1. Manual of Specifications and Standards to apply. Subject to the provisions of Paragraph 2 of this Annex-I, Two-Laning of the Project. Highway shall...
KLM Technology Group Project Engineering Standard BASIC DESIGN PACKAGE (PROJECT STANDARDS AND SPECIFICATIONS) Page 2 of 23 Rev: 01.1 Feb 2011
KLM Technology Group Project Engineering Standard (PROJECT STANDARDS AND Sept 2012 SPECIFICATION FOR INSTRUMENTATION DESIGN SPECIFICATIONS) Page 2 of 41
KLM Technology Group Project Engineering Standard INSTRUMENTATION DESIGN CRITERIA (PROJECT STANDARDS AND SPECIFICATIONS) Page 2 of 44 Rev: 01 June 2011
KLM Technology Group Project Engineering Standard PROCESS DESIGN OF LIQUID & GAS TRANSFER AND STORAGE (PROJECT STANDARDS AND SPECIFICATIONS) Page 2 of 55
2.2.10. Water and Sewer Line Separation. 2.2.11. Pump Stations. 2.3 Water Services. 2.3.1. Standard Water Services. 2.3.2. Irrigation Water Services ..... DISTRICT'S current Water System Plan and the. DISTRICT'S 20-year Capital Improvement Program. 2
KLM Technology Group Project Engineering Standard PROCESS DESIGN OF FLARE AND BLOWDOWN SYSTEMS (PROJECT STANDARDS AND SPECIFICATIONS) Page 2 of 41 Rev: 01
KLM Technology Group Project Engineering Standard PLANT PIPING SYSTEMS DESIGN CRITERIA (PROJECT STANDARDS AND SPECIFICATIONS) Page 2 of 62 Rev: 01 June 2011
NUMBERING OF PROJECT SPECIFICATIONS AND DATA SHEETS. 14. DRAWINGS NUMBERING SYSTEM ... numbering system including numbering for instrument and electrical equipment, piping line and engineering ... documents and drawings such as Process Flow Diagram (
KLM Technology Group Project Engineering Standard PROCESS DESIGN OF PIPING SYSTEMS (PROCESS PIPING AND PIPELINE SIZING) (PROJECT STANDARDS AND SPECIFICATIONS)
of State Highways (IRC: SP:73-2007)”, “Specification for Road and Bridge Work” by Government of. India, MORTH and .... xviii) TCS-13(b) : 2-lane Bridge approaches – Left side retaining wall and right side fill slope xix) ..... expression given in App
KLM Technology Group Project Engineering Standard PROCESS DESIGN OF EMERGENCY MEASURES (PROJECT STANDARDS AND SPECIFICATIONS) Page 2 of 11 Rev: 01 Feb 2011
Download The International Journal of STD & AIDS is the official journal of the British Association of. Sexual Health & HIV (BASHH) and the International Union against Sexually Transmitted Infections. (IUSTI). The journal provides a clinically
in boreholes as per IS: 2131-1981. Disturbed Samples (DS) and undisturbed Samples (UDS) were collected as per IRC 78 – 2000 guidelines. Drilling in soft rock, weathered rock and in hard rock was carried out by diamond core drilling method using doubl
Feb 4, 2010 ... 11.2 Road Boundary Stones (RBS). 135. 11.3 Kilometer and 200m Stones. 135. 11.4 Roadside railings/Pedestrian Guard rails. 135. 11.5 Overhead Traffic Signs. 137. 11.6 Traffic Impact Attenuators. 137. 11.7 Road Delineators. 138 vi. MANU
Apr 10, 2015 ... Geometric Design and General Features. 13. 2.1. General. 13. 2.2. Design Speed . 14. 2.3. Right-of-Way. 14. 2.4. Lane width of Carriageway. 14. 2.5. Median. 14. 2.6 .... 147. 12.3. Street Lighting. 148. 12.4. Truck Lay-byes. 150 vi.
GENERAL Self-contained, wall hung electric refrigerated water cooler. Chilling capacity of 50°F drinking water, based upon 80°F inlet water and 90°F ambient
Rules for Classification and Construction. III Naval Ship Technology. 2. Sub- Surface Ships. 1. Submarines. Edition 2008 .... 2- 7. Section 3. Principles for Design and Construction. A. General Principles
Counterfeit Parts Standards and Certifications Dale K Gordon AS&D Accreditation Manager 20 JUL 2016
Listen to the instructions for each part of the paper carefully. Answer all the questions. When you are listening, write your answers on the question paper
DELHI DEVELOPMENT AUTHORITY UNIFIED TRAFFIC AND TRANSPORTATION INFRASTRUCTURE (PLG & ENGG) CENTRE ( U T T I P E C ) Guidelines and Design Specifications
Nov 20, 2016 ... mark of Lucent Technologies Inc. Nortel Networks and the Nortel Networks logo are trademarks of. Nortel Networks. Verizon Wireless is a trademark of ... Automatic Call Distribution, IP Station and IP Trunk support, ISDN compatibility
Rockwell Automation Publication 500-TD014C-EN-P - March 2017 3 NEMA Contactor and Starter Specifications Mechanical Ratings Construction Environmental
215 33 FLEETCRAFT ROUND LEG TRAILER LANDING GEAR ROUND LEG Item Part No.No. Description 24 T- L-J1219 Washer 25 T- L-6956-1Shaft, pinion 26 T- L-1351-A3 Grease fitting
NHAI
Technical Schedules
SCHEDULE – D (See Clause 2.1)
SPECIFICATIONS AND STANDARDS 1
Two-Laning The Concessionaire shall comply with the Specifications and Standards set forth in Annex-I of this Schedule-D for construction of the Two-Lane Project Highway.
Two laning of Dindigul-Theni section km 2.750 to 73.400 of NH-45(EXtn.) and Theni-Kumili section from km 215.500 to 273.600 of NH-220 in the state of Tamil Nadu ON DBFOT (Annuity) Basis Project
D-1
NHAI
Technical Schedules
Annex - I (Schedule-D)
Specifications and Standards for Two-Laning 1
Manual of Specifications and Standards to apply Subject to the provisions of Paragraph 2 of this Annex-I, Two-Laning of the Project Highway shall conform to the Manual of Specifications and Standards for DBFOT Road Projects published by the Indian road Congress (IRC No. IRC:SP:73-2007). (An authenticated copy of the Manual has been provided to the Concessionaire as part of the bid documents.)
2
Deviations from the Manual Notwithstanding anything to the contrary contained in the aforesaid Manual, the following Specifications and Standards shall apply to the Two-Lane Project Highway, and for purposes of this Agreement, the aforesaid Manual shall be deemed to be amended to the extent set forth below: S. No.
Clause
1
2.1(ii)a
2
2.5
3
7.1 (ii) & (vii)
4
Section 10 Toll Plazas
5
Add new clause
Description
Deviation
Carriage-way width in Carriageway width in Built up Areas shall be as specified in Built up Areas Schedule B (Ref. Description of cross sections) Width of the shoulders is Width of earthen (granular) shoulder shall be 1.00 m and paved 2.5 m on either side shoulder shall be 1.5m on either side throughout the project stretch except for the ghat section (existing chainage from 215+500 to 222+400 on NH 220). In case of Ghat section, it is as given in Schedule ‘B’. Width of Bridge at deck The width of the bridge at deck level shall be as specified in level Schedule ‘B’. Scope does not include provision of Scope fee collection staff. Rain Water Harvesting Rain Water Harvesting Structures shall be designed and provided as structures per the guide lines of MoEF and State Environmental Department.
Two laning of Dindigul-Theni section km 2.750 to 73.400 of NH-45(EXtn.) and Theni-Kumili section from km 215.500 to 273.600 of NH-220 in the state of Tamil Nadu ON DBFOT (Annuity) Basis Project