SEJONG CORPORATION
2007
COMPANY PROFILE
TABLE OF CONTENTS Introduction
············································
Head & Branch Office
····································
Management Strategy & Spirits Profile
3
···························
4
·················································
5
Organization Chart Manpower Resources Scope of Business Projects in Progress Major Experiences
·········································
6
········································
7
···········································
8
·········································
9
···········································
12
Independent Mini Hydro Power Plant ISO Certificate
2
·························
32
··············································
33
-1-
INTRODUCTION It is our great honor and pleasure to render you the opportunity to understand and evaluate our potential capabilities and qualification through the long and vast projects during the last 16 years since established in 1991. As one of the leading specialized erection contractor for electro-mechanical and instrumentation works having its principal works, such as supply, supervision, erection, test/commissioning and operation& maintenance, we have achieved numerous outstanding performance in the plant business field of electro-mechanical and instrumentation at home and abroad. By virtue of our highly qualified construction ability based on good manner of workmanship and good reputation from our customers, we can provide you with confidence that the project will be completed on time within the budget and the quality parameters originally established for it. We hope that this company profile will meet your requirements and will lead both of us eventually to the opportunities to cooperate. -2-
HEAD & BRANCH OFFICE Sejong’s overseas operational activities are conducted by division of overseas works in head office in close coordination with regional branch offices located in U.A.E , Bangladesh and liaison offices in Libya & Philippine. Our services are committed to productive efficiency coupled with quality assurance, work place safety and environment friendly execution of projects.
Head Office Address : 901-3, Jakjeon-dong, Gyeyang-gu, Incheon-City, Korea Tele : +82-32-555-5577, Fax : +82-32-555-6554 E-Mail :
[email protected]
UAE branch Office Dubai - Sejong Emirates Electro-Mechanical Contracting LLC. Add. : P.O Box 28747 Dubai, U.A.E / Tel : +971-4-390-8540 / Fax : +971-4-390-5841 Abu Dhabi - Al Hasoun Sejong Electro-mechanical Est. Add. : P.O Box 3930 Abu Dhabi, U.A.E / Tel : +971-2-621-4678 / Fax : +971-2-621-6882
Bangladesh Agent (SAHCO International Ltd.) Address : UTC Tower Level-18.8, Panthapath, Dhaka 1213, Bangladesh Tele : +880-2-815-4177 / Fax : +880-2-815-9787 -3-
MANAGEMENT STRATEGY & SPIRITS
MANAGEMENT STRATEGY ■ Individual Excellence ■ First Choice of Customers
SPIRITS
&
■ Cost Saving
■ Innovative Thinking ■ Full Commitment ■ Fair Manner
■ Perfect Performance
-4-
PROFILE ■ Over 290 permanent employees
BUSINESS PORTFOLIO (%)
■ Sales target in excess of $98Million (2007)
TRENDS OF SALES Building & Housing
(US$ Million)
Petrochemical Plant
11 %
18%
Industrial Plant
60 50
15%
Substation & Transmission Line
70
40
15% 41%
30
Power Plant
20 10 0
2001 2002 2003 2004 2005 2006 -5-
ORGANIZATION CHART
Head Office
QA / QC
Division of Domestic Works
Division of Overseas Works
Division of Plant O&M
-6-
Division of Marketing
Division of Management & Finance
MANPOWER RESOURCES Technical Persons 1. Construction Group
Human Resources 228 (63) persons
Administrative Staff 12(6) Instrumentation Electrical 32(43) 84(3)
Mechanical Mechanical 79(7) 95
Professional Engineer
Senior Engineer
Engineer
Supervisor
Total
Mechanical
4
14
12
49
79
Electrical
5
16
15
48
84
Instrumentation
2
6
6
18
32
QA/QC
1
2
6
12
21
Total
12
38
39
127
216
QA / QC QA / QC 21(4) 26
* ( ) Maintenance Group
2. Maintenance Group Professional Engineer
Senior Engineer
Engineer
Technician
Total
Mechanical
1
1
2
3
7
Electrical
1
1
1
3
Instrumentation
3
7
13
20
43
QA/QC
1
1
1
1
4
Total
6
9
17
25
57
-7-
SCOPE OF BUSINESS Specialized knowledge and experience of Sejong’s staffs have led us to the successful operation in the following areas; Power Generation Plant - Erection of Gas Turbine, Steam Turbine, HRSG and Associated piping, BOP piping Test & Pre-commissioning, Operation and maintenance. In Particular, Sejong is ASME “A” certified company for Power Boiler Field Assembly. Electrical Transmission Line and Substation - High voltage electrical construction including transmission and distribution line, substation erection, test & commissioning, underground power and communication cable, communication tower and fiber optics cable installations. Petrochemical and Gas Processing Plant - Mechanical Erection & Associated piping, Field piping, Steel Structure work, Electrical and I&C works including DCS Water Treatment and Pump Stations - Electro-Mechanical Erection works and Associated piping, I&C, Test & Commissioning. Cement Plant - Electrical and I & C work, commissioning and start-up. Commercial building - Electrical & Communication work for Super tower buildings, hotels and hospitals.
-8-
MAJOR WORKS UNDER EXECUTION
AS OF 31 Aug, 2007
1
CLIENT
PROJECT NAME
WORK DESCRIPTION
Location
Value
PERIOD
Hyundai Engineering Jebel Ali Power and Desalination & Construction co.,Ltd. Station ‘L’ Phase-II
Mechanical, Electrical and I&C erection work Support of Test/Comm. for Combined Cycle Power Plant - Subcontractor
U.A.E
USD 18.9 mil
Mar, 06 ~ Nov, 07
KOC / Hyundai Heavy Industries Co.
Crude Oil Export Facilities Project
Election and I&C erection Work Cathodic Protection erection Telecommunication Work
Kuwait
USD 7.9 mil
May, 06 ~ Jun, 08
Doosan Heavy Industries Co.Ltd.
Taweelah A10 Power Plants
Mechanical and Electrical Works, Site Painting works and Insulation works - Subcontractor
U.A.E
USD 11.0 mil
Aug, 07 ~ Mar, 09
Mechanical, Electrical Works and Support of Test/Comm. for Liquid Processing Unit Works - Subcontractor
Qatar
USD 13.8 mil
Sep, 07 ~ May, 10
Electrical and I&C erection and Test/ Comm. for Feed Water Preparation Works - Subcontractor
Qatar
USD 6.0 mil
Jul, 08 ~ May, 10
Pearl GTL Project Hyundai Engineering Liquid Processing Unit (LPU) & Construction co.,Ltd. Works
Hyundai Heavy Industries Co.,Ltd.
Pearl GTL Project Feed Gas Preparation (FGP) Works
-9-
MAJOR WORKS UNDER EXECUTION
AS OF 31 Aug, 2007
1
CLIENT
PROJECT NAME
WORK DESCRIPTION
Location
Value
PERIOD
Doosan Heavy Industries Co.Ltd.
Ras Laffan Desalination Plant
Electrical and I&C erection work and Test/ Comm. for Desalination Project - Subcontractor
Qatar
USD 2.15 mil
Apr, 05 ~ Jun, 08
Siemens
Ras Laffan B Project
BOP piping work for Power Plant – Subcontractor
Qatar
USD 9.0 mil
Jul, 05 ~ Apr, 07
Jabel Ali New Container Hyundai Engineering Terminal Stage 1, Upland & Construction co.,Ltd. Facilities, LCC-2,3 Project
Electrical design, erection and Test/Comm. for Container Terminal Project - Subcontractor
UAE
USD 4.6 mil
Jun, 06 ~ Nov, 07
Doosan Heavy Industries Co.Ltd.
Electrical and I&C erection and Test/ Comm. for Distillation Plant - Subcontractor
Kuwait
USD 7.5 mil
Dec, 04 ~ Jan, 07
Libya
USD 4.7 mil
May, 05 ~ Jun, 07
Sabiya Distillation Plants with Recarbonation System
Hyundai Engineering Zawia Combined Cycle Power & Construction co.,Ltd. Plant
Electrical and I&C erection works and Test/ Comm. for Zawia Combined Cycle Power Plant – Subcontractor
- 10 -
MAJOR WORKS UNDER EXECUTION
AS OF 31 Aug, 2007
1
CLIENT
PROJECT NAME
WORK DESCRIPTION
Location
Value
PERIOD
Libya
USD 1.0 mil
Dec, 05 ~ Feb, 07
Daewoo Engineering Benghazi North Combined & Construction co.,Ltd. Cycle Power Plant
Test & Commissioning work for Combined Cycle Power Plant - Subcontractor
KNER / Hyundai Engineering & Construction co.,Ltd
New Ethane Recovery Plant Project
Electrical Erection Work Cathodic Protection erection
Kuwait
USD 1.6 mil
Apr, 06 ~ Aug, 07
GS E&C
Bu-Gok Combined Cycle Power Plant No.2
Electrical and I&C Erection Work. Support of Test/ Comm. for Combined Cycle Power Plant – Subcontractor
Korea
USD 4.5 mil
Jul, 06 ~ Feb, 08
KHNP
Routine Maintenance for Young-Kwang Nuclear Power Plant No. 3&4, 5&6
Routine Maintenance work for I&C YoungKwang Nuclear Power Plant – Prime Contractor
Korea
USD 13 mil
Nov, 05 ~ Apr, 08
Hyundai Heavy Industries Co.Ltd.
Routine Maintenance for DaeSan Heat Combined Cycle Power Plant
Routine Maintenance work for Mechanical, Electrical and I&C in Dae-San Heat Combined Cycle Power Plant – Prime Contractor
Korea
USD 0.6 mil/year
Contractrenewal
POSCO Engineering & Construction Co.,Ltd
Song-do the# 1st World Apartment Project
All Electrical Installations and Material Supply
Korea
USD 2.2 mil
Aug, 06 ~ Jan, 09
- 11 -
Long Term Biannually
MAJOR EXPERIENCES - Nuclear Power Plants
■ PROJECT NAME : Yeongkwang Nuclear Power Plant(No. 1 ~ 6 units) ■ CLIENT : Korea Electric Power Co., Ltd (KEPCO) ■ LOCATION : Yeongkwang, Korea ■ PERIOD : Feb. 15, 1995 ~ Dec. 31, 2002
■ SCOPE OF WORK : Refer to page 14
- 12 -
MAJOR EXPERIENCES - Nuclear Power Plants
- 13 -
MAJOR EXPERIENCES
Nuclear Power Plant
1
CLIENT
PROJECT NAME
KEPCO / DHIC
Ul-Chin Nuclear Power Plant No. 5&6 (Korea)
KEPCO / HDEC
Young-Kwang Nuclear Power Plant No. 5&6 (Korea)
KEPCO / KHIC
Ul-Chin Nuclear Power Plant No. 3&4 (Korea)
KEPCO / HDEC, DAEWOO
Wol-Sung Nuclear Power Plant No. 2,3&4 (Korea)
KEPCO / HDEC
Young-Kwang Nuclear Power Plant No. 3&4 (Korea)
WORK DESCRIPTION Work description listed below can be applicable to all nuclear power stations since the work activities we had performed in those stations are almost identical to each other even though there are some differences in quantities. 1. Construction Test and Energization for 154KV Switch Yard and related system for starting power from network 2. Construction Test and Energization for 354KV Switch Yard and related system for power exporting to network. (354KV outdoor type GIS, 1000MVA Transformer – 2 Units) 3. Medium Voltage Switch Gear (7.2KV & 4.16KV), MCC TRs etc. Construction Test & Energization 4. All Electrical individual/ combined test for system including motor drive 5. Support of NSSS system check out 6. Field Instrument calibration and loop test for individual system 7. Pre-operational test for individual system and support for integrated test such as Cold/ Hot Hydro test 8. Startup support for power plant electrical and instrumentation system - 14 -
PERIOD
Jun, 01 ~ May, 05
Sep, 98 ~ Dec, 02
Sep, 95 ~ Jun, 99
Aug, 95 ~ Jun, 97
Feb, 92 ~ Dec, 95
MAJOR EXPERIENCES - Combined Cycle Power Plant
■ PROJECT NAME : 1550MW Umm Al Nar Water and Power Project ■ CLIENT : Toshiba Plant System & Service Corp. ■ LOCATION : Umm Al Nar, U.A.E ■ PERIOD : Feb, 04 ~ Jan, 06 ■ SCOPE OF WORK : Erection of Gas Turbine, Steam Turbine, HRSG and Associated Piping, BOP Piping and Support of Test & Commissioning - 15 -
MAJOR EXPERIENCES - Combined Cycle Power Plant
Steam Turbine Generator Capacity : 318MW x 2 Units Manuf’r : Toshiba
Heat Recovery Steam Generator
Gas Turbine Generator
Capacity : 620 Ton/Hour x 5 Units Manuf’r : Doosan Heavy Industries
Capacity : 230MW x 5 Units Manuf’r : GE (Frame 9EA)
- 16 -
MAJOR EXPERIENCES
Power Plant
1
CLIENT
PROJECT NAME
WORK DESCRIPTION
PERIOD
Toshiba Plant System & Service Corp.
Umm Al Nar Independent Power Plant
Mechanical, Electrical and I&C erection work Support of Test/Comm. for 1550MW Combined Cycle Power Plant - Subcontractor
Feb, 04 ~ Jan, 06
SAMHWAN CORPORATION
Sam-Chon-Po Thermal Power Plant Desulfurization Project
Erection and Test/Comm. for Electrical and I&C works for Desulfurization Project In Sam-Chon-Po Termal Power Plant
May, 03 ~Dec, 04
U.A.E Offsets Group / DHIC
Fujairah Water & Power Plant
132KV GIS 14 Bays (Hyundai), Generator (Alstom), Gas Turbine 4 sets (GE), HRSG 4 sets related Electrical and I&C works. All erection work for Electrical and I&C for Power Plant side including Test and Commissioning
Mar, 02 ~ Dec, 03
AES / HDEC
Meghnaghat 450MW Combined Cycle Power Plant (Bangladesh)
All Electrical and I&C Installation work, Test & commissioning
Apr, 01 ~ Dec, 02
KEPCO / HDEC
Tae-An Thermal Power Plant No.5&6 (Korea)
7.2KV SWGR and MCC Installation, Cable and Raceway, Test & Commissioning of Electrical system
Sep, 98 ~ Sep, 02
AES / HDEC
Haripur 365MW Combined Cycle Power Plant (Bangladesh)
All Electrical and I&C Installation work, Test & commissioning
Nov, 99 ~ Oct, 01
- 17 -
MAJOR EXPERIENCES
Power Plant
1
CLIENT
PROJECT NAME
WORK DESCRIPTION
PERIOD
EVN / HDEC
Phalai Thermal Power Plant (Vietnam)
Construction supervision for I&C and Electrical work, Test and Commissioning Work. Details for I&C works can be provided upon request
Nov, 99 ~ Oct, 01
RPC / KOLON
Mymensingh Power Plant (Bangladesh)
70MW Gas Turbine Power Plant Procurement, Mechanical, Electrical and I&C erection work, Test & commissioning
Aug, 99 ~ Aug, 01
KEPCO / SAMWHAM
Dang-jin No.1~4 Thermal Power Plant Desulfurization (Korea)
Related all erection work for Electrical and I&C
Aug, 97 ~ Apr, 01
SCECO / HDEC
Extention Work for Qassim Power Plant (K.S.A)
132/ 22 KV GIS and SWGR installation, Cable connection work. Test and Commissioning work.
Feb, 99 ~ Apr, 00
HHI / HDEC
Dae-San Combined Cycle Power Plant (Korea)
345KV Switch Yard , 7.2KV SW/GR, MCC Installation, Cable Raceway and Cable Installation, Electrical Test Dec, 96 ~ May, 98 and Energization, I&C Bench/Field Calibration and Loop Test. DCS system Logic Circuit Checkout.
KEPCO / HDEC
Bun-Dang Heat Combined Power Plant (Korea)
Electrical Erection, Test / Commissioning Mechanical Equipment Erection and Associated piping
- 18 -
Feb, 92 ~ Dec, 95
MAJOR EXPERIENCES - Power Network and Substation
■ PROJECT EXPERTISE for T/L & SUBSTATION
: 345-154KV T/L & S/S work for KEPCO (in Korea) : 115KV S/S work for PEA (in Thailand) : 120KV S/S work for EVN (in Vietnam) ■ PROJECT EXPERTISE for SUBSTATION
: Substation erection through 345KV (GIS) : Substation test & commissioning
■ SCOPE OF WORK
¾ 345/230/154KV Transmission Lines ¾ 345/154KV Substation Project ¾ Underground Power and Communication Cable ¾ SCADA system - 19 -
MAJOR EXPERIENCES
Substation & Transmission Line
1
CLIENT
PROJECT NAME
WORK DESCRIPTION
PERIOD
Power Grid Company of Bangladesh Ltd.
BT 230KV Transmission Line
Design Build and Turnkey, 230KV Double Circuit Transmission Line
Sep, 04 ~ Feb, 07
PEA / HDEC
115KV Substation (Thailand)
115KV GIS and 7.2KV SWGR and MCC installation, Cable connection work. Test and Commissioning work
May, 98 ~ Jun, 00
In-Cheon International Airport Corp.
Incheon International Airport Substation (Korea)
7.2KV SWGR and MCC installation, Cable connection work. Test and Commissioning work
Jul, 99 ~ Jul, 00
Seoul Metropolitan Subway Corp.
Substation No.7 / Section No.2 (Korea)
22KV and 7.2KV SWGR and MCC installation, Cable connection work. Test and Commissioning. DCS Connection work.
Feb, 99 ~ Mar,00
KEPCO / HDEC
154KV Poong-Nab Substation (Korea)
154KV GIS and MCC installation, Cable connection work. Test and Commissioning work
Sep, 95 ~ Apr, 96
ARAMCO / HDEC
66KV Aramco Substation (K.S.A)
66KV SWGR and MCC installation, Cable connection work. Test and Commissioning work.
Nov, 93 ~ Jun, 94
EDL / HDEC
Lebanon Electrical Power Rehabilitation Project (Lebanon)
Rehabilitation work for 54EA Substations including distribution lines (Partially Participated)
Oct, 94 ~ Jun, 95
- 20 -
MAJOR EXPERIENCES - Petrochemical Plant ■ PROJECT NAME
: Melitah Gas Field Development Project ■ CLIENT
: Hyundai Engineering & Construction Co., Ltd. ■ LOCATION
: Libya ■ PERIOD
: Nov, 2003 ~ Dec, 2005
■ SCOPE OF WORK
- Electrical Erection - Instrumentation Erection - Test and commissioning for Electrical and I&C
- 21 -
MAJOR EXPERIENCES
Petrochemical Plant
1
CLIENT
PROJECT NAME
WORK DESCRIPTION
PERIOD
Attahaddy Gas Field Development Project (Libya)
115KV Transmission Line installation, All Electrical and I&C work
Feb, 01 ~ Jul, 02
Daelim Industrial Co., Ltd.
OLEFIN-III (K.S.A)
7.2KV SWGR and MCC installation, Instrument Equipment Cable & Connection work. I&C works, Test and Commissioning work. DCS system
Mar, 99 ~ Oct, 00
Hyundai Oil Refinery Co. / HDEC
200,000 Barrel Ext. of Oil Refinery Plant (Korea)
Electrical and I&C Erection, Test and Commissioning for Electrical and I&C
May, 95 ~ Jun, 96
Raslanuf Oil & Gas Co. / HDEC
RASCO Package 3-A, B (Libya)
Electrical and I&C erection
Jan, 94 ~ Sep, 97
Hyundai Eng’g & Con. Co.
Melitah Gas Field Development Project (Libya)
Electrical and I&C erection work and Test/Comm. for Gas Development Project
Sirte Oil Company / HDEC
- 22 -
Nov, 03 ~ Dec, 05
MAJOR EXPERIENCES - Chemical Plant
■ PROJECT NAME
: Hyundai Petrochemical Complex Project Eo Purification Unit ■ CLIENT
: Hyundai Petrochemical Co., Ltd. ■ LOCATION
: Daesan Korea ■ PERIOD
: May, 1995 ~ February, 1996 ■ SCOPE OF WORK
: Mechanical, Electrical and I&C erection work Test / Comm’g for Electrical and I&C
- 23 -
MAJOR EXPERIENCES
Chemical / Industrial Plant
1
CLIENT
PROJECT NAME
WORK DESCRIPTION
PERIOD
JGC / HDEC
Turkmenistan Polypropylene Project (Turkmenistan)
33KV and 7.2KV SWGR and CC installation, I&C works, Raceway, Cable, Test and commissioning. DCS system
Sep, 99 ~ Oct, 01
SCANCEM / Hanjung Heavy industries
Dhaka Grinding Plant (Bangladesh)
Electrical erection, Test and Commissioning Work
Sep, 99 ~ Nov, 01
Hyundai Steel Co., Ltd.
Cold Steel Mill Project (Korea)
22KV and 7.2KV SWGR and MCC installation, I&C work, Raceway, Cable. Test and Commissioning. DCE system
Oct, 97 ~ Jan, 99
RAS Lanuf Oil & Gas Co.
RASCO PKG-B Project (Libya)
33KV and 7.2KV SWGR and MCC installation, I&C work, Raceway, Cable. Test and Commissioning.
Oct, 96 ~ Sep, 97
Poong-Kuk Alcohol Co., Ltd. Edible Alcohol Plant (Korea)
22KV and 7.2KV SWGR and MCC installation, I&C work, Cable & Connection work. Test and Commissioning work. DCE system
Mar, 95 ~ Sep, 95
POSCO / POSCON
Oxygen Plant (Korea)
22.9KV and 7.2 SWGR and MCC installation, Cable connection work. Test and Commissioning
Apr, 93 ~ Apr, 04
Hyundai Petrochemical
Hyundai Petrochemical Complex Project (Korea)
Mechanical, Electrical and I&C erection, Test and Commissioning
May, 95 ~ Feb, 96
- 24 -
MAJOR EXPERIENCES - Desalination/Water treatment plant
■ PROJECT
: Um Al Nar Desalination ‘B’ Station 62.5 MIGD
■ CLIENT
: ADWEA / Doosan Heavy Industries & Construction Co., Ltd
■ LOCATION
: U. A. E.
- 25 -
MAJOR EXPERIENCES
Desalination & Water treatment, Pump stations
1
CLIENT
PROJECT NAME
WORK DESCRIPTION
PERIOD
ADWEA / DHIC
Umm Al Nar Desalination ‘B’ Station 62.5MIGD (U.A.E)
220KV GIS extension, 11KV SWGR, MCC installation. All Electrical and I&C work, Test and Commissioning
Nov, 00 ~ Dec, 01
In-Cheon Water supply authority
Kong-Chon Water Supply & Purification Facility (Korea)
Mechanical, Electrical and I&C erection / Testing
Apr, 95 ~ Oct, 96
Kukdong E&C
Industrial Water Supply Facilities (Phase II) (Korea)
Pipe line 40Km, Pump Station 2 units Water treatment plant (240,000 Ton/day)
Jan, 93 ~ Dec, 96
PMU of Dong Nai / LG
Tien Tan Water Supply Plant
100,000 Ton/Day, Intake/Pumping Station Water Treatment Plant, Pipe line 4.6Km (1,200mmΦ) Drainage Pipe 8.9Km (600mm ~ 1,350mmΦ)
Sep, 00 ~ Aug, 02
ADWEA / TORISHIMA
Mirfa & Mussafah Pump Station
Erection of Mechanical Equipments and Piping Electrical and I&C Installation
Nov, 03 ~ May, 05
- 26 -
MAJOR EXPERIENCES - Building Electrical Works ■ PROJECT
: High-rise Building., Apartment Town , Hospital, Industrial Complex.
■ CLIENT
: Government and Private Company
■ LOCATION
: Korea
- 27 -
MAJOR EXPERIENCES
Building Electrical Works
1
CLIENT
PROJECT NAME
WORK DESCRIPTION
PERIOD
Government Employees Pension Corporation
Yong-In SangRok Apartment Project
All Electrical works and Fire Fighting works. Material Supply
Aug, 04 ~ Feb, 07
HDEC
Mok-Dong Hyperion Apartment & Office building (Korea)
All Electrical installations including SWGR, Raceway and Cables
Apr, 01 ~ Jun, 03
SHI
Samhwa Apartment type Factory Complex (Korea)
All Electrical works
Mar, 99 ~ Mar, 01
HDEC
Mok-Dong Grand Tower 41 (Korea)
All Electrical installations including 22KV, 7.2KV SWGR, Raceway and Cables
Nov, 97 ~ Mar, 01
GEPC
Yong-In Apartment for Civil Servants (Korea)
All Electrical works
Jan, 98 ~ Jan, 00
ARU
Reconstruction of Kwang-Bok Apartment (Korea)
All Electrical installations including SWGR, Raceway and Cables
Feb, 96 ~ Jan, 98
HEI / HDEC
Seoul ASAN Hospital (Korea)
Erection and commissioning of 22KV, 7.2KV SWGR, Equipment and Cable connection Communication and data Lan Cable
May, 95 ~ Apr, 97
HDEC
Il-San Grand Department Store (Korea)
All Electrical works including Equipment, Conduit and Cables
Nov, 95 ~ Nov, 96
- 28 -
MAJOR EXPERIENCES - Test & Commissioning Work
- 29 -
MAJOR EXPERIENCES
Test & Commissioning Works
1
CLIENT
PROJECT NAME
WORK DESCRIPTION
PERIOD
Daewoo Engineering & Construction Co.,Ltd.
Tritium Removal Facility Project for Wol-Sung Nuclear Power Plant
Test/ Comm. for Electrical and I&C for WolSung Nuclear Power Plant - Subcontractor
KOSEP
Routine Maintenance for Young-Heung Thermal Power Plant No. 1&2
Routine Maintenance work for I&C in Young-Heung Thermal Power Plant No.1&2 – Prime Contractor
Sep, 03 ~ Oct, 06
KEPCO/KPSEC
Seo-Incheon Combined Circle Power Plant (Korea)
Routine Maintenance work for Mechanical, Electrical and I&C
Apr, 05 ~ Mar, 06
KEPCO
Ul-Chin Nuclear Power Plant No. 5&6 (Korea)
Construction acceptance test, Electrical Energization. Plant system commissioning support for Electrical
Jun, 01 ~ May, 05
KEPCO / HDEC
Young-Kwang Nuclear Power Plant No. 5&6 (Korea)
345KV Switchyard Commissioning Plant system commissioning support for Electrical
Sep, 98 ~ Dec, 02
KEPCO / DAEWOO
Wol-Sung Nuclear Power Plant No. 2,3&4 (Korea)
345/154KV, 7.2KV SWGR, MCC Test and Energization.
Plant system commissioning support for Electrical
- 30 -
Jul, 04 ~ Jun, 07
Aug, 95 ~ Jun, 99
MAJOR EXPERIENCES
Test & Commissioning Works
1
CLIENT
PROJECT NAME
WORK DESCRIPTION
PERIOD
KEPCO / KHIC
Ul-Chin Nuclear Power Plant No. 3&4 (Korea)
EC / HDEC
Tabuk Power Plant (K.S.A)
132KV, 7.2KV SWGR, MCC and SCADA system and Instrument Equipments
Mar, 95 ~ May, 96
KEPCO / DHIC
Young-Kwang Nuclear Power Plant No. 3&4 (Korea)
Construction acceptance test, Electrical Energization. Plant system commissioning support for Electrical
Feb, 92 ~ Dec, 95
KEPCO / HDEC
Pun-Dang Combined Cycle Power Plant (Korea)
Construction test, Electrical Energization
Feb, 92 ~ Dec, 95
Korea District Heating Corp.
Joong-Dong District Heating Work (Korea)
Commissioning of Network Distribution system and Signaling Equipments
May, 92 ~ Jun, 93
Korea District Heating Corp.
Pun-Dang District Heating Work (Korea)
Commissioning of Network Distribution system and Signaling Equipments
Apr, 91 ~ Aug, 92
345/154KV GIS, 7.2KV SWGR, MCC Test and Energization.
Plant system commissioning support for Electrical
- 31 -
Sep, 95 ~ Jun, 99
INDEPENDENT MINI HYDRO POWER PLANT(IPP) - - - - - - - - - - - - Owned by Sejong Sejong owns/operates his own mini hydro power plant in two locations and sells its power to KEPCO through their network, which details are shown below ; 1. Commercial
Concrete Dam Capacity : 56million ㎥ Water head (distance) : 9.2 miter Selling to customer : KEPCO Annual output : 700 Mwh Electrical tariff selling to KEPCO : US$ 0.75 Turn over : US$ 5.25million 2. Technical works
▲ PO-CHEON Mini Hydro Power Plant (IPP)
- 32 -
Installed capacity Type of generator Type of wheel Step-up substation ▷ System voltage(1st/2nd) ▷ Rated frequency(Hz) ▷ Main switchgear Type
: 500KW , 3 Units : Induction generator : Propeller type : 380V/ 22.9KV : 60 : Vacuum Circuit Breaker
ISO Certificate