECT 3) USD $14,021,856.91 $700,000.00 $14,721,856.91 $13,904,556.73 $817,300.18 $14,721,856.91
Total Contract Value Less Day Work: Day Work Value: Total Contract Value Including Day Work: Revised Total Contract Value Less Day Work: Day Work Value: Total Contract Value Including Day Work:
PROGRESS S-CURVE & CASH FLOW SCHEDULE Planned Schedule Value Planned Schedule Value (CUM) Actual Schedule Value Actual Schedule Value (CUM) % Planned Schedule % Planned Schedule (CUM) % Actual Schedule %Actual Schedule (CUM)
Oct.13 $89,031.76 $77,902.79 $32,801.17 $32,801.17 1.27% 1.27% 0.47% 0.47%
Nov.13
Dec.13
Jan.14
Feb.14
Mar.14
April.14
May.14
June.14
July.14
Aug.14
$178,063.52 $267,095.28 $121,832.94 $154,634.11 2.54% 3.81% 1.74% 2.21%
$0.00 $281,908.05 $98,403.52 $253,037.63 0.00% 3.81% 1.40% 3.61%
$0.00 $315,880.76 $14,057.65 $267,095.28 0.00% 3.81% 0.20% 3.81%
$50,174.31 $375,724.65 $0.00 $267,095.28 0.72% 4.53% 0.00% 3.81%
$366,069.78 $725,517.34 $0.00 $267,095.28 5.22% 9.75% 0.00% 3.81%
$52,054.25 $898,695.58 $22,917.57 $290,012.85 0.74% 10.49% 0.33% 4.14%
$18,529.80 $934,835.75
$1,629,422.14 $997,990.64
$88,484.74 $1,243,541.31
0.26% 10.75%
23.24% 33.99%
1.26% 35.26%
100.00%
94.68%
$81,638.67 $1,761,611.80
Sep.14 $580,138.98 $2,601,559.21
Oct.14 $134,972.72 $3,021,324.71
Nov.14 $76,571.56 $3,702,761.95
Dec.14 $769,741.05 $6,261,674.86
Jan.15 $685,807.25 $6,527,630.28
Feb.15 $641,052.45 $6,639,899.51
Mar.15 $1,196,820.69 $6,908,943.42
April.15 $372,677.69 $7,011,251.35
TOTAL $7,011,251.36 $7,011,251.35
1.16% 36.42%
8.27% 44.69%
1.93% 46.62%
1.09% 47.71%
10.98% 58.69%
9.78% 68.47%
9.14% 77.61%
17.07% 94.68%
5.32% 100.00%
100% 100%
100.00%
TO-13-00018-WER, Progress S-Curve SNW
90.00%
77.61%
80.00% 68.47%
70.00% 58.69%
60.00% 44.69%
50.00% 33.99%
40.00%
46.62% 47.71%
36.42% 35.26%
30.00% 20.00% 10.00% 0.00%
1.27% 0.47%
3.81% 2.21%
3.81%
3.81%
3.61%
3.81%
Oct.13 Nov.13 Dec.13 % Planned Schedule (CUM) 1.27% 3.81% 3.81% %Actual Schedule (CUM) 0.47% 2.21% 3.61%
10.49%
9.75%
10.75%
4.53% 3.81%
3.81%
4.14%
Jan.14 3.81%
Feb.14 Mar.14 April.14 May.14 June.14 July.14 Aug.14 Sep.14 Oct.14 Nov.14 Dec.14 Jan.15 Feb.15 Mar.15 April.15 4.53% 9.75% 10.49% 10.75% 33.99% 35.26% 36.42% 44.69% 46.62% 47.71% 58.69% 68.47% 77.61% 94.68% 100.00%
3.81%
3.81%
3.81%
4.14%
Attachment No 22. S Curve
TO-13-00018 (WER)- April. 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
SNW 22.3 Site Memos Log
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government.
Infrastructure Needs Program- INP
USAID Contract No. AID-294-I-00-12-00003 Project: Wells Rehabilitation Project
NOA Date: NTP Date: Current as Date:
September 23, 2014 October 25, 2014 May 4, 2014
Site Memoranda From Engineer To Contractor (SM) Number
SM-13-00018-WER-E-C-002
SM-13-00018-WER-E-C-003
Description/Subject
Reference is made to our technical meeting held on April 13, 2014, at the program office in Ramallah with BV well specialist; IRD is requested to proceed with the rehabilitation activities in full compliance with project requirements noting the following exceptions: 1- IRD to supply additional temporary Balancing Tank to allow pumping water to the communities during specified pumping tests. 2- Dynamic logs to be eliminated. 3- IRD to work multiple shifts (24/7). IRD to submit VOR and revised work plan to capture the additions and omissions based on the above. This is for your kind action.
Pulling up of Sanur well existing VLST pump/Reference is made to the above mentioned subject, and to the present construction activities on site, CMC had observed a damaged oil educator pipe that was damaged during pulling up of the Existing Well VLST Pump. Such damaged pipe is not accepted and the contractor is fully responsible for the damages, and accordingly the contractor shall repair or pay to the utility owner for the repair of the damage pipe or replace the damaged pipe according to Specs. Sec. 01640, Para. 1.8-A, B and Specs. Sec. 01040 Para. 1.2-A and Para. 1.3-B.
TO-18-WER-SM Log-April 2014-Monthly Progress Report
Date Received Response Date Comments
April 14, 2014
This regards Sanur Well
April 23, 2014
This regards Sanur Well
Attachment No.22.3 Page 1 of 1
TO-13-00018 (WER)- April. 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
SNW 22.4 Material or Equipment Delivered to Site Log
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government.
Material Log
Task Order: Project:
AID-294-TO-13-00018
Sub-project
Sanur Well Pump Station Rehabilitation and Infrastructure Improvements
Item
Date
Wells Rehabilitation Project
Description
Oty
Location
There were no materials supplied to site during the current reporting period for Sanur Well Pump Station project.
TO-18-SNW-Material Log-April 2014-Monthly Progress Report
Attachment 22.4 Page 1 of 1
Equipment Log
Task Order: Project: Sub-project No. 1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 17 19 20 21 22 23 25 26 27 28 29 30 31 32 33 34 35 36 37 39 40 41 42
Date on Site April 1, 2014
April 2, 2014
April 3, 2014
April 4, 2014
April 5, 2014
April 6, 2014
April 7, 2014
April 8, 2014
April 9, 2014
April 10, 2014
April 11, 2014
April 12, 2014
AID-294-TO-13-00018 Wells Rehabilitation Project Sanur Well Pump Station Rehabilitation & Infrastructure Improvements
Description Rig JCB Back Hole-1993 Generator Set Crane Rig Generator Set Rig JCB Back Hole-1993 Mercedes 416-2002 Generator Set Rig JCB Back Hole-1993 Generator Set Rig JCB Back Hole-1993 Generator Set Rig JCB Back Hole-1993 Generator Set Rig JCB Back Hole-1993 Generator Set Rig JCB Back Hole-1993 Generator Set Mercedes 416-2002 Rig JCB Back Hole-1993 Generator Set Rig JCB Back Hole-1993 Generator Set Rig JCB Back Hole-1993 Generator Set Rig JCB Back Hole-1993 Generator Set
TO-18-SNW-Equipment Log-April 2014-Monthly Progress Report
Quantity in use
Hours
1
2
1
8
Quantity Idle 1 1 1 1 1 1
1
8 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1
8 1 1 1 1 1 1 1 1 1 1 1 1
Attachment 22.4 Page 1 of 3
No. 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92
Date on Site April 13, 2014
April 14, 2014
April 15, 2014
April 16, 2014
April 17, 2014
April 18, 2014
April 19, 2014
April 20, 2014
April 21, 2014
April 22, 2014
April 23, 2014
Description Rig JCB Back Hole-1993 Generator Set Rig JCB Back Hole-1993 Generator Set Mitsubishi L200-2007 Rig JCB Back Hole-1993 Generator Set Mitsubishi L200-2007 Tractor with sprayer Rig JCB Back Hole-1993 Generator Set Mitsubishi L200-2007 Rig JCB Back Hole-1993 Generator Set Mitsubishi L200-2007 Rig JCB Back Hole-1993 Generator Set Level Total Station Rig JCB Back Hole-1993 Generator Set Mitsubishi L200-2007 Crane Rig JCB Back Hole-1993 Generator Set Mitsubishi L200-2007 Crane Rig JCB Back Hole-1993 Generator Set Mitsubishi L200-2007 Crane Rig JCB Back Hole-1993 Generator Set Mitsubishi L200-2007 Crane Rig JCB Back Hole-1993 Generator Set Mitsubishi L200-2007 Crane
TO-18-SNW-Equipment Log-April 2014-Monthly Progress Report
Quantity in use
Hours
Quantity Idle 1 1 1 1 1 1
1
8 1 1 1
1 1
8 8 1 1 1
1
8 1 1 1
1
8 1 1 1
1 1 1
8 8 12 1 1
1 1 1
12 12 24 1 1
1 1 1
12 24 24 1 1
1 1 1
12 24 24 1 1
1 1 1
24 24 24 1 1
1 1
24 24 Attachment 22.4 Page 2 of 3
No. 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121
Date on Site
April 24, 2014
April 25, 2014
April 26, 2014
April 27, 2014
April 28, 2014
April 29, 2014
Description Rig JCB Back Hole-1993 Generator Set Mitsubishi L200-2007 Crane Rig JCB Back Hole-1993 Generator Set Mitsubishi L200-2007 Crane Rig JCB Back Hole-1993 Generator Set Mitsubishi L200-2007 Crane Rig JCB Back Hole-1993 Generator Set Mitsubishi L200-2007 Crane Rig JCB Back Hole-1993 Generator Set Mitsubishi L200 -2007 Crane Rig JCB Back Hole-1993 Generator Set Mitsubishi L200 -2007
TO-18-SNW-Equipment Log-April 2014-Monthly Progress Report
Quantity in use
Hours
1
24
Quantity Idle 1 1
1 1 1
24 24 24 1 1
1 1 1
24 24 24 1 1
1 1 1
24 24 24 1 1
1 1 1
24 24 24 1 1
1 1
24 24 1 1 1
1
8
Attachment 22.4 Page 3 of 3
TO-13-00018 (WER)- April. 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
SNW 22.5 Inspection Requests Log
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government.
Amend-Resubmit Pending Make Correction Noted
Inspection Requests Log IRD/BV
Task Order: Project:
Sender/ Recipient
AID-294-TO-13-00018 Wells Rehabilitation Project IRD/BV
1st Inspection
No.
Request Date
Date Inspection Required
IR-13-00018-SNW-004-B
April 2, 2014
April 3, 2014
IR-13-00018-SNW-005-A
April 29, 2014
April 30, 2014
TO-18-SNW-IR Log-April 2014-Monthly Progress Report
Description of Works Inspected
2nd Inspection
Response Date
Grade
Inspecting site and equipment preparations prior to well shutdown
April 3, 2014
No Exceptions Noted
Inspecting the fabricated fishing tool at Sanur well
April 30, 2014
No Exceptions Noted
Response Date
Grade
Attachment No.22.5 Page 1 of 1
TO-13-00018 (WER)- April. 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
SNW 22.6 Submittals Log
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government.
Contract No. AID-294-TO-13-00018
Task Order: 00018‐WER
SUBMITTAL REGISTER LOG/SCHEDULE
Project 1‐ARW Arraba Well Pump Station
NTP:
23-Oct-13
NOA:
25-Sep-13
Project 2‐SNW Sanur Well Pump Station Project 3‐SDW Saadeh Well Rehabilitation Submittal Categories
Submittal Classification
Identifiers:
Resubmittal Alpha Identifier
PD
PRODUCT DATA
PCS
Preconstruction
WER Wells Rehabilitation Project
SD
SHOP DRAWINGS
CONS
Construction
ARW
AD
ADMINISTRATIVE/OTHER
PSTS
Post construction
TR
SNW
TEST REPORT
SDW
Submittal Disposition/ Color Coding
First Submittal SUB-18-WER-001-A
: Project 1 Identifier : Project 2 Identifier
A – No Exceptions Noted
First RE-Submittal SUB-18-WER-001-B
B - Make Corrections Noted
Second Resubmittal SUB-18-WER-001-C
C- Amend and Resubmit
: Project 3 Identifier
D- Rejected- Resubmit
SCH
SCHEDULE
E- Review Not Required
RPT
REPORT
Submitted Pending Response
SMP
SAMPLE
CO
COMPLETION & CLOSEOUT
MAT
MATERIAL
A
Submittal Number
B
C
Submittal Description
Specification Number
D
E
F
G
Submittal Category
Submittal Classification
Submittal Type
Project Identifier
H
Schedule Activity ID
I
BOQ Item No.
M
J
K
L
Rev.
Contractual Submission Date
Actual Submission Date from Subcontractor
Actual Submission Date
N
O
P
Q
R
S
Submission Delay
Response Needed by (Max. 30 days)
Date Returned to IRD
Total Engineer Response Time
Submittal Disposition (Grade)
Remarks
SUB-00018-WER-049-C
Perforated Conduit
Section 15430- Part 2.2(A)
PD
CONS
SUB
WER
C
March 16, 2014
April 22, 2014
May 22, 2014
April 28, 2014
6
B
SUB-00018-ARW-088-B
Septic Tank and Seepage Pit Shop Drawing (Structural & Architectural) for Arraba
Section 03700-Part 1.3 B and Drawing No: SSC(1,2) from Confirmed General Design
SD
CONS
SUB
ARW
B
March 23, 2014
April 9, 2014
May 9, 2014
April 20, 2014
11
B
SUB-00018-ARW-094-B
Retaining Wall Shop Drawing for Arraba
Drawing No: RWS 2,3,4,5-Rev. General Design
SD
CONS
SUB
ARW
CS329
B
April 16, 2014
April 17, 2014
May 17, 2014
April 23, 2014
6
B
SUB-00018-ARW-095-C
Balance Tank Shop Drawing for Arraba
Section 03700-Part 1.3 B & Drawing No: CSA(1-5),CSS(1,2)-Rev. Confirmed General Design
SD
CONS
SUB
ARW
CS310
C
April 2, 2014
April 13, 2014
May 13, 2014
April 17, 2014
4
B
SUB-00018-ARW-130-B
Butterfly Valve DN:300 mm, PN16 bar
Section 15202, paragraph 2.2(A-E)
PD
CONS
SUB
ARW
CS577
B
March 31, 2014
April 13, 2014
May 13, 2014
April 16, 2014
3
B
SUB-00018-WER-135-B
Cable Tray and Cable Ladder
Section 01300, paragraph 1.8-(B-1-b) and 1.8(B-1-e)
PD
CONS
SUB
WER
B
March 2, 2014
April 13, 2014
May 13, 2014
April 14, 2014
1
B
SUB-00018-WER-138-B
Wiring Devices
Section 16140. Para. 2.2, 2.3, 2.4
PD
CONS
SUB
WER
B
March 13, 2014
April 9, 2014
May 9, 2014
April 14, 2014
5
B
SUB-00018-WER-147-B
Reinforcement Steel Bar-Test Report
Section 03200-Part 2.2-A-2
TR
CONS
Lab Test
WER
B
From main contractor directly
April 7, 2014
May 7, 2014
April 13, 2014
6
B
SUB-00018-ARW-151-B
Lighting and Power Shop Drawing for Arraba Balance Tank
Drawing No: 4E-13-Rev. Arraba Well Pump Station Confirm Documents
SD
CONS
SUB
ARW
B
April 9, 2014
April 15, 2014
May 15, 2014
April 30, 2014
15
B
SUB-00018-SDW-162-C
Final Geophysical Logging
Section 02623
CO
CONS
SUB
SDW
C
From main contractor directly
April 28, 2014
May 28, 2014
SUB-00018-WER-177-B
Pressure Measuring Systems-Pressure Gauges
Section 17108, para.2.1 (A-J)
PD
CONS
SUB
WER
B
March 29, 2014
April 1, 2014
May 1, 2014
April 8, 2014
7
B
SUB-00018-ARW-187-B
Completion Report for Geophysical Static Logging -Arraba Well
April 23, 2014
May 23, 2014
SUB-00018-WER-191-A
Bolts and Anchors-Pipe and Equipment Flange Bolts
SUB-00018-WER-192-A
CS1130
CS827
RPT
CONS
SUB
ARW
B
From main contractor directly
Section 05500-Part 2.13-A-3-d
PD
CONS
SUB
WER
A
March 22, 2014
April 1, 2014
May 1, 2014
April 9, 2014
8
B
Pipe Flanges-Mechanical Fittings Gasket-40 bar
Section 15000-Part 2.2-M-(1-5)
PD
CONS
SUB
WER
A
March 19, 2014
April 1, 2014
May 1, 2014
April 15, 2014
14
C
SUB-00018-WER-193-A
Test Report for Compressive Strength 28 Day at (HCL) For Concrete Mix Design.
Section 03300
TR
CONS
Lab Test
WER
A
From main contractor directly
SUB-00018-WER-193-A
Test Report For Compressive Strength – 28 day at (HCL) for Concrete Mix Design.
Section 03300
TR
CONS
Lab Test
WER
A
From main contractor directly
April 3, 2014
May 3, 2014
April 8, 2014
5
B
April 1, 2014
May 1, 2014
April 14, 2014
13
B
Submitted on April 01, 2014 and Retracted on April 01, 2014-At the same day
SUB-00018-SNW-194-A
Sanur Well Performance Testing Work Plan
Section 02636
AD
CONS
SUB
SNW
A
From main contractor directly
SUB-00018-ARW-195-A
Shop Drawing "Arraba well” Confirmed Profile
Section 01300
SD
CONS
SUB
ARW
A
From main contractor directly
April 2, 2014
May 2, 2014
April 3, 2014
1
C
SUB-00018-ARW-195-B
Shop Drawing "Arraba well” Confirmed Profile
Section 01300
SD
CONS
SUB
ARW
B
From main contractor directly
April 3, 2014
May 3, 2014
April 8, 2014
5
A
SUB-00018-ARW-196-A
Completion Report Arraba Well (VTLS) Existing Pump Reinstallation
Section 01010 A-Part -3-3.1
RPT
CONS
SUB
ARW
A
From main contractor directly
April 2, 2014
May 2, 2014
April 8, 2014
6
B
SUB-00018-ARW-197-A
Finish Ground Level (Arraba Well)
N/A
SD
CONS
SUB
ARW
A
March 30, 2014
April 2, 2014
May 2, 2014
April 7, 2014
5
B
SUB-00018-WER-198-A
Test Report for Compressive Strength – 28 day at Me’mar Plant for Concrete Trial Batch Mix
Section 03300
TR
CONS
Lab Test
WER
A
From main contractor directly
April 3, 2014
May 3, 2014
April 8, 2014
5
C
SUB-00018-WER-199-A
QC Monthly Report -March 2014
Contractor’s Manual, paragraph 4.1construction submittal(3)
PD
CONS
SUB
WER
A
From main contractor directly
April 6, 2014
May 6, 2014
April 8, 2014
2
B
SUB-00018-WER-200-A
Method Statement for Second Trial Mix
Section 03300-Part 1.2-B
AD
CONS
SUB
WER
A
From main contractor directly
April 6, 2014
May 6, 2014
April 8, 2014
2
B
SUB-00018-WER-201-A
QA/QC Submittal Register Monthly Update March, 2014
Contractor’s Manual, 4.1-construction submittals (3)
AD
CONS
SUB
WER
A
From main contractor directly
April 7, 2014
May 7, 2014
April 14, 2014
7
B
SUB-00018-SNW-202-A
Sanur Well Geophysical Logging Work Plan
Section 02623
AD
CONS
SUB
SNW
A
From main contractor directly
April 8, 2014
May 8, 2014
April 9, 2014
1
A
AD
CONS
SUB
SNW
A
From main contractor directly
April 8, 2014
May 8, 2014
April 14, 2014
6
B
Contractor`s Manual-Sec. 4.1/12& Specs. Sec. 01040, 01520, 01550, 01560, 01640 & 01505
AD
CONS
SUB
WER
A
From main contractor directly
April 8, 2014
May 8, 2014
April 14, 2014
6
B
SUB-00018-SNW-203-A
The Safety Plan For Working at Night for Sanur Well Monthly Safety Plan Update-March 2014
SUB-00018-WER-204-A
Contractor's Manual -Sec.4.1/12 & Specs.sec.01040,01520,01550, 01560,01640 and 01505
SUB-00018-WER-205-A
Monthly Risk Management Plan Update -March 2014
Contractor`s Manual-Sec. 4.1/construction submittals #003
AD
CONS
SUB
WER
A
From main contractor directly
April 8, 2014
May 8, 2014
April 14, 2014
6
B
SUB-00018-WER-206-A
Monthly Environmental Plan Update and Mitigation Plan Update- March, 2014
Contractor`s Manual-Sec. 4.1/14 & Specs.1560
AD
CONS
SUB
WER
A
From main contractor directly
April 8, 2014
May 8, 2014
April 14, 2014
6
B
SUB-00018-WER-207-A
Pipe Flanges-Steel Pipe Flanges
Section 15000-Para. 2.2-B, 2.2-C,2.2-D, 2.2F-2&3, 2.2-G-1
PD
CONS
SUB
WER
A
March 18, 2014
April 9, 2014
May 9, 2014
April 15, 2014
6
B
SUB-00018-WER-208-A
Updated CPM Construction Schedule -March 2014
Section 01311
SCH
CONS
SUB
WER
A
From main contractor directly
April 9, 2014
May 9, 2014
April 27, 2014
18
B
SUB-00018-WER-209-A
Upblast Roof Exhaust Fan-Electrical Metering Building Fans
Section 15830-Part 2.1
PD
CONS
SUB
WER
A
March 24, 2014
April 10, 2014
May 10, 2014
April 14, 2014
4
B
SUB-00018-WER-210-A
Pressure Measuring Systems-Diaphragm Seals
Section 17108-Para. 2.3-(A,B,C,D,E,F,G,H)
PD
CONS
SUB
WER
A
March 30, 2014
April 10, 2014
May 10, 2014
April 17, 2014
7
B
TO‐18‐WER‐Submittals Log‐April 2014‐Monthly Progress Report
Attachment No.22.6 Page 1 of 2
Submittal Number
Submittal Description
Specification Number
Submittal Category
Submittal Classification
Submittal Type
Project Identifier
Schedule Activity ID
BOQ Item No.
Rev.
Contractual Submission Date
Actual Submission Date from Subcontractor
Actual Submission Date
Submission Delay
Response Needed by (Max. 30 days)
Date Returned to IRD
Total Engineer Response Time
Submittal Disposition (Grade)
SUB-00018-WER-211-A
Debris Stop Gate and Mud Gate
Drawing No: PS2S-1 -Rev. General Design Drawings
PD
CONS
SUB
WER
A
March 31, 2014
April 10, 2014
May 10, 2014
April 15, 2014
5
B
SUB-00018-WER-212-A
Ball Valve DN: 15, 25 mm, PN: 16, 40 Bar
Section 15204-Para. 2.2-(A,B,C,D,E)
PD
CONS
SUB
WER
A
April 1, 2014
April 10, 2014
May 10, 2014
April 16, 2014
6
B
SUB-00018-WER-213-A
Control Valve-Pressure Reducing Valve DN: 50mm
Section15217-Para. 2.1-C (3,5)
PD
CONS
SUB
WER
A
April 1, 2014
April 13, 2014
May 13, 2014
April 17, 2014
4
C
SUB-00018-WER-214-A
Control Valve-Pressure Sustaining Valve DN: 50mm
Section 15217-Para. 2.1-C (2)
PD
CONS
SUB
WER
A
April 1, 2014
April 13, 2014
May 13, 2014
April 15, 2014
2
C
SUB-00018-WER-214-B
Control Valve-Pressure Sustaining Valve DN: 50mm
Section 15217-Part 2-2.1-C (2)
PD
CONS
Lab Test
WER
B
April 19, 2014
April 27, 2014
May 27, 2014
SUB-00018-WER-215-A
Upblast Roof Exhaust Fans-Chlorination Room Fans
Section 15830-Para. 2.1 (A,B,C,D,E)
PD
CONS
SUB
WER
A
April 1, 2014
April 13, 2014
May 13, 2014
April 14, 2014
1
D
SUB-00018-WER-216-A
Treatment of Surface Defects-Rendroc FC
Section 03300-Para. 3.12-C (1,2)
AD
CONS
SUB
WER
A
April 3, 2014
April 13, 2014
May 13, 2014
April 17, 2014
4
B
SUB-00018-ARW-217-A
Electrical Builder Drawing For Arraba Balancing Tank
Drawing No: PS2E-1-Rev. Program Standard Design
SD
CONS
SUB
ARW
A
April 3, 2014
April 13, 2014
May 13, 2014
April 14, 2014
1
B
SUB-00018-WER-218-A
Process Control and Instrumentation Systems Supplier & Electrical Calculation & Protection Designer
Section 17100-Para. 1.1-E-3(a-c)
AD
CONS
SUB
WER
A
April 13, 2014
April 13, 2014
May 13, 2014
SUB-00018-ARW-219-A
Alternative Accesses Passage For Field Offices Arraba Well
Drawing No: PS2E-1-Rev. Program Standard Design
SD
CONS
SUB
ARW
A
From main contractor directly
April 14, 2014
May 14, 2014
April 20, 2014
6
B
SUB-00018-WER-220-A
Treatment of Surface Defects-Renderoc HSXtra
Section 03300-Para. 3.12-D
AD
CONS
SUB
WER
A
April 10, 2014
April 15, 2014
May 15, 2014
April 17, 2014
2
B
SUB-00018-WER-221-A
Curing Materials-Polyethylene Sheets
Section 03300-Para. 2.2-D
SMP
CONS
SUB
WER
A
April 12, 2014
SUB-00018-WER-222-A
Test Report For Natural Sand-Second Trail Mix
Section 03300
TR
CONS
Lab Test
WER
A
From main contractor directly
April 17, 2014
May 17, 2014
April 28, 2014
11
B
SUB-00018-WER-223-A
Test Report for Reinforcement Steel Bars Φ 22
Section 03200
TR
CONS
Lab Test
WER
A
From main contractor directly
April 17, 2014
May 17, 2014
April 28, 2014
11
B
SUB-00018-WER-224-A
Fill and Backfill Material Test Report-Base Course
Section 02200-Part 2.1 C-7
TR
CONS
Lab Test
WER
A
From main contractor directly
April 17, 2014
May 17, 2014
April 23, 2014
6
B
SUB-00018-ARW-225-A
Test Report - Soil Confirmation For Structural Foundations in Section 02200 Arraba Project.
TR
CONS
Lab Test
ARW
A
From main contractor directly
April 20, 2014
May 20, 2014
April 30, 2014
10
B
SUB-00018-WER-226-A
Test Report for Backfill Material-Sourced from Site Excavations.
Section 02200-Part 2.1
TR
CONS
Lab Test
WER
A
From main contractor directly
April 20, 2014
May 20, 2014
April 28, 2014
8
B
SUB-00018-SNW-227-A
Revised Work Plan for Sanur Well Development
Sections 02623, 02624 and 02636
AD
CONS
SUB
SNW
A
From main contractor directly
April 20, 2014
May 20, 2014
April 30, 2014
10
B
SUB-00018-WER-228-A
Miscellaneous Materials-Vapor Retarder (vapor barrier)
Section 03300-Para. 2.4-C
SMP
CONS
SUB
WER
A
April 20, 2014
April 21, 2014
May 21, 2014
April 30, 2014
9
B
SUB-00018-ARW-229-A
Method Statement for Construction of Arraba Retaining Wall
Section 01300-Part 1.8 B
AD
CONS
SUB
ARW
A
From main contractor directly
April 21, 2014
May 21, 2014
April 30, 2014
9
B
SUB-00018-WER-230-A
Form and Falsework Materials-Plastic Chamfer Edge Sample.
SMP
CONS
SUB
WER
A
April 10, 2014
April 23, 2014
May 23, 2014
April 30, 2014
7
A
SUB-00018-WER-231-A
Fill and Backfill Material Requirement-Samples
Section 02200-Part 2-(2.1-C)
SMP
CONS
SUB
WER
A
April 24, 2014
SUB-00018-ARW-232-A
Test Report - Soil Bearing Capacity Confirmation For Retaining Wall Footing at Arraba Well Project
Section 02200
TR
CONS
Lab Test
ARW
A
From main contractor directly
April 27, 2014
May 27, 2014
SUB-00018-WER-233-A
Steel Pipes and Fittings
Section 02570-Para. 1.1-C(1,2), 2.4-A(1,2) and 2.6-C
PD
CONS
SUB
WER
A
April 8, 2014
April 28, 2014
May 28, 2014
SUB-00018-WER-234-A
Test Report for Concrete Compressive Strength 7-Days at Ya’bad Village for Second Trial Batch Purpose by HCL
Section 03300-Part 1-1.4-C
TR
CONS
Lab Test
WER
A
From main contractor directly
April 28, 2014
May 28, 2014
SUB-00018-WER-235-A
Reinforcement Steel Spacer for Vertical Elements-Sample
Section 03200-Part 2-2.2-B-1
SMP
CONS
SUB
WER
A
April 22, 2014
April 28, 2014
SUB-00018-ARW-236-A
Test Report on Reinforcement Steel Bars (Ø16,Ø22)-Arraba Site
Section 03200-Part 2-2.2-A-1
TR
CONS
Lab Test
ARW
A
From main contractor directly
SUB-00018-WER-237-A
Protective Coating-Dekguard FC
Section 09800-Part 2-2.2-O
PD
CONS
SUB
WER
A
SUB-00018-WER-238-A
Booster-Pump Control Valve
Section 15217-Part 2-2.1-C
PD
CONS
SUB
WER
SUB-00018-ARW-239-A
Degree of Compaction Test Report Under Retaining Wall Foundation Arraba Well
Section 02200-Part 3-3.10-B
TR
CONS
Lab Test
SUB-00018-SNW-240-A
Sanur Well – Fishing Work Plan
Section 01300-Part 1-1.8-B
AD
CONS
SUB-00018-SNW-241-A
Activity Report- Sanur Well Video Logging (2) After Jetting and Airlifting
Section 02623
RPT
SUB-00018-SNW-242-A
Activity Report- Sanur Well Video Logging (1) After Pulling Out Existing VLST Pump
Section 02623
RPT
TO‐18‐WER‐Submittals Log‐April 2014‐Monthly Progress Report
Remarks
Submitted on April 15, 2014 and Retracted on April 21, 2014.
Submitted on April 24, 2014 and Retracted on April 30, 2014 April 30, 2014
3
B
May 28, 2014
April 30, 2014
2
B
April 29, 2014
May 29, 2014
April 30, 2014
1
A
April 23, 2014
April 29, 2014
May 29, 2014
April 30, 2014
1
C
A
April 26, 2014
April 29, 2014
May 29, 2014
ARW
A
From main contractor directly
April 29, 2014
May 29, 2014
April 30, 2014
1
A
SUB
SNW
A
From main contractor directly
April 29, 2014
May 29, 2014
CONS
SUB
SNW
A
From main contractor directly
April 30, 2014
May 30, 2014
CONS
SUB
SNW
A
From main contractor directly
April 30, 2014
May 30, 2014
Attachment No.22.6 Page 2 of 2
TO-13-00018 (WER)- April. 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
SNW 22.7 Requests for Information Log
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government.
Task Order: Projects:
Task Order: 00018-WER Project 1-ARW Arraba Well Pump Station Rehabilitation & Infrastructure Improvements Project 2-SNW Sanur Well Pump Station Rehabilitation & Infrastructure Improvements Project 3-SDW Saadeh Well Rehabilitation
NTP:
October 23, 2013
NOA:
September 25, 2013
Request for Information Log RFI No.
Subject of RFI
BOQ item no.
Specification no.
Drawing no.
Date Submitted to Engineer
Response Date from Engineer
No. of Days for Engineer Response
Status
Engineer Response
Potential Change Order
Response to Requested Information: 1. Pressure rating for the Booster Control Valve (BCV) is PN 40 and not PN25. Refer to the valve and equipment schedule in the project design drawings 3M-1 and 4i\I-1 for valves pressure ratings. RFI-18-WER-C-E-027-A
Booster Control Valves
Section 15217-Par.8
April 9, 2014
April 13, 2014
4
Reviewed
2. No deviations were made on the specified pressure rating. Specified hydraulic calculations from the manufacturer are for cavitation, sizing and performance verification and are irrelevant to pressure rating determination. 3. BCV selection shall be based on the specified pressure rating, and section 15217/ C/8 of project documents for the components, functionality and features; regardless of manufacturer and/ or model number indicated.
RFI-18-WER-C-E-028-A
Confirmation on pipes material to be used at balance tanks outlets in Arraba and Sanur pumping stations.
RFI-18-WER-C-E-029-A
Using West Bank Water Department (WBWD) video logging camera for bore hole TV survey in Sanur Well.
TO-18-WER-RFI Log-April 2014-Monthly Progress Report
Conformed Drawing-3M-3, 4M-3 & G-7
April 28, 2014
Pending
April 28, 2014
Pending
Attachment No.22.7 Page 1 of 1
TO-13-00018 (WER)- April. 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
SNW 22.8 Variation Order Request and Variation Order Log
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government.
Task Order: 00018-WER Project 1-ARW Arraba Well Pump Station Rehabilitation & Infrastructure Improvements Project 2-SNW Sanur Well Pump Station Rehabilitation & Infrastructure Improvements
Task Order: Projects:
Original Task Order Amount VO
Date
Status
Subject
USAID Approval Date
BOQ
Day Work
NTP:
October 23, 2013
NOA:
September 25, 2013
Previous Task Order Amount
Total
BOQ
Day Work
Revised Task Order Amount
Total
BOQ
Day Work
Total
Variation Order Change to Day Work
Project Name
Original Previous Project ID Contract VO Time Duration Extension
Revised Original VO Time Completion Completion Extension Date Date
There were no variation orders received during the current reporting Period for Arraba and Sanur Well Pump Stations.
TO-18-WER-VO Log-April 2014-Monthly Progress Report
Attachment No.22.8 Page 1 of 2
Task Order: Projects:
NTP: October 23, 2013 NOA: September 25, 2013
Task Order: 00018-WER Project 1-ARW Arraba Well Pump Station Rehabilitation & Infrastructure Improvements Project 2-SNW Sanur Well Pump Station Rehabilitation & Infrastructure Improvements
VOR Log Reference
VOR no.
Date
Revision Date
Time Modification
Modification Cost ($)
Shop Drawings/ Submittal/ Specifications
BOQ Item no.
VO no.
Subject
Status
RFI/ Other
There were no variation order requests issued during the current reporting period for Arraba and Sanur Well Pump Stations.
TO-18-WER-VOR Log-April 2014-Monthly Progress Report
Attachment No.22.8 Page 2 of 2
TO-13-00018 (WER)- April. 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
SNW 22.9 Employment Generated Data
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government.
USAID WEST BANK/ GAZA INFRASTRUCTURE NEEDS PROGRAM INPII CONTRACT NO. AID-294-I-00-12-00003 TASK ORDER NO. AID-294-TO-13-00018 Wells Rehabilitation Project-WER
TEMPORARY JOB DAYS REPORT
4
4
12
8
4
4
Total Other
4
Total Unskilled
April 3, 2013
Total Skilled
4
Total Engineers
4
Total Management
8
7.25
2
6
2
3
2
2
0
5.25
2
3
2
0.5
0
5.25
0
0
0
0
3
Rig Supervisor
12
2
Geologist
4
3
16
16
8
8
8
8
16
24
8
8
4
24
8
8
Welders
4
10
Surveyor
4
16
Janitor
April 2, 2013
32
Janitor (F)
4
Guard
4
Man-days*
Other
Unskilled Labor
8
Flagman
Office Engineer
12
Equipment Operator
Civil Engineer (F)
4
Forman
Decument Control Engineer(F)
4
Unskilled labor
Skilled Labor
Project Manager #1, #2, etc ..
4
Superintendent
Safety & Envi. Manager
April 1, 2013
DATE
Skilled labor
Site Engineer
Quality Control Manager
Engineers
Task Order Manager
Management
Site Staff Job Days ** Worker/Classification (Hours)
Surveyor Assistant
Task Order Name: Wells Rehabilitation Project-WER Sub-project or Activity Name: Project 2- Sanur Pump Station CONTRACTOR: IRD SUBCONTRACTOR: Al Abbasi Company
24
April 4, 2013 April 5, 2013
4
4
4
12
8
4
4
24
8
8
3
2
0
0
5
April 6, 2013
4
4
4
12
8
4
4
24
8
8
3
2
0
0
5
April 7, 2013
4
4
4
12
8
4
4
24
8
8
3
2
0
0
5
April 8, 2013
4
4
4
12
8
4
4
24
8
8
3
2
0
0
5
April 9, 2013
4
4
4
12
8
4
4
24
8
8
3
2
0
0
5
April 10, 2013
4
4
4
12
8
4
4
24
8
8
3
2
0
0
5
0
0
0
0
3
24
April 11, 2013 April 12, 2013
4
4
4
12
8
4
4
24
8
8
3
2
0
0
5
April 13, 2013
4
4
4
12
8
4
4
24
8
8
3
2
0
0
5
April 14, 2013
4
4
4
12
8
4
4
8
8
8
24
8
8
3
2
2
1
5
April 15, 2013
4
4
4
12
8
4
4
40
16
32
24
8
8
3
2
7
4
6
April 16, 2013
4
4
4
12
8
4
4
8
16
24
8
8
3
2
1
2
5
April 17, 2013
4
4
4
12
8
4
4
24
8
8
3
2
0
0
5
0
0
0
0
6
24
April 18, 2013 April 19, 2013
4
4
4
12
8
4
4
April 20, 2013
4
4
4
12
8
4
4
12
April 21, 2013
4
4
4
12
8
4
4
April 22, 2013
4
4
4
12
8
4
April 23, 2013
4
4
4
12
8
April 24, 2013
4
4
4
12
8
8
8
82
12
12
48
24
8
8
12
12
3
2
13.25
6
8
12
96
24
24
216
24
8
8
24
24
3
3.5
19.5
27
11
12
12
96
24
24
216
24
8
8
24
24
3
3.5
19.5
27
11
4
12
12
96
24
24
144
24
8
8
24
24
3
3.5
19.5
18
11
4
4
12
12
82
24
24
168
24
8
8
24
24
3
3.5
17.75
21
11
4
4
12
12
82
24
24
48
24
8
8
24
24
3
3.5
17.75
6
11
12
12
82
24
24
48
24
8
8
24
24
1
1.5
17.75
6
11
8
April 25, 2013
8
8
April 26, 2013
4
4
4
12
8
4
4
12
24
48
24
24
96
24
8
8
24
24
3
3.5
15
12
11
April 27, 2013
4
4
4
12
8
4
4
12
24
48
24
24
96
24
8
8
24
24
3
3.5
15
12
11
April 28, 2013
4
4
4
12
8
4
4
12
12
48
24
24
96
24
8
8
12
24
3
3.5
13.5
12
9.5
April 29, 2013
4
4
4
12
8
4
4
8
1
8
2
24
8
8
1
3
3
1.125
0.25
5.125
April 30, 2013
4
4
4
12
8
4
4
12
12
24
12
1
48
24
8
8
12
12
3
3.5
6.125
6
8
Total of Month
104
104
104
320
208
104
104
128
144
873
308
239
1298
712
216
224
249
248
79
68
195.5 162.25 208.13
INP II Geo-MIS-TO-18-WER-April 2014.xlsx April 2014-Data Sheet-P2-SNW
0
8
8
0
Att. 22.9-Employment Generated Data
USAID WEST BANK/ GAZA INFRASTRUCTURE NEEDS PROGRAM INPII CONTRACT NO. AID-294-I-00-12-00003 TASK ORDER NO. AID-294-TO-13-00018 Wells Rehabilitation Project-WER
Temproray Job Days Summary Report Task Order Name:
Wells Rehabilitation Project-WER
PERIOD FROM: Oct-23-2013 (NTP)
Sub-project or Activity Name:
Project 2-SNW Sanur Well Pump Station
PERIOD TO:
CONTRACTOR:
IRD
Site Staff Job Days**
Date Month
Year
October November December January February March April May June July August September Total of FY 2014 October November December January February March April May June July August September
2013 2013 2013 2014 2014 2014 2014 2014 2014 2014 2014 2014
Management
0 36 45 65 60 75 79
Engineers
Skilled Labor
0 0 14 39 36 49 68
2014 2014 2014 2015 2015 2015 2015 2015 2015 2015 2015 2015
Total of FY 2015
INP II Geo-MIS-TO-18-WER-April 2014.xlsx P2-SNW Summary Sheet
0 4 9 3 0 3 196
Unskilled Labor
0 7 3 2 0 6 162
No of Full Time Equivalent (FTE) Jobs in the Month*
Total Job Days
Other
0 3 24 93 93 111 208
0 50 95 202 189 243 713 0 0 0 0 0
0 2 4 8 8 10 30 0 0 0 0 0
1491
62.63655462
0
0
0 0 0 0 0 0 0 0 0 0 0 0
Notes of Comments
0 0 0 0 0 0 0 0 0 0 0 0
Att. 22.9-Employment Generated Data
TO-13-00018 (WER)- April. 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
SNW 22.10 Risk Register Log
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government.
Infrastructure Needs Program INP II Task Ordre No.: TO‐294‐13‐00018 Project: Sanur Well Rehabilitation and improvement
RISK IDENTIFICATION REF
1
CATEGORY
Owner
RISK
RISK CAUSE
As per coordination with WBWD it was scheduled th to take Sanur well out of service on 29 of Mar, 2014, but WBWD postponed turning off the well Postponement of Sanur well St st shut down by the client, which to 31 of Mar,2014. However, on 31 of Mar, 2014, WBWD didn’t shut down the well due to will result in delays to pull out objection from benefited Municipalities. This will the existing well pump. cause delays in pulling out existing vertical lines shaft well pump, hence delays in performed the whole well development process.
RISK ASSESSMENT IMPACT/CONSEQUENCE
Delay in pulling out existing pump. Delay in performing well development activities. Accordingly delay in the whole project.
RAISED BY DATE RAISED PROBLTY. IMPACT
IRD
29th of Mar, 2014
3
3
RISK RESPONSE
MONITORING & CONTROLLING
RISK RATING
COST IMPACT
SCHEDULE IMPACT
RESPONSE STRATEGY
RESPONSE PLAN
RISK OWNER
STATUS
9
yes
yes
Transfer
The client (WBWD) and CMC notified on this issue by writing. WBWD did not come back with a solution.
Owner
Finished
NOTES
Attachment SNW 22.10 Risk Register Log
TO-13-00018 (WER)- April. 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
CONSTRUCTION MONTHLY PROGRESS REPORT-ATTACHMENTS Reporting Period: April 01- April 30, 2014 PROJECT 3-SAADEH WELL REHABILITATION-SDW
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government.
TO-13-00018 (WER)- April. 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
Attachments
SDW 22.1 SDW 22.2 SDW 22.3
Updated Schedule- Roll-up “S” Curve Submittals Log
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government.
TO-13-00018 (WER)- April. 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
SDW 22.1 Updated Schedule- Roll-up
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government.
RFTOP WATER-294-13-00018 WELL REHABILITATION IMPROVEMENTS Activity ID
Activity Name
Total
01-May-14 Original Early Start Duration
Early Finish
Actual Duration
Actual Start
Actual Finish
Total Float
365
01-May-14 26-Jul-15
136
23-Oct-13
0
365
01-May-14 26-Jul-15
136
23-Oct-13
0
501
03-May-14 26-Jul-15
144
23-Oct-13
-92
20-Jul-15 26-Jul-15 03-May-14 01-Jul-15
126 105 57
23-Oct-13 01-Dec-13 24-Oct-13
-92 -86
Mobilization
501 453 24
Submittals
415
03-May-14 26-Jul-15
141
31-Oct-13
45 362 260 260 77 104 83 127 207 152 104 137 111 85 81 315 190 228 295 362 362 141 77 0 292
03-May-14 03-May-14 03-May-14 23-Jun-14 03-May-14 23-Jun-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 08-Jun-14 08-Jun-14 26-Jul-15 01-May-14
25-May-15 21-Jan-15 21-Jan-15 12-Aug-14 01-Jul-14 14-Oct-14 14-Oct-14 21-Jan-15 27-Oct-14 26-Aug-14 27-Oct-14 19-Jul-14 19-Jul-14 08-Jun-14 31-Mar-15 27-Oct-14 19-Feb-15 31-Mar-15 25-May-15 25-May-15 07-Dec-14 17-Sep-14 26-Jul-15 14-Jun-15
115 129 90 84 10 46 0 0 0 90 66 76 56 26 56 106 100 0 59 115 115 0 0 0 0
31-Oct-13 14-Nov-13 06-Jan-14 07-Jan-14 12-Apr-14 07-Jan-14
292 45 254 254 175 253 207 144 185 148 98 180 143 93 288 45 234 234 175 182 172
01-May-14 01-May-14 01-May-14 01-May-14 05-May-14 15-Sep-14 31-Oct-14 15-Sep-14 21-Oct-14 07-Dec-14 21-Oct-14 02-Nov-14 18-Dec-14 02-Nov-14 01-May-14 01-May-14 01-May-14 01-May-14 05-May-14 08-Nov-14 08-Nov-14
14-Jun-15 25-Jun-14 21-Apr-15 21-Apr-15 02-Jan-15 26-May-15 26-May-15 06-Feb-15 08-Jun-15 08-Jun-15 19-Feb-15 14-Jun-15 14-Jun-15 25-Feb-15 08-Jun-15 25-Jun-14 25-Mar-15 25-Mar-15 02-Jan-15 09-May-15 29-Apr-15
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
RFTOP WATER-294-13-00018 WATER-294-13-00 WELL REHABILITATION & IMPROVEMENTS Milestones General Milestones Intermediate Milestones
Pre Construction Submittals Construction Submittals Material Submittals Civil Earth Works Concrete Works Roads Works Miscellaneous Building Works Mechanical Local Manufacturer Abroad Manufacturer Manufacture ( Long Lead Items) Electrical Abroad Manufacturer Manufacture ( Long Lead Items) Local Manufacturer Shop Drawings Civil Mechanical Electrical Methods Statement & Wo Work Plans Civil Mechanical Electrical Post Construction Submittals
Procurement Mechanical, Electrical Equipm Equipments&Instrumentation,...etc- for Arrabeh Well Donation Number Process Material Order & Manufact Manufacture Mechanical Equipment Electrical Equipment Material Shipment Mechanical Equipment Electrical Equipment Ashdod Port/Bridge Clearance Clear Mechanical Equipment Electrical Equipment Transport to Site (Ashdod Port to Site) Mechanical Equipment Electrical Equipment Mechanical, Electrical Equipm Equipments&Instrumentation,...etc for Sanur Well Donation Number Process Material Order & Manufact Manufacture Mechanical Equipment Electrical Equipment Material Shipment Mechanical Equipment
( New Bar ) Remaining Work Milestone
20-Feb-14 14-Nov-13 14-Nov-13
Q
Q
Q
Q
Q
Q
Q
Q
N D J F M A M J J A S O N D J F M A M J J A S O N
08-Jan-14 0 31-Mar-14 53 155 50 94 179 131 129 48 120 168 -48 300 23 330 0 121 34 -7 -42 -42 80 149 0 -53 -53 20 -53 -62 24 -75 -86 34 -60 -69 27 -60 -69 27 -54 20 -44 -44 10 -72 -62
Date Revision Checked Approved 23-Apr-14 Sr.Planning Eng.M. AbuSha... CM/Deputy Prog.-Iv... Naim Mani-Prog Direc...
Summary
Actual Work Critical Remaining Work
06-Jan-14 10-Feb-14 06-Jan-14 06-Feb-14 13-Mar-14 06-Feb-14 17-Dec-13 17-Dec-13
Q
Roll Up Schedule - April, 2014
Activity ID
Activity Name Electrical Equipment Ashdod Port/Bridge Clearance Clear Mechanical Equipment Electrical Equipment Transport to Site (Ashdod Port to Site) Mechanical Equipment Electrical Equipment Steel Pipes,Fittings&Valves Material Order & Manufact Manufacture All Needed Pipes,Steel Pipes & Fittings Valves Material Delivary All Needed Pipes,Steel Pipes & Fittings Valves
Execution Phase Project 1 Arraba Well Pump S Station Rehabilitation & Infrastructure Improvements Mobilization for P1 P1 - Arraba Well Pump Station Sta Rehabilitation Design Review After Well Development Results Delays Due to Geophys Geophysical Logging Final Acceptance P1 - Arraba Well Pump Station Sta Infrastructure Improvement Demolishing,Site Development,Apply Devel Safety Measurments&Site Preparation Construction of New Pump P Station Retaining Walls Retaining Wall Group Gr #1 Civil & Structural Structur Works Retaining Wall Group Gr #2 Civil & Structural Structur Works Retaining Wall Group Gr #3 Civil & Structural Structur Works Boundary Wall Group Gr #4 Civil & Structural Structur Works Retaining Wall Group Gr #5 Civil & Structural Structur Works Retaining Wall Group Gr #6 Civil & Structural Structur Works Balance Tank 1000 m3 m Civil & Structural Works Finishing Works Metal Fabricate Fabricated Works Mechanical Works Electrical & Instrumentation Instru Works Test Water Tightness Tightn For Reservoir Booster Pump System Syste Civil & Structural Works Steel Structure & Metal Works Mechanical Works Electrical & Instrumentation Instru Works Coatings & Finish Finishing Works Septic & Seepage Tank Ta Civil & Structural Works Plumbing Works Finishing Works Electrical & Control B Building Civil & Structural Works Finishing Works Mechanical Works Electrical & Instrumentation Instru Works HVAC-Plumping
( New Bar )
Original Early Start Duration
131 132 120 92 128 111 88 82 72 60 81 32 12 12 365 361 24 63 120 1 383 43 350 45 35 35 37 37 37 37 41 41 36 36 35 35 299 247 90 5 83 220 14 319 171 45 261 157 14 93 93 44 7 209 81 22 37 195 10
29-Dec-14 14-Dec-14 14-Dec-14 02-Feb-15 30-Dec-14 30-Dec-14 19-Feb-15 11-Oct-14 11-Oct-14 11-Oct-14 12-Oct-14 20-Dec-14 20-Dec-14 20-Jan-15 01-May-14 01-May-14
01-May-14 01-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 03-May-14 14-May-14 14-May-14 19-May-14 19-May-14 03-May-14 03-May-14 11-May-14 11-May-14 19-May-14 19-May-14 03-May-14 03-May-14 18-Dec-14 06-Apr-15 04-Jan-15 23-Jul-14 27-Apr-15 08-Jun-14 08-Jun-14 06-Jan-15 26-Aug-14 21-Dec-14 05-Mar-15 24-Jun-14 24-Jun-14 01-Sep-14 15-Oct-14 27-Oct-14 27-Oct-14 07-Feb-15 07-Feb-15 12-Nov-14 17-Jun-15
Early Finish
09-May-15 26-May-15 12-May-15 26-May-15 08-Jun-15 18-May-15 08-Jun-15 04-Feb-15 20-Jan-15 20-Dec-14 20-Jan-15 04-Feb-15 04-Jan-15 04-Feb-15 26-Jul-15 20-Jul-15
29-Aug-14 01-May-14 11-Jul-15 13-May-14 11-Jul-15 23-Jun-14 11-Jun-14 11-Jun-14 14-Jun-14 14-Jun-14 16-Jun-14 16-Jun-14 18-Jun-14 18-Jun-14 21-Jun-14 21-Jun-14 23-Jun-14 23-Jun-14 13-May-15 14-Mar-15 12-Apr-15 12-Apr-15 19-Apr-15 27-Apr-15 13-May-15 11-Jul-15 14-Jan-15 08-Mar-15 11-Jul-15 01-Jul-15 22-Mar-15 27-Oct-14 27-Oct-14 27-Oct-14 22-Oct-14 07-Jul-15 07-Feb-15 05-Mar-15 23-Mar-15 07-Jul-15 29-Jun-15
Remaining Work Milestone
0 0 0 0 0 0 0 0 0 0 0 0 0 0 135 135 57 86 48 48 96 96 17 17 1 1 9 9 9 9 9 9 9 9 9 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Actual Start
24-Oct-13 24-Oct-13 24-Oct-13 25-Dec-13 14-Mar-14 14-Mar-14 30-Dec-13 30-Dec-13 10-Apr-14 10-Apr-14 10-Apr-14 10-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14 20-Apr-14
Actual Finish
Total Float
Q
Q
Q
Q
Q
Q
Q
Q
Q
N D J F M A M J J A S O N D J F M A M J J A S O N
-75 -61 -49 -61 -61 -49 -61 13 13 25 14 13 35 14 -65 -61 08-Jan-14 28-Mar-14 -85 -85 -71 -42 -71 29 29 29 29 29 29 29 29 29 29 29 29 29 -32 -42 -42 -42 -42 -32 -32 -71 5 5 -71 -74 3 130 130 120 110 -79 2 2 2 -79 -72
Date Revision Checked Approved 23-Apr-14 Sr.Planning Eng.M. AbuSha... CM/Deputy Prog.-Iv... Naim Mani-Prog Direc...
Summary
Actual Work Critical Remaining Work
Actual Duration
Roll Up Schedule - April, 2014
Activity ID
Activity Name Chlorination & Stora Storage Building Civil & Structural Works Finishing Works Mechanical Works Electrical & Instrumentation Instru Works HVAC-Plumping Living Quarters Buil Building Civil & Structural Works Finishing Works Mechanical Works Electrical & Instrumentation Instru Works HVAC-Plumping Electrical Metering B Building Civil & Structural Works Finishing Works Electrical & Instrumentation Instru Works HVAC-Plumping Pads & Slabs Civil & Structural Works Electrical & Instrumentation Instru Works Mechanical Works Well Systems Wellhead and Pad (Structural) Mechanical Electrical & Instrumentation Instru Works Yard Works & Site Electrical El Power External & Finishing Finishi Works Mechanical Works Electrical & Instrumentation Instru Works Flow Control Valve for Mirka Existing Balance Tank & Arraba Existing RSV (O&M),Inspection,Commissioning,Start Up & Training for P1 (O&M),Inspection,Commi Initial Operation & Manufacturer Man Technical Manual Submittals (O&M) Approval - Final Operat Operation & Manufacturer Technical Manual Submittals (O&M) Certificate of Proper Installation Ins for Installed Equipments&Installation (Pre Commissioning) Training Phase Comissioning & Start Up U Phase for All System Demobilization,Close Out&Handing Out Over for P1 Project 2 Sanur Well Pump S Stations Rehabilitation & Infrastructure Improvements Mobilization for P2 P2 - Sanur Well Pump Station Stat Rehabilitation Delay of the Pump Switching Swit Off Delay due to Fishing-E Fishing-Extraction of Fallen Strainer from Sanur Well Design Review After Well Development Results P2: Sanur Well Pump Station Stat Infrastructure Improvement Demolishing,Site Development,Apply Devel Safety Measurments&Site Preparation Construction of New Pump P Station Balance Tank 1000 m3 m Civil & Structural Works Finishing Works Metal Fabricate Fabricated Works Mechanical Works Electrical & Instrumentation Instru Works Test Water Tightness Tightn For Reservoir Booster Pump System Syste Civil & Structural Works Steel Structure & Metal Works Mechanical Works Electrical & Instrumentation Instru Works Coatings & Finish Finishing Works
( New Bar )
Original Early Start Duration
219 67 83 188 212 5 308 67 127 142 296 136 336 75 130 327 5 111 43 88 68 215 47 15 5 139 67 24 139 20 316 218 208 6 11 5 5 365 24 33 1 4 120 326 13 316 282 230 55 5 76 203 14 219 38 40 177 78 14
26-Aug-14 26-Aug-14 18-Nov-14 06-Sep-14 03-Sep-14 28-Apr-15 24-May-14 24-May-14 21-Aug-14 06-Aug-14 07-Jun-14 08-Sep-14 03-May-14 03-May-14 10-Aug-14 07-May-14 20-Jun-15 30-Nov-14 30-Nov-14 18-Dec-14 25-Jan-15 14-Oct-14 14-Oct-14 14-Jun-15 14-Jun-15 14-Jan-15 14-Jan-15 25-Jan-15 14-Jan-15 25-Jan-15 15-Jun-14 15-Jun-14 07-Aug-14 01-Jul-15 01-Jul-15 08-Jul-15 14-Jul-15 01-May-14
Early Finish
24-May-15 18-Nov-14 04-Mar-15 28-Apr-15 24-May-15 04-May-15 14-Jun-15 21-Aug-14 28-Jan-15 01-Feb-15 14-Jun-15 01-Mar-15 25-Jun-15 10-Aug-14 19-Jan-15 20-Jun-15 25-Jun-15 18-Apr-15 25-Jan-15 09-Apr-15 18-Apr-15 01-Jul-15 08-Dec-14 01-Jul-15 20-Jun-15 01-Jul-15 08-Apr-15 25-Feb-15 01-Jul-15 21-Feb-15 14-Jul-15 23-Mar-15 22-Apr-15 08-Jul-15 14-Jul-15 14-Jul-15 20-Jul-15 26-Jul-15
01-May-14 20-May-14 01-May-14 18-May-14 03-May-14 03-May-14 14-May-14 14-May-14 14-May-14 26-Jan-15 29-Mar-15 04-Jan-15 10-Aug-14 19-Apr-15 08-Jun-14 08-Jun-14 03-Aug-14 03-Aug-14 01-Jul-14 01-Mar-15
06-May-14 15-Sep-14 13-Jun-15 17-May-14 13-Jun-15 05-May-15 05-Mar-15 04-Apr-15 04-Apr-15 11-Apr-15 19-Apr-15 05-May-15 17-Mar-15 03-Aug-14 18-Sep-14 12-Mar-15 18-Oct-14 17-Mar-15
Remaining Work Milestone
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 135 57 23 18 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Actual Start
24-Oct-13 24-Oct-13 29-Mar-14 01-Apr-14 24-Apr-14
Actual Finish
Total Float
Q
Q
Q
Q
Q
Q
Q
Q
Q
N D J F M A M J J A S O N D J F M A M J J A S O N
-41 80 18 -24 -41 -24 -59 117 48 48 -59 31 -69 171 58 -69 -69 -10 43 -3 -10 -74 89 -74 -64 -67 -2 41 -74 18 -68 -14 -14 -74 -68 -74 -74 -65 08-Jan-14 -35 19-Apr-14 -50 -71 -55 -18 -55 -25 -25 -18 -18 -18 -25 -25 20 102 121 24 121 7
Date Revision Checked Approved 23-Apr-14 Sr.Planning Eng.M. AbuSha... CM/Deputy Prog.-Iv... Naim Mani-Prog Direc...
Summary
Actual Work Critical Remaining Work
Actual Duration
Roll Up Schedule - April, 2014
Activity ID
Activity Name Septic & Seepage Tank Ta Plumbing Works Finishing Works Civil & Structural Works Electrical & Control B Building Civil & Structural Works Finishing Works Mechanical Works Electrical & Instrumentation Instru Works HVAC-Plumping Chlorination & Stora Storage Building Civil & Structural Works Finishing Works Mechanical Works Electrical & Instrumentation Instru Works HVAC-Plumping Living Quarters Buil Building Civil & Structural Works Finishing Works Mechanical Works Electrical & Instrumentation Instru Works HVAC-Plumping Electrical Metering B Building Civil & Structural Works Finishing Works Electrical & Instrumentation Instru Works HVAC-Plumping Pads & Slabs Civil & Structural Works Electrical & Instrumentation Instru Works Mechanical Works Finishing Works Well Systems Wellhead and Pad (Structural) Mechanical Electrical & Instrumentation Instru Works Yard Works,Widening&Upgrading Works,Widening of Existing Main Road Entrance & Site Electrical Power External & Finishing Finishi Works Electrical & Instrumentation Instru Works Mechanical Works Flow Control Valve for Jaba Existing Balance Tank&Kafr Rai Existing PS Balance Tank (O&M),Inspection,Commissioning,Start Up & Training (O&M),Inspection,Commi Initial Operation & Manufacturer Man Technical Manual Submittals (O&M) Approval - Final Operat Operation & Manufacturer Technical Manual Submittals (O&M) Certificate of Proper Installation Ins for Installed Equipments&Installation (Pre Commissioning) Training Phase Comissioning & Start Up U Phase for All System Demobilization,Close Out&Handing Out Over Project 3 Saadeh Well Pump Station Rehabilitation P3 - Saadeh Well Pump Station St Rehabilitation Mobilization for P3 Execution Demobilization,Close O Out&Handing Over for P3
( New Bar )
Original Early Start Duration
78 28 7 78 189 77 26 37 181 10 220 73 21 90 213 5 138 70 61 125 66 53 126 76 16 117 5 97 39 70 58 2 183 47 17 5 74 73 74 24 20 288 196 184 6 11 5 5 25 25 24 33 7
26-Jun-14 01-Sep-14 21-Sep-14 26-Jun-14 27-Oct-14 27-Oct-14 01-Feb-15 07-Feb-15 05-Nov-14 12-May-15 25-Aug-14 25-Aug-14 24-Nov-14 04-Sep-14 02-Sep-14 06-Jan-15 17-Aug-14 17-Aug-14 12-Nov-14 26-Aug-14 31-Aug-14 30-Nov-14 26-Oct-14 26-Oct-14 28-Jan-15 30-Oct-14 24-Mar-15 13-Dec-14 13-Dec-14 04-Jan-15 03-Feb-15 04-Apr-15 27-Oct-14 27-Oct-14 18-May-15 18-May-15 25-Jan-15 25-Jan-15 25-Jan-15 03-Feb-15 03-Feb-15 03-Aug-14 03-Aug-14 16-Sep-14 07-Jul-15 07-Jul-15 14-Jul-15 20-Jul-15
Early Finish
13-Oct-14 09-Oct-14 29-Sep-14 13-Oct-14 13-Jun-15 01-Feb-15 05-Mar-15 23-Mar-15 13-Jun-15 24-May-15 24-May-15 24-Nov-14 18-Dec-14 24-Dec-14 24-May-15 14-Jan-15 08-Feb-15 12-Nov-14 28-Jan-15 01-Feb-15 22-Nov-14 08-Feb-15 30-Mar-15 28-Jan-15 19-Feb-15 24-Mar-15 30-Mar-15 14-Apr-15 03-Feb-15 04-Apr-15 14-Apr-15 06-Apr-15 07-Jun-15 21-Dec-14 07-Jun-15 24-May-15 25-Apr-15 23-Apr-15 25-Apr-15 05-Mar-15 01-Mar-15 20-Jul-15 04-Apr-15 04-May-15 14-Jul-15 20-Jul-15 20-Jul-15 26-Jul-15
Remaining Work Milestone
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 106 106 57 97 0
Actual Start
Actual Finish
Total Float
Q
Q
Q
Q
Q
Q
Q
Q
Q
N D J F M A M J J A S O N D J F M A M J J A S O N
132 135 92 92 -58 -2 2 2 -58 -41 -41 75 75 75 -41 66 48 51 48 48 108 48 6 34 34 6 6 -7 29 -7 -7 -7 -53 78 -53 -41 -16 -15 -16 -16 11 -79 -60 -24 -79 -79 -79 -79 24-Oct-13 24-Oct-13 24-Oct-13 01-Dec-13 11-Mar-14
20-Mar-14 20-Mar-14 09-Jan-14 20-Mar-14 11-Mar-14
Date Revision Checked Approved 23-Apr-14 Sr.Planning Eng.M. AbuSha... CM/Deputy Prog.-Iv... Naim Mani-Prog Direc...
Summary
Actual Work Critical Remaining Work
Actual Duration
Roll Up Schedule - April, 2014
TO-13-00018 (WER)- April. 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
SDW 22.2 “S” Curve
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government.
INTERNATIONAL RELIEF AND DEVELOPMENT, IRD USAID-INFRSTRUCTURE NEEDS PROGRAM (INP)
TASK ORDER NO. AID-294-TO-13-00018 TASK ORDER NO. AID-294-TO-13-00018 PROJECT 1 Arrabeh Well Pump Station - Rehabilitation and Infrastructure Improvements USD $6,516,970.57 23-Oct-13 550 CD 25-Apr-15
Total Contract Value Less Day Work: NTP (Notice to Proceed) Duration of Contract: Completion Date: Data Date:
PROJECT 2 Sanur Well Pump Station - Rehabilitation and Infrastructure Improvements USD $7,011,251.36 23-Oct-13 550 CD 25-Apr-15
Total Contract Value Less Day Work: NTP (Notice to Proceed) Duration of Contract: Completion Date: Data Date:
`
PROJECT 3 Saadeh Well Pump Station - Rehabilitation USD $493,634.98 $376,334.82 23-Oct-13 120 CD 19-Feb-14 11-Mar-14
Total Contract Value Less Day Work: Revised Total Contract Value Less Day Work: NTP (Notice to Proceed) Duration of Contract: Completion Date: Revised Completion Date : Data Date:
TASK ORDER (PROJECT 1, PROJECT 2 & PROJECT 3) USD $14,021,856.91 $700,000.00 $14,721,856.91 $13,904,556.73 $817,300.18 $14,721,856.91
Total Contract Value Less Day Work: Day Work Value: Total Contract Value Including Day Work: Revised Total Contract Value Less Day Work: Day Work Value: Total Contract Value Including Day Work:
PROGRESS S-CURVE & CASH FLOW SCHEDULE Nov.13
Dec.13
Jan.14
Feb.14
Mar.14
Planned Schedule Value Planned Schedule Value (CUM) Actual Schedule Value
Oct.13 $6,268.38 $5,484.83 $2,309.40
$12,536.76 $18,805.14 $8,577.79
$216,982.41 $268,937.64 $75,122.68
$192,873.25 $488,933.69 $149,777.68
$64,974.18 $493,634.98 $96,436.62
$44,110.65
Actual Schedule Value (CUM) % Planned Schedule % Planned Schedule (CUM) % Actual Schedule %Actual Schedule (CUM)
$2,309.40 1.27% 1.27% 0.61% 0.61%
$10,887.19 2.54% 3.81% 2.28% 2.89%
$86,009.87 43.96% 47.77% 19.96% 22.85%
$235,787.55 39.07% 86.84% 39.80% 62.65%
$332,224.17 13.16% 100.00% 25.63% 88.28%
$376,334.82
11.72% 100%
TOTAL $493,634.98 $493,634.98 $376,334.82 $376,334.82 100% 100% 100% 100%
100.00%
100.00%
100%
TO-13-00018-WER, Progress S-Curve SDW
86.84%
90.00%
88.28%
80.00% 70.00%
62.65%
60.00% 47.77%
50.00% 40.00% 30.00%
22.85%
20.00% 10.00% 0.00%
1.27% 0.61%
3.81% 2.89%
Oct.13
Nov.13
Dec.13
Jan.14
Feb.14
% Planned Schedule (CUM)
1.27%
3.81%
47.77%
86.84%
100.00%
%Actual Schedule (CUM)
0.61%
2.89%
22.85%
62.65%
88.28%
Mar.14 100%
Attachment No.22.2 S Curve
TO-13-00018 (WER)- April. 2014, Construction Monthly Progress Report International Relief and Development, Inc. (IRD)
SDW 22.3 Submittals Log
DISCLAIMER: The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government.
Contract No. AID-294-TO-13-00018
Task Order: 00018-WER
SUBMITTAL REGISTER LOG/SCHEDULE
Project 1-ARW Arraba Well Pump Station
NTP:
23-Oct-13
NOA:
25-Sep-13
Project 2-SNW Sanur Well Pump Station Project 3-SDW Saadeh Well Rehabilitation Submittal Categories
Submittal Classification
Identifiers:
Resubmittal Alpha Identifier
Preconstruction
WER Wells Rehabilitation Project
CONS
Construction
ARW
PSTS
Post construction
Submittal Disposition/ Color Coding
First Submittal SUB-18-WER-001-A
PD
PRODUCT DATA
PCS
SD
SHOP DRAWINGS
AD
ADMINISTRATIVE/OTHER
TR
TEST REPORT
SCH
SCHEDULE
E- Review Not Required
RPT
REPORT
Submitted Pending Response
SMP
SAMPLE
CO
COMPLETION & CLOSEOUT
MAT
SUB-00018-SDW-162-C
TO-18-WER-Submittals Log-April 2014-Monthly Progress Report
SDW
First RE-Submittal SUB-18-WER-001-B
B - Make Corrections Noted
Second Resubmittal SUB-18-WER-001-C
C- Amend and Resubmit
: Project 3 Identifier
D- Rejected- Resubmit
MATERIAL
A
Submittal Number
: Project 1 Identifier : Project 2 Identifier SNW
A – No Exceptions Noted
B
Submittal Description
Final Geophysical Logging
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
Specification Number
Submittal Category
Submittal Classification
Submittal Type
Project Identifier
Schedule Activity ID
BOQ Item No.
Rev.
Contractual Submission Date
Actual Submission Date from Subcontractor
Actual Submission Date
Submission Delay
Response Needed by (Max. 30 days)
Date Returned to IRD
Total Engineer Response Time
Submittal Disposition (Grade)
Remarks
CO
CONS
SUB
SDW
From main contractor directly
April 28, 2014
Section 02623
C
May 28, 2014
Attachment No.22.3 Page 1 of 1
For more information, please visit http:// www.usaid.gov/west-bank-and-gaza
USAID WEST BANK/GAZA American Embassy USAID 71 HaYarkon Street Tel Aviv, 63903 Israel
www.usaid.gov/west-bank-and-gaza