Sejong Company Profile(2007.08.31) - 세종기업

-10-MAJOR WORKS UNDER EXECUTION 1 AS OF 31 Aug, 2007 Apr, 05 ~ Jun, 08 Qatar USD 2.15 mil Electrical and I&C erection work and Test/ Comm. for Desalin...

5 downloads 430 Views 3MB Size
SEJONG CORPORATION

2007

COMPANY PROFILE

TABLE OF CONTENTS ™ Introduction

············································

™ Head & Branch Office

····································

™ Management Strategy & Spirits ™ Profile

3

···························

4

·················································

5

™ Organization Chart ™ Manpower Resources ™ Scope of Business ™ Projects in Progress ™ Major Experiences

·········································

6

········································

7

···········································

8

·········································

9

···········································

12

™ Independent Mini Hydro Power Plant ™ ISO Certificate

2

·························

32

··············································

33

-1-

INTRODUCTION It is our great honor and pleasure to render you the opportunity to understand and evaluate our potential capabilities and qualification through the long and vast projects during the last 16 years since established in 1991. As one of the leading specialized erection contractor for electro-mechanical and instrumentation works having its principal works, such as supply, supervision, erection, test/commissioning and operation& maintenance, we have achieved numerous outstanding performance in the plant business field of electro-mechanical and instrumentation at home and abroad. By virtue of our highly qualified construction ability based on good manner of workmanship and good reputation from our customers, we can provide you with confidence that the project will be completed on time within the budget and the quality parameters originally established for it. We hope that this company profile will meet your requirements and will lead both of us eventually to the opportunities to cooperate. -2-

HEAD & BRANCH OFFICE Sejong’s overseas operational activities are conducted by division of overseas works in head office in close coordination with regional branch offices located in U.A.E , Bangladesh and liaison offices in Libya & Philippine. Our services are committed to productive efficiency coupled with quality assurance, work place safety and environment friendly execution of projects.

‰

Head Office Address : 901-3, Jakjeon-dong, Gyeyang-gu, Incheon-City, Korea Tele : +82-32-555-5577, Fax : +82-32-555-6554 E-Mail : [email protected]

‰

UAE branch Office Dubai - Sejong Emirates Electro-Mechanical Contracting LLC. Add. : P.O Box 28747 Dubai, U.A.E / Tel : +971-4-390-8540 / Fax : +971-4-390-5841 Abu Dhabi - Al Hasoun Sejong Electro-mechanical Est. Add. : P.O Box 3930 Abu Dhabi, U.A.E / Tel : +971-2-621-4678 / Fax : +971-2-621-6882

‰

Bangladesh Agent (SAHCO International Ltd.) Address : UTC Tower Level-18.8, Panthapath, Dhaka 1213, Bangladesh Tele : +880-2-815-4177 / Fax : +880-2-815-9787 -3-

MANAGEMENT STRATEGY & SPIRITS

MANAGEMENT STRATEGY ■ Individual Excellence ■ First Choice of Customers

SPIRITS



■ Cost Saving

■ Innovative Thinking ■ Full Commitment ■ Fair Manner

■ Perfect Performance

-4-

PROFILE ■ Over 290 permanent employees

BUSINESS PORTFOLIO (%)

■ Sales target in excess of $98Million (2007)

TRENDS OF SALES Building & Housing

(US$ Million)

Petrochemical Plant

11 %

18%

Industrial Plant

60 50

15%

Substation & Transmission Line

70

40

15% 41%

30

Power Plant

20 10 0

2001 2002 2003 2004 2005 2006 -5-

ORGANIZATION CHART

Head Office

QA / QC

Division of Domestic Works

Division of Overseas Works

Division of Plant O&M

-6-

Division of Marketing

Division of Management & Finance

MANPOWER RESOURCES Technical Persons 1. Construction Group

Human Resources 228 (63) persons

Administrative Staff 12(6) Instrumentation Electrical 32(43) 84(3)

Mechanical Mechanical 79(7) 95

Professional Engineer

Senior Engineer

Engineer

Supervisor

Total

Mechanical

4

14

12

49

79

Electrical

5

16

15

48

84

Instrumentation

2

6

6

18

32

QA/QC

1

2

6

12

21

Total

12

38

39

127

216

QA / QC QA / QC 21(4) 26

* ( ) Maintenance Group

2. Maintenance Group Professional Engineer

Senior Engineer

Engineer

Technician

Total

Mechanical

1

1

2

3

7

Electrical

1

1

1

3

Instrumentation

3

7

13

20

43

QA/QC

1

1

1

1

4

Total

6

9

17

25

57

-7-

SCOPE OF BUSINESS Specialized knowledge and experience of Sejong’s staffs have led us to the successful operation in the following areas; ƒ Power Generation Plant - Erection of Gas Turbine, Steam Turbine, HRSG and Associated piping, BOP piping Test & Pre-commissioning, Operation and maintenance. In Particular, Sejong is ASME “A” certified company for Power Boiler Field Assembly. ƒ Electrical Transmission Line and Substation - High voltage electrical construction including transmission and distribution line, substation erection, test & commissioning, underground power and communication cable, communication tower and fiber optics cable installations. ƒ Petrochemical and Gas Processing Plant - Mechanical Erection & Associated piping, Field piping, Steel Structure work, Electrical and I&C works including DCS ƒ Water Treatment and Pump Stations - Electro-Mechanical Erection works and Associated piping, I&C, Test & Commissioning. ƒ Cement Plant - Electrical and I & C work, commissioning and start-up. ƒ Commercial building - Electrical & Communication work for Super tower buildings, hotels and hospitals.

-8-

MAJOR WORKS UNDER EXECUTION

AS OF 31 Aug, 2007

1

CLIENT

PROJECT NAME

WORK DESCRIPTION

Location

Value

PERIOD

Hyundai Engineering Jebel Ali Power and Desalination & Construction co.,Ltd. Station ‘L’ Phase-II

Mechanical, Electrical and I&C erection work Support of Test/Comm. for Combined Cycle Power Plant - Subcontractor

U.A.E

USD 18.9 mil

Mar, 06 ~ Nov, 07

KOC / Hyundai Heavy Industries Co.

Crude Oil Export Facilities Project

Election and I&C erection Work Cathodic Protection erection Telecommunication Work

Kuwait

USD 7.9 mil

May, 06 ~ Jun, 08

Doosan Heavy Industries Co.Ltd.

Taweelah A10 Power Plants

Mechanical and Electrical Works, Site Painting works and Insulation works - Subcontractor

U.A.E

USD 11.0 mil

Aug, 07 ~ Mar, 09

Mechanical, Electrical Works and Support of Test/Comm. for Liquid Processing Unit Works - Subcontractor

Qatar

USD 13.8 mil

Sep, 07 ~ May, 10

Electrical and I&C erection and Test/ Comm. for Feed Water Preparation Works - Subcontractor

Qatar

USD 6.0 mil

Jul, 08 ~ May, 10

Pearl GTL Project Hyundai Engineering Liquid Processing Unit (LPU) & Construction co.,Ltd. Works

Hyundai Heavy Industries Co.,Ltd.

Pearl GTL Project Feed Gas Preparation (FGP) Works

-9-

MAJOR WORKS UNDER EXECUTION

AS OF 31 Aug, 2007

1

CLIENT

PROJECT NAME

WORK DESCRIPTION

Location

Value

PERIOD

Doosan Heavy Industries Co.Ltd.

Ras Laffan Desalination Plant

Electrical and I&C erection work and Test/ Comm. for Desalination Project - Subcontractor

Qatar

USD 2.15 mil

Apr, 05 ~ Jun, 08

Siemens

Ras Laffan B Project

BOP piping work for Power Plant – Subcontractor

Qatar

USD 9.0 mil

Jul, 05 ~ Apr, 07

Jabel Ali New Container Hyundai Engineering Terminal Stage 1, Upland & Construction co.,Ltd. Facilities, LCC-2,3 Project

Electrical design, erection and Test/Comm. for Container Terminal Project - Subcontractor

UAE

USD 4.6 mil

Jun, 06 ~ Nov, 07

Doosan Heavy Industries Co.Ltd.

Electrical and I&C erection and Test/ Comm. for Distillation Plant - Subcontractor

Kuwait

USD 7.5 mil

Dec, 04 ~ Jan, 07

Libya

USD 4.7 mil

May, 05 ~ Jun, 07

Sabiya Distillation Plants with Recarbonation System

Hyundai Engineering Zawia Combined Cycle Power & Construction co.,Ltd. Plant

Electrical and I&C erection works and Test/ Comm. for Zawia Combined Cycle Power Plant – Subcontractor

- 10 -

MAJOR WORKS UNDER EXECUTION

AS OF 31 Aug, 2007

1

CLIENT

PROJECT NAME

WORK DESCRIPTION

Location

Value

PERIOD

Libya

USD 1.0 mil

Dec, 05 ~ Feb, 07

Daewoo Engineering Benghazi North Combined & Construction co.,Ltd. Cycle Power Plant

Test & Commissioning work for Combined Cycle Power Plant - Subcontractor

KNER / Hyundai Engineering & Construction co.,Ltd

New Ethane Recovery Plant Project

Electrical Erection Work Cathodic Protection erection

Kuwait

USD 1.6 mil

Apr, 06 ~ Aug, 07

GS E&C

Bu-Gok Combined Cycle Power Plant No.2

Electrical and I&C Erection Work. Support of Test/ Comm. for Combined Cycle Power Plant – Subcontractor

Korea

USD 4.5 mil

Jul, 06 ~ Feb, 08

KHNP

Routine Maintenance for Young-Kwang Nuclear Power Plant No. 3&4, 5&6

Routine Maintenance work for I&C YoungKwang Nuclear Power Plant – Prime Contractor

Korea

USD 13 mil

Nov, 05 ~ Apr, 08

Hyundai Heavy Industries Co.Ltd.

Routine Maintenance for DaeSan Heat Combined Cycle Power Plant

Routine Maintenance work for Mechanical, Electrical and I&C in Dae-San Heat Combined Cycle Power Plant – Prime Contractor

Korea

USD 0.6 mil/year

Contractrenewal

POSCO Engineering & Construction Co.,Ltd

Song-do the# 1st World Apartment Project

All Electrical Installations and Material Supply

Korea

USD 2.2 mil

Aug, 06 ~ Jan, 09

- 11 -

Long Term Biannually

MAJOR EXPERIENCES - Nuclear Power Plants

■ PROJECT NAME : Yeongkwang Nuclear Power Plant(No. 1 ~ 6 units) ■ CLIENT : Korea Electric Power Co., Ltd (KEPCO) ■ LOCATION : Yeongkwang, Korea ■ PERIOD : Feb. 15, 1995 ~ Dec. 31, 2002

■ SCOPE OF WORK : Refer to page 14

- 12 -

MAJOR EXPERIENCES - Nuclear Power Plants

- 13 -

MAJOR EXPERIENCES

Nuclear Power Plant

1

CLIENT

PROJECT NAME

KEPCO / DHIC

Ul-Chin Nuclear Power Plant No. 5&6 (Korea)

KEPCO / HDEC

Young-Kwang Nuclear Power Plant No. 5&6 (Korea)

KEPCO / KHIC

Ul-Chin Nuclear Power Plant No. 3&4 (Korea)

KEPCO / HDEC, DAEWOO

Wol-Sung Nuclear Power Plant No. 2,3&4 (Korea)

KEPCO / HDEC

Young-Kwang Nuclear Power Plant No. 3&4 (Korea)

WORK DESCRIPTION Work description listed below can be applicable to all nuclear power stations since the work activities we had performed in those stations are almost identical to each other even though there are some differences in quantities. 1. Construction Test and Energization for 154KV Switch Yard and related system for starting power from network 2. Construction Test and Energization for 354KV Switch Yard and related system for power exporting to network. (354KV outdoor type GIS, 1000MVA Transformer – 2 Units) 3. Medium Voltage Switch Gear (7.2KV & 4.16KV), MCC TRs etc. Construction Test & Energization 4. All Electrical individual/ combined test for system including motor drive 5. Support of NSSS system check out 6. Field Instrument calibration and loop test for individual system 7. Pre-operational test for individual system and support for integrated test such as Cold/ Hot Hydro test 8. Startup support for power plant electrical and instrumentation system - 14 -

PERIOD

Jun, 01 ~ May, 05

Sep, 98 ~ Dec, 02

Sep, 95 ~ Jun, 99

Aug, 95 ~ Jun, 97

Feb, 92 ~ Dec, 95

MAJOR EXPERIENCES - Combined Cycle Power Plant

■ PROJECT NAME : 1550MW Umm Al Nar Water and Power Project ■ CLIENT : Toshiba Plant System & Service Corp. ■ LOCATION : Umm Al Nar, U.A.E ■ PERIOD : Feb, 04 ~ Jan, 06 ■ SCOPE OF WORK : Erection of Gas Turbine, Steam Turbine, HRSG and Associated Piping, BOP Piping and Support of Test & Commissioning - 15 -

MAJOR EXPERIENCES - Combined Cycle Power Plant

Steam Turbine Generator Capacity : 318MW x 2 Units Manuf’r : Toshiba

Heat Recovery Steam Generator

Gas Turbine Generator

Capacity : 620 Ton/Hour x 5 Units Manuf’r : Doosan Heavy Industries

Capacity : 230MW x 5 Units Manuf’r : GE (Frame 9EA)

- 16 -

MAJOR EXPERIENCES

Power Plant

1

CLIENT

PROJECT NAME

WORK DESCRIPTION

PERIOD

Toshiba Plant System & Service Corp.

Umm Al Nar Independent Power Plant

Mechanical, Electrical and I&C erection work Support of Test/Comm. for 1550MW Combined Cycle Power Plant - Subcontractor

Feb, 04 ~ Jan, 06

SAMHWAN CORPORATION

Sam-Chon-Po Thermal Power Plant Desulfurization Project

Erection and Test/Comm. for Electrical and I&C works for Desulfurization Project In Sam-Chon-Po Termal Power Plant

May, 03 ~Dec, 04

U.A.E Offsets Group / DHIC

Fujairah Water & Power Plant

132KV GIS 14 Bays (Hyundai), Generator (Alstom), Gas Turbine 4 sets (GE), HRSG 4 sets related Electrical and I&C works. All erection work for Electrical and I&C for Power Plant side including Test and Commissioning

Mar, 02 ~ Dec, 03

AES / HDEC

Meghnaghat 450MW Combined Cycle Power Plant (Bangladesh)

All Electrical and I&C Installation work, Test & commissioning

Apr, 01 ~ Dec, 02

KEPCO / HDEC

Tae-An Thermal Power Plant No.5&6 (Korea)

7.2KV SWGR and MCC Installation, Cable and Raceway, Test & Commissioning of Electrical system

Sep, 98 ~ Sep, 02

AES / HDEC

Haripur 365MW Combined Cycle Power Plant (Bangladesh)

All Electrical and I&C Installation work, Test & commissioning

Nov, 99 ~ Oct, 01

- 17 -

MAJOR EXPERIENCES

Power Plant

1

CLIENT

PROJECT NAME

WORK DESCRIPTION

PERIOD

EVN / HDEC

Phalai Thermal Power Plant (Vietnam)

Construction supervision for I&C and Electrical work, Test and Commissioning Work. Details for I&C works can be provided upon request

Nov, 99 ~ Oct, 01

RPC / KOLON

Mymensingh Power Plant (Bangladesh)

70MW Gas Turbine Power Plant Procurement, Mechanical, Electrical and I&C erection work, Test & commissioning

Aug, 99 ~ Aug, 01

KEPCO / SAMWHAM

Dang-jin No.1~4 Thermal Power Plant Desulfurization (Korea)

Related all erection work for Electrical and I&C

Aug, 97 ~ Apr, 01

SCECO / HDEC

Extention Work for Qassim Power Plant (K.S.A)

132/ 22 KV GIS and SWGR installation, Cable connection work. Test and Commissioning work.

Feb, 99 ~ Apr, 00

HHI / HDEC

Dae-San Combined Cycle Power Plant (Korea)

345KV Switch Yard , 7.2KV SW/GR, MCC Installation, Cable Raceway and Cable Installation, Electrical Test Dec, 96 ~ May, 98 and Energization, I&C Bench/Field Calibration and Loop Test. DCS system Logic Circuit Checkout.

KEPCO / HDEC

Bun-Dang Heat Combined Power Plant (Korea)

Electrical Erection, Test / Commissioning Mechanical Equipment Erection and Associated piping

- 18 -

Feb, 92 ~ Dec, 95

MAJOR EXPERIENCES - Power Network and Substation

■ PROJECT EXPERTISE for T/L & SUBSTATION

: 345-154KV T/L & S/S work for KEPCO (in Korea) : 115KV S/S work for PEA (in Thailand) : 120KV S/S work for EVN (in Vietnam) ■ PROJECT EXPERTISE for SUBSTATION

: Substation erection through 345KV (GIS) : Substation test & commissioning

■ SCOPE OF WORK

¾ 345/230/154KV Transmission Lines ¾ 345/154KV Substation Project ¾ Underground Power and Communication Cable ¾ SCADA system - 19 -

MAJOR EXPERIENCES

Substation & Transmission Line

1

CLIENT

PROJECT NAME

WORK DESCRIPTION

PERIOD

Power Grid Company of Bangladesh Ltd.

BT 230KV Transmission Line

Design Build and Turnkey, 230KV Double Circuit Transmission Line

Sep, 04 ~ Feb, 07

PEA / HDEC

115KV Substation (Thailand)

115KV GIS and 7.2KV SWGR and MCC installation, Cable connection work. Test and Commissioning work

May, 98 ~ Jun, 00

In-Cheon International Airport Corp.

Incheon International Airport Substation (Korea)

7.2KV SWGR and MCC installation, Cable connection work. Test and Commissioning work

Jul, 99 ~ Jul, 00

Seoul Metropolitan Subway Corp.

Substation No.7 / Section No.2 (Korea)

22KV and 7.2KV SWGR and MCC installation, Cable connection work. Test and Commissioning. DCS Connection work.

Feb, 99 ~ Mar,00

KEPCO / HDEC

154KV Poong-Nab Substation (Korea)

154KV GIS and MCC installation, Cable connection work. Test and Commissioning work

Sep, 95 ~ Apr, 96

ARAMCO / HDEC

66KV Aramco Substation (K.S.A)

66KV SWGR and MCC installation, Cable connection work. Test and Commissioning work.

Nov, 93 ~ Jun, 94

EDL / HDEC

Lebanon Electrical Power Rehabilitation Project (Lebanon)

Rehabilitation work for 54EA Substations including distribution lines (Partially Participated)

Oct, 94 ~ Jun, 95

- 20 -

MAJOR EXPERIENCES - Petrochemical Plant ■ PROJECT NAME

: Melitah Gas Field Development Project ■ CLIENT

: Hyundai Engineering & Construction Co., Ltd. ■ LOCATION

: Libya ■ PERIOD

: Nov, 2003 ~ Dec, 2005

■ SCOPE OF WORK

- Electrical Erection - Instrumentation Erection - Test and commissioning for Electrical and I&C

- 21 -

MAJOR EXPERIENCES

Petrochemical Plant

1

CLIENT

PROJECT NAME

WORK DESCRIPTION

PERIOD

Attahaddy Gas Field Development Project (Libya)

115KV Transmission Line installation, All Electrical and I&C work

Feb, 01 ~ Jul, 02

Daelim Industrial Co., Ltd.

OLEFIN-III (K.S.A)

7.2KV SWGR and MCC installation, Instrument Equipment Cable & Connection work. I&C works, Test and Commissioning work. DCS system

Mar, 99 ~ Oct, 00

Hyundai Oil Refinery Co. / HDEC

200,000 Barrel Ext. of Oil Refinery Plant (Korea)

Electrical and I&C Erection, Test and Commissioning for Electrical and I&C

May, 95 ~ Jun, 96

Raslanuf Oil & Gas Co. / HDEC

RASCO Package 3-A, B (Libya)

Electrical and I&C erection

Jan, 94 ~ Sep, 97

Hyundai Eng’g & Con. Co.

Melitah Gas Field Development Project (Libya)

Electrical and I&C erection work and Test/Comm. for Gas Development Project

Sirte Oil Company / HDEC

- 22 -

Nov, 03 ~ Dec, 05

MAJOR EXPERIENCES - Chemical Plant

■ PROJECT NAME

: Hyundai Petrochemical Complex Project Eo Purification Unit ■ CLIENT

: Hyundai Petrochemical Co., Ltd. ■ LOCATION

: Daesan Korea ■ PERIOD

: May, 1995 ~ February, 1996 ■ SCOPE OF WORK

: Mechanical, Electrical and I&C erection work Test / Comm’g for Electrical and I&C

- 23 -

MAJOR EXPERIENCES

Chemical / Industrial Plant

1

CLIENT

PROJECT NAME

WORK DESCRIPTION

PERIOD

JGC / HDEC

Turkmenistan Polypropylene Project (Turkmenistan)

33KV and 7.2KV SWGR and CC installation, I&C works, Raceway, Cable, Test and commissioning. DCS system

Sep, 99 ~ Oct, 01

SCANCEM / Hanjung Heavy industries

Dhaka Grinding Plant (Bangladesh)

Electrical erection, Test and Commissioning Work

Sep, 99 ~ Nov, 01

Hyundai Steel Co., Ltd.

Cold Steel Mill Project (Korea)

22KV and 7.2KV SWGR and MCC installation, I&C work, Raceway, Cable. Test and Commissioning. DCE system

Oct, 97 ~ Jan, 99

RAS Lanuf Oil & Gas Co.

RASCO PKG-B Project (Libya)

33KV and 7.2KV SWGR and MCC installation, I&C work, Raceway, Cable. Test and Commissioning.

Oct, 96 ~ Sep, 97

Poong-Kuk Alcohol Co., Ltd. Edible Alcohol Plant (Korea)

22KV and 7.2KV SWGR and MCC installation, I&C work, Cable & Connection work. Test and Commissioning work. DCE system

Mar, 95 ~ Sep, 95

POSCO / POSCON

Oxygen Plant (Korea)

22.9KV and 7.2 SWGR and MCC installation, Cable connection work. Test and Commissioning

Apr, 93 ~ Apr, 04

Hyundai Petrochemical

Hyundai Petrochemical Complex Project (Korea)

Mechanical, Electrical and I&C erection, Test and Commissioning

May, 95 ~ Feb, 96

- 24 -

MAJOR EXPERIENCES - Desalination/Water treatment plant

■ PROJECT

: Um Al Nar Desalination ‘B’ Station 62.5 MIGD

■ CLIENT

: ADWEA / Doosan Heavy Industries & Construction Co., Ltd

■ LOCATION

: U. A. E.

- 25 -

MAJOR EXPERIENCES

Desalination & Water treatment, Pump stations

1

CLIENT

PROJECT NAME

WORK DESCRIPTION

PERIOD

ADWEA / DHIC

Umm Al Nar Desalination ‘B’ Station 62.5MIGD (U.A.E)

220KV GIS extension, 11KV SWGR, MCC installation. All Electrical and I&C work, Test and Commissioning

Nov, 00 ~ Dec, 01

In-Cheon Water supply authority

Kong-Chon Water Supply & Purification Facility (Korea)

Mechanical, Electrical and I&C erection / Testing

Apr, 95 ~ Oct, 96

Kukdong E&C

Industrial Water Supply Facilities (Phase II) (Korea)

Pipe line 40Km, Pump Station 2 units Water treatment plant (240,000 Ton/day)

Jan, 93 ~ Dec, 96

PMU of Dong Nai / LG

Tien Tan Water Supply Plant

100,000 Ton/Day, Intake/Pumping Station Water Treatment Plant, Pipe line 4.6Km (1,200mmΦ) Drainage Pipe 8.9Km (600mm ~ 1,350mmΦ)

Sep, 00 ~ Aug, 02

ADWEA / TORISHIMA

Mirfa & Mussafah Pump Station

Erection of Mechanical Equipments and Piping Electrical and I&C Installation

Nov, 03 ~ May, 05

- 26 -

MAJOR EXPERIENCES - Building Electrical Works ■ PROJECT

: High-rise Building., Apartment Town , Hospital, Industrial Complex.

■ CLIENT

: Government and Private Company

■ LOCATION

: Korea

- 27 -

MAJOR EXPERIENCES

Building Electrical Works

1

CLIENT

PROJECT NAME

WORK DESCRIPTION

PERIOD

Government Employees Pension Corporation

Yong-In SangRok Apartment Project

All Electrical works and Fire Fighting works. Material Supply

Aug, 04 ~ Feb, 07

HDEC

Mok-Dong Hyperion Apartment & Office building (Korea)

All Electrical installations including SWGR, Raceway and Cables

Apr, 01 ~ Jun, 03

SHI

Samhwa Apartment type Factory Complex (Korea)

All Electrical works

Mar, 99 ~ Mar, 01

HDEC

Mok-Dong Grand Tower 41 (Korea)

All Electrical installations including 22KV, 7.2KV SWGR, Raceway and Cables

Nov, 97 ~ Mar, 01

GEPC

Yong-In Apartment for Civil Servants (Korea)

All Electrical works

Jan, 98 ~ Jan, 00

ARU

Reconstruction of Kwang-Bok Apartment (Korea)

All Electrical installations including SWGR, Raceway and Cables

Feb, 96 ~ Jan, 98

HEI / HDEC

Seoul ASAN Hospital (Korea)

Erection and commissioning of 22KV, 7.2KV SWGR, Equipment and Cable connection Communication and data Lan Cable

May, 95 ~ Apr, 97

HDEC

Il-San Grand Department Store (Korea)

All Electrical works including Equipment, Conduit and Cables

Nov, 95 ~ Nov, 96

- 28 -

MAJOR EXPERIENCES - Test & Commissioning Work

- 29 -

MAJOR EXPERIENCES

Test & Commissioning Works

1

CLIENT

PROJECT NAME

WORK DESCRIPTION

PERIOD

Daewoo Engineering & Construction Co.,Ltd.

Tritium Removal Facility Project for Wol-Sung Nuclear Power Plant

Test/ Comm. for Electrical and I&C for WolSung Nuclear Power Plant - Subcontractor

KOSEP

Routine Maintenance for Young-Heung Thermal Power Plant No. 1&2

Routine Maintenance work for I&C in Young-Heung Thermal Power Plant No.1&2 – Prime Contractor

Sep, 03 ~ Oct, 06

KEPCO/KPSEC

Seo-Incheon Combined Circle Power Plant (Korea)

Routine Maintenance work for Mechanical, Electrical and I&C

Apr, 05 ~ Mar, 06

KEPCO

Ul-Chin Nuclear Power Plant No. 5&6 (Korea)

Construction acceptance test, Electrical Energization. Plant system commissioning support for Electrical

Jun, 01 ~ May, 05

KEPCO / HDEC

Young-Kwang Nuclear Power Plant No. 5&6 (Korea)

345KV Switchyard Commissioning Plant system commissioning support for Electrical

Sep, 98 ~ Dec, 02

KEPCO / DAEWOO

Wol-Sung Nuclear Power Plant No. 2,3&4 (Korea)

345/154KV, 7.2KV SWGR, MCC Test and Energization.

Plant system commissioning support for Electrical

- 30 -

Jul, 04 ~ Jun, 07

Aug, 95 ~ Jun, 99

MAJOR EXPERIENCES

Test & Commissioning Works

1

CLIENT

PROJECT NAME

WORK DESCRIPTION

PERIOD

KEPCO / KHIC

Ul-Chin Nuclear Power Plant No. 3&4 (Korea)

EC / HDEC

Tabuk Power Plant (K.S.A)

132KV, 7.2KV SWGR, MCC and SCADA system and Instrument Equipments

Mar, 95 ~ May, 96

KEPCO / DHIC

Young-Kwang Nuclear Power Plant No. 3&4 (Korea)

Construction acceptance test, Electrical Energization. Plant system commissioning support for Electrical

Feb, 92 ~ Dec, 95

KEPCO / HDEC

Pun-Dang Combined Cycle Power Plant (Korea)

Construction test, Electrical Energization

Feb, 92 ~ Dec, 95

Korea District Heating Corp.

Joong-Dong District Heating Work (Korea)

Commissioning of Network Distribution system and Signaling Equipments

May, 92 ~ Jun, 93

Korea District Heating Corp.

Pun-Dang District Heating Work (Korea)

Commissioning of Network Distribution system and Signaling Equipments

Apr, 91 ~ Aug, 92

345/154KV GIS, 7.2KV SWGR, MCC Test and Energization.

Plant system commissioning support for Electrical

- 31 -

Sep, 95 ~ Jun, 99

INDEPENDENT MINI HYDRO POWER PLANT(IPP) - - - - - - - - - - - - Owned by Sejong Sejong owns/operates his own mini hydro power plant in two locations and sells its power to KEPCO through their network, which details are shown below ; 1. Commercial

ƒ Concrete Dam Capacity : 56million ㎥ ƒ Water head (distance) : 9.2 miter ƒ Selling to customer : KEPCO ƒ Annual output : 700 Mwh ƒ Electrical tariff selling to KEPCO : US$ 0.75 ƒ Turn over : US$ 5.25million 2. Technical works

ƒ ƒ ƒ ƒ ▲ PO-CHEON Mini Hydro Power Plant (IPP)

- 32 -

Installed capacity Type of generator Type of wheel Step-up substation ▷ System voltage(1st/2nd) ▷ Rated frequency(Hz) ▷ Main switchgear Type

: 500KW , 3 Units : Induction generator : Propeller type : 380V/ 22.9KV : 60 : Vacuum Circuit Breaker

ISO Certificate

- 33 -